MONTHYEARML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23039A1712023-02-0808 February 2023 NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22342B1472022-12-0808 December 2022 NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162) ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML22032A0962022-02-0101 February 2022 002 Radiation Safety Baseline Inspection Information Request ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22007A2672022-01-0707 January 2022 NRR E-mail Capture - North Anna, Unit 2, ASME Section XI Inservice Inspection Program Relief Request N2-14-LMT-003 Fourth Interval Third Period Limited Examinations (L-2021-LLR-0088) ML21335A0812021-12-0101 December 2021 NRR E-mail Capture - Acceptance Review for OMN-28 Request Alternative to ISTC-3700, Position Verification Testing (L-2021-LLR-0086) ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21312A0082021-11-0404 November 2021 Enclosure 2 - NAPS Draft SER Table A.1-1 Markup ML21312A0112021-11-0404 November 2021 Enclosure 3 - NAPS Draft SER Section 3 Comments ML21312A0012021-11-0404 November 2021 Comments on North Anna Draft SER ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21274A0022021-09-30030 September 2021 NRR E-mail Capture - Acceptance Review for TSTF-577 LAR (L-2021-LLA-0158) ML21312A0022021-09-21021 September 2021 Enclosure 1 - E-mail - NAPS SLR SER Appendix a for Dominion Review ML21312A0072021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure B - NAPS SER App a - Dominion Comments 9-21-2021 ML21312A0032021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure a - Dominion Table A4.4-1 Clean Version ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21152A1722021-09-0707 September 2021 NRC to Fws, NRC Issuance of Draft Environmental Impact Statement for North Anna Subsequent License Renewal, Opportunity for Public Comment, and Endangered Species Act Determinations ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21154A0152021-06-0101 June 2021 NRR E-mail Capture - Acceptance Review for Primary Grade Water LAR (L-2021-LLA-0082) ML21140A3682021-05-20020 May 2021 Response to North Anna Hardship (Temporary Staff Guidance Additional Guidance for FOF Inspections During the PHE) ML21140A3712021-05-19019 May 2021 FOF Discussion ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail ML21091A0022021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21069A3522021-03-10010 March 2021 NRR E-mail Capture - Acceptance Review for Topical Report DOM-NAF-2 VIPRE-D 2024-01-18
[Table view] Category:Press Release
MONTHYEARML22346A0522022-11-15015 November 2022 News Release-22-047: NRC to Review North Anna Subsequent License Renewal Report; Seeks Public Input on Environmental Issues Press Release-II-22-010, NRC Schedules Virtual Meeting to Discuss Safety Performance of North Anna and Surry Nuclear Power Plants2022-04-13013 April 2022 Press Release-II-22-010: NRC Schedules Virtual Meeting to Discuss Safety Performance of North Anna and Surry Nuclear Power Plants ML22063A4652022-03-0404 March 2022 News Release-II-22-002: NRC Names New Senior Resident Inspector at North Anna Nuclear Power Plant Press Release-21-037, NRC Webinar to Seek Comment on Draft Environmental Statement for North Anna Subsequent License Renewal2021-09-16016 September 2021 Press Release-21-037: NRC Webinar to Seek Comment on Draft Environmental Statement for North Anna Subsequent License Renewal ML21256A0872021-08-27027 August 2021 News Release-21-033: NRC Seeks Public Comment on Draft Environmental Impact Statement for North Anna Subsequent License Renewal Press Release-II-21-007, NRC Hosts Virtual Meeting to Discuss 2020 Safety Performance of V.C. Summer, North Anna and Surry Nuclear Power Plants2021-04-19019 April 2021 Press Release-II-21-007: NRC Hosts Virtual Meeting to Discuss 2020 Safety Performance of V.C. Summer, North Anna and Surry Nuclear Power Plants Press Release-20-052, NRC Seeks Public Comment on Environmental Review Topics for North Anna Subsequent License Renewal2020-10-23023 October 2020 Press Release-20-052: NRC Seeks Public Comment on Environmental Review Topics for North Anna Subsequent License Renewal Press Release-20-049, NRC Accepts Application for Subsequent License