ML12052A306

From kanterella
Jump to navigation Jump to search
E-mail from M. Khanna, NRR to C. Roquecruz, NRR on Boxer Question
ML12052A306
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/13/2011
From: Meena Khanna
Plant Licensing Branch 1
To: Carla Roque-Cruz
Division of Engineering
References
FOIA/PA-2011-0357
Download: ML12052A306 (1)


Text

Uribe, Juan

,32*

From:

Khanna, Meena Sent:

Tuesday, September 13, 2011 3:19 PM To:

Roquecruz, Carla Cc:

Uribe, Juan; Manoly, Kamal

Subject:

boxer question Carla, pis use this response for clarification Juan, pls revise in comm. plan..thanks Q4. There have been reports that the plant was designed to withstand a 5.9-6.1 magnitude earthquake and the earthquake experienced was a 5.8 magnitude earthquake. Given the current understanding of the seismic risks, describe the difference in the margin of safety assumed at the time the plant was built versus when the earthquake occurred.

Answer to Q4:

As indicated in the response to Q3 above, the design of NAPS is based on a Modified Mercalli Intensity (MMI) of VII. This intensity does not correlate directly with the measured magnitude 5.8 experienced at the plant site.

The preliminary information on the measured response spectra from the ground motion experienced by plant structures indicates that the ground motion may have exceeded the design spectra at certain frequencies, however, well within the IPEEE review level earthquake mentioned above, except for some structures and components whose capacity are yet to be verified. This does not appear to appreciably encroach on the built-in seismic design margin of safety related structures and components. It should be noted that the ground response spectrum from the recent earthquake experienced at North Anna is weaker than the anticipated response spectrum the licensee would be expected to use in its seismic risk evaluation in conjunction with the response to the proposed generic letter for Generic Issue 199, "Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants," currently under development.

Meena Khanna, Branch Chief Mechanical and Civil Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation (301)415-2150 meena.khanna@nrc.qov 372