ML12053A010

From kanterella
Jump to navigation Jump to search
Registration for Use of General License Spent Fuel Cask Number 123
ML12053A010
Person / Time
Site: Oconee, 07201004  Duke Energy icon.png
Issue date: 02/20/2012
From: Gillespie T
Duke Energy Carolinas
To:
Document Control Desk, NRC/NMSS/SFPO
References
Download: ML12053A010 (2)


Text

I Duke Duker T.PRESTON GILLESPIE, JR.

Vice President

  • Energy. Oconee Nuclear Station Duke Energy ONOI VP / 7800 Rochester Hwy.

Seneca, SC 29672 864-873-4478 864-873-4208 fax T.Gillespie@duke-energy.com February 20, 2012 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Renewed Operating Licenses: DPR-38, 47, and 55 Docket Numbers: 50-269, 270, and 287 Registration for Use of General License Spent Fuel Cask Number 123 In accordance with 10CFR72.212 (b)(2), Duke Energy Carolinas, LLC, hereby notifies the Commission of storage of dry fuel under Cask Certificate of Compliance 72-1004, Amendment 9. The date of storage was January 20, 2012, and the cask load number was 123. The cask model is the Standardized NUHOMS 24PHB and the dry storage canister identification number is ONS-24PHBL-HZ123. The physical storage location at Oconee Nuclear Station's Independent Spent Fuel Storage Installation is Module E-57.

If there are any questions regarding this registration, please contact Stephen C. Newman, Oconee Regulatory Compliance Group, at (864) 873-4388.

Sincerely, reston Gillespie. Jr.,

Vice President, Oconee Nuclear Station cDýJ www. duke-energy.corn

U. S. Nuclear Regulatory Commission February 20, 2012 Page 2 cc:

Mr. Michael F. Weber, Director Office of Nuclear Material Safety and Safeguards Mailstop: EBB1 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. John M. Goshen. Project Manager Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Mailstop: E3 D2M U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. John Stang, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 8 G9A Washington, D. C. 20555-0001 Mr. Cecil A. Fletcher Senior Fuel Facility Inspector U. S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Robert P. Carrion Senior Fuel Facility Inspector U. S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Victor McCree, Regional Administrator U. S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Andy Sabisch U. S. Nuclear Regulatory Commission Senior Resident Inspector Oconee Nuclear Station