Renewal of North Anna Reactors2020-10-15015 October 2020 Press Release-20-049: NRC Accepts Application for Subsequent License Renewal of North Anna Reactors ML20351A1702020-09-11011 September 2020 News Release-20-045: NRC to Review North Anna'S Subsequent License Renewal Application Press Release-II-20-009, NRC Schedules Virtual Meeting to Discuss 2019 Safety Performance of North Anna and Surry Nuclear Power Plants2020-04-15015 April 2020 Press Release-II-20-009: NRC Schedules Virtual Meeting to Discuss 2019 Safety Performance of North Anna and Surry Nuclear Power Plants Press Release-II-19-024, NRC Schedules Open House to Discuss North Anna Nuclear Power Plant Performance2019-04-22022 April 2019 Press Release-II-19-024: NRC Schedules Open House to Discuss North Anna Nuclear Power Plant Performance ML19060A0952019-03-0101 March 2019 Press Release-II-9-006: NRC Names Senior Resident Inspector at North Anna Nuclear Plant Press Release-II-18-023, NRC to Hold Open House to Discuss 2017 Performance of Surry Nuclear Power Plant2018-05-0909 May 2018 Press Release-II-18-023: NRC to Hold Open House to Discuss 2017 Performance of Surry Nuclear Power Plant Press Release-II-17-020, NRC Schedules Open House to Discuss 2016 Performance of North Anna Nuclear Station2017-04-10010 April 2017 Press Release-II-17-020: NRC Schedules Open House to Discuss 2016 Performance of North Anna Nuclear Station Press Release-17-003, NRC Completes Safety Review of Proposed New Reactor at North Anna Site in Virginia2017-01-19019 January 2017 Press Release-17-003: NRC Completes Safety Review of Proposed New Reactor at North Anna Site in Virginia Press Release-II-16-019, NRC Schedules Open House to Discuss Agency'S 2015 Assessment of North Anna Nuclear Station2016-04-0707 April 2016 Press Release-II-16-019: NRC Schedules Open House to Discuss Agency'S 2015 Assessment of North Anna Nuclear Station Press Release-II-16-002, NRC Names New Senior Resident Inspector for North Anna Nuclear Power Station2016-02-0404 February 2016 Press Release-II-16-002: NRC Names New Senior Resident Inspector for North Anna Nuclear Power Station Press Release-15-068, NRC Accelerates Schedule for Earthquake Risk Analysis at U.S. Reactors2015-10-27027 October 2015 Press Release-15-068: NRC Accelerates Schedule for Earthquake Risk Analysis at U.S. Reactors Press Release-II-15-031, NRC Schedules Open House April 29 to Discuss Agency'S 2014 Assessment of North Anna Nuclear Station2015-04-21021 April 2015 Press Release-II-15-031: NRC Schedules Open House April 29 to Discuss Agency'S 2014 Assessment of North Anna Nuclear Station Press Release-II-14-054, NRC Assigns New Resident Inspector to North Anna Nuclear Station2014-10-28028 October 2014 Press Release-II-14-054: NRC Assigns New Resident Inspector to North Anna Nuclear Station Press Release-II-14-008, NRC Schedules Open House on March 20 to Discuss Safety Performance for Dominion'S North Anna Nuclear Plant2014-03-0707 March 2014 Press Release-II-14-008: NRC Schedules Open House on March 20 to Discuss Safety Performance for Dominion'S North Anna Nuclear Plant Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants2013-09-0606 September 2013 Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants Press Release-II-13-034, NRC Schedules Open House to Discuss Annual Assessment of North Anna Power Station2013-05-13013 May 2013 Press Release-II-13-034: NRC Schedules Open House to Discuss Annual Assessment of North Anna Power Station Press Release-12-099, NRC Issues Mid-Cycle Assessments for Nation? Nuclear Plants2012-09-0606 September 2012 Press Release-12-099: NRC Issues Mid-Cycle Assessments for Nation? Nuclear Plants Press Release-12-072, NRC Issues Annual Report on Abnormal Occurrences for Fy 20112012-06-12012 June 2012 Press Release-12-072: NRC Issues Annual Report on Abnormal Occurrences for Fy 2011 Press Release-II-12-035, NRC to Increase Oversight of North Anna Nuclear Power Plant2012-05-14014 May 2012 Press Release-II-12-035: NRC to Increase Oversight of North Anna Nuclear Power Plant Press Release-II-12-025, NRC Schedules Meeting to Discuss 2011 Performance of North Anna Nuclear Power Plant2012-04-23023 April 2012 Press Release-II-12-025: NRC Schedules Meeting