UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 5, 2012 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR ST. LUCIE NUCLEAR PLANT UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000335/2011007 AND 05000389/2011007)
Dear Mr. Nazar:
On February 15, 2012, the NRC staff completed its performance review of the St. Lucie Nuclear Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011.
This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, St. Lucie Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined plant performance during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
FPL 2
is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (404) 997-4721 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
Enclosure:
St. Lucie Nuclear Plant Inspection/
Activity Plan (03/01/12 - 06/30/13)
__PKG: ML120650215____
X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE DWR1 for MGD1 TLH4 DWR1 NAME GWilson MDonithan THoeg DRich DATE 03/05/12 03/01/12 03/01/12 03/05/12 E-MAIL COPY?
YES NO YES NO YES NO YES NO
FPL 3
cc w/encl:
Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution Daniel D. DeBoer Operations Site Director St. Lucie Nuclear Plant Electronic Mail Distribution Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and General Counsel Nuclear Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Bryan Koon Director Florida Division of Emergency Management Electronic Mail Distribution Donna Calabrese Emergency Preparedness Manager St. Lucie Plant Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010 Seth B. Duston Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution
FPL 4
Letter to Mano Nazar from Daniel W. Rich dated March 5, 2012
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR ST. LUCIE NUCLEAR PLANT UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000335/2011007 AND 05000389/2011007)
Distribution w/encl:
C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROP Reports Institute of Nuclear Power Operations (INPO)