to Discuss 2011 Performance of North Anna Nuclear Power Plant Press Release-II-12-018, NRC Schedules Regulatory Conference to Discuss Apparent Violation at North Anna Nuclear Station2012-04-11011 April 2012 Press Release-II-12-018: NRC Schedules Regulatory Conference to Discuss Apparent Violation at North Anna Nuclear Station Press Release-11-228, NRC Advisory Committee on Reactor Safeguards to Meet Jan. 19-20 in Rockville, Md.; 2012 Leadership and Meeting Schedule2011-12-27027 December 2011 Press Release-11-228: NRC Advisory Committee on Reactor Safeguards to Meet Jan. 19-20 in Rockville, Md.; 2012 Leadership and Meeting Schedule Press Release-11-212, NRC Approves Restart of North Anna Reactors, Will Ensure Dominion Meets Commitments2011-11-11011 November 2011 Press Release-11-212: NRC Approves Restart of North Anna Reactors, Will Ensure Dominion Meets Commitments Press Release-II-11-060, NRC Schedules Nov. 1 Meeting to Discuss Restart Readiness at North Anna Nuclear Power Station2011-10-24024 October 2011 Press Release-II-11-060: NRC Schedules Nov. 1 Meeting to Discuss Restart Readiness at North Anna Nuclear Power Station Press Release-11-192, NRC to Discuss North Anna Restart Review Oct. 21 in Rockville, MD2011-10-0707 October 2011 Press Release-11-192: NRC to Discuss North Anna Restart Review Oct. 21 in Rockville, MD Press Release-11-183, NRC Confirms Post-Earthquake Requirements for the North Anna Nuclear Power Plant2011-09-30030 September 2011 Press Release-11-183: NRC Confirms Post-Earthquake Requirements for the North Anna Nuclear Power Plant Press Release-II-11-056, NRC Schedules Meeting Oct. 3 to Discuss Inspection at North Anna Nuclear Power Station2011-09-20020 September 2011 Press Release-II-11-056: NRC Schedules Meeting Oct. 3 to Discuss Inspection at North Anna Nuclear Power Station ML12054A0822011-09-16016 September 2011 Email from A. Howe, NRR to M. Khanna, NRR Et Al. FW: Draft News Release for Na AIT Exit Press Release-11-167, NRC to Meet with Dominion Sept. 8 to Discuss Ongoing Post-Earthquake Actions at North Anna Nuclear Power Station2011-09-0707 September 2011 Press Release-11-167: NRC to Meet with Dominion Sept. 8 to Discuss Ongoing Post-Earthquake Actions at North Anna Nuclear Power Station Press Release-II-11-052, NRC Sends Augmented Inspection Team to North Anna Nuclear Power Station2011-08-29029 August 2011 Press Release-II-11-052: NRC Sends Augmented Inspection Team to North Anna Nuclear Power Station Press Release-11-157, NRC Continues to Assess North Anna Nuclear Power Plant Following Virginia Earthquake2011-08-24024 August 2011 Press Release-11-157: NRC Continues to Assess North Anna Nuclear Power Plant Following Virginia Earthquake Press Release-II-11-050, NRC Names New Senior Resident Inspector at North Anna Nuclear Power Plant2011-08-24024 August 2011 Press Release-II-11-050: NRC Names New Senior Resident Inspector at North Anna Nuclear Power Plant Press Release-11-153, NRC Monitoring Alert at North Anna Following Virginia Earthquake2011-08-23023 August 2011 Press Release-11-153: NRC Monitoring Alert at North Anna Following Virginia Earthquake Press Release-II-11-011, NRC Schedules Open House to Discuss 2010 Performance of North Anna Nuclear Power Plant2011-03-29029 March 2011 Press Release-II-11-011: NRC Schedules Open House to Discuss 2010 Performance of North Anna Nuclear Power Plant Press Release-11-015, Licensing Board to Hear Oral Argument March 3 on North Anna New Nuclear Reactor License Application2011-02-0303 February 2011 Press Release-11-015: Licensing Board to Hear Oral Argument March 3 on North Anna New Nuclear Reactor License Application Press Release-II-10-068, NRC Begins Special Inspection at North Anna Nuclear Plant2010-10-0505 October 2010 Press Release-II-10-068: NRC Begins Special Inspection at North Anna Nuclear Plant Press Release-10-154, National Academy of Sciences Seeks Nominations for Experts to Conduct NRC-Sponsored Cancer Risk Study2010-09-0303 September 2010 Press Release-10-154: National Academy of Sciences Seeks Nominations for Experts to Conduct NRC-Sponsored Cancer Risk Study Press Release-II-10-032, NRC Schedules Open House to Discuss 2009 Performance of North Anna Nuclear Power Plant2010-04-26026 April 2010 Press Release-II-10-032: NRC Schedules Open House to Discuss 2009 Performance of North Anna Nuclear Power Plant Press Release-09-175, NRC Approves Power Uprate for North Anna Nuclear Power Plant2009-10-22022 October 2009 Press Release-09-175: NRC Approves Power Uprate for North Anna Nuclear Power Plant Press Release-II-09-016, NRC to Discuss 2008 Performance of North Anna Nuclear Power Plant2009-03-25025 March 2009 Press Release-II-09-016: NRC to Discuss 2008 Performance of North Anna Nuclear Power Plant Press Release-II-08-009, NRC to Discuss 2007 Performance of North Anna Nuclear Power Station2008-03-19019 March 2008 Press Release-II-08-009: NRC to Discuss 2007 Performance of North Anna Nuclear Power Station Press Release-II-07-035, - NRC Sends Special Inspection Team to North Anna Nuclear Plant to Assess and Inspect June 29 Unplanned Shutdown of Unit 22007-07-0303 July 2007 Press Release-II-07-035 - NRC Sends Special Inspection Team to North Anna Nuclear Plant to Assess and Inspect June 29 Unplanned Shutdown of Unit 2 Press Release-II-07-020, NRC to Discuss 2006 Performance at North Anna Nuclear Plant2007-04-13013 April 2007 Press Release-II-07-020: NRC to Discuss 2006 Performance at North Anna Nuclear Plant 2022-04-13
[Table view] |
Text
.i-t
'Yr From: Howe, Allen Sent: Friday, September 16, 2011 10:51 AM To: Khanna, Meena; Martin, Robert; Boyle, Patrick.
Subject:
FW: Draft News Release for NA AIT Exit Attachments: 11-056.doc Comments?
From: Croteau, Rick \\L \\
Sent: Friday, September 16, 2011 10:02 AM To: Howe, Allen
Subject:
FW: Draft News Release for NA AIT Exit
- Allen, Attached is the press release we plan to issue next week. We aren't looking for concurrence, but we would welcome any comments you may have.
Rick From: Hannah, Roger Sent: Friday, Septemb r 16, 2011 9:49 AM To: McCoy, Gerald; Franke, Mark; Kolcum, Gregory; Croteau, Rick; Jones, William
Subject:
Draft News Release for NA AIT Exit Please review the attached release and provide me with your approval or suggestions by Monday if possible...
Thanks and have a good weekend, Roger Hannah, APR Senior Public Affairs Officer Region II -- Atlanta, Ga.
Office - 404-997-4417 roger.hannah(cDnrc.gov 1fU.SU.NRC United S 'te,'a Nu dle. rrý, Commision Ret*
.ProtectingAno'pk amd tJe Eion 1-.pentt 1
P,79
NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Site: www.nrc.gov Blog: http://public-blog.nrc-gateway.gov No: 11-11-056 September 20, 2011 CONTACT: Roger Hannah (404) 997-4417 E-mail: OPA2.Resourceanrc.gov Joey Ledford (404) 997-4416 NRC SCHEDULES MEETING OCT. 3 TO DISCUSS INSPECTION AT NORTH ANNA NUCLEAR POWER STATION The Nuclear Regulatory Commission staff has scheduled a public meeting near the North Anna nuclear power station to discuss the preliminary results of an Augmented Inspection Team which reviewed the effects of the Aug. 23 earthquake and the plant response.
The meeting is scheduled for Monday, Oct. 3, at 1 p.m. EDT at the North Anna Nuclear Information Center, 1022 Haley Drive in Mineral, Va. The meeting will be attended by members of the NRC inspection team as well as managers from NRC headquarters in Rockville, Md. and the Region 1I office in Atlanta. After the results are presented, NRC staff will be available to answer questions from media representatives and the public.
After the quake, the North Anna station's two units automatically shut down. The company declared an Alert, the next to lowest NRC emergency classification for plant events and exited the Alert after the plant staff returned offsite power supplies. The NRC determined that an Augmented Inspection Team or AIT was the appropriate level of follow-up inspection.
An AIT is formed by the NRC to review more significant events or issues at NRC-licensed facilities. The North Anna AIT included technical experts from NRC headquarters in Rockville, Md. as well as inspectors from the regional office in Atlanta. It was led by NRC Region II Branch Chief Mark Franke and North Anna Senior Resident Inspector Greg Kolcum.
The station remains shut down and NRC regulations require that the station not start up until it can demonstrate that no functional damage occurred to those features needed for continued safe operation.