MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] Category:Federal Register Notice
MONTHYEARML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter ML23297A2552023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - FRN ML23234A1542023-10-11011 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (FRN) ML22220A1292022-10-25025 October 2022 Exemptions from the Requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.46, 10 CFR 50 Appendix a General Design Criteria 35, 38, and 41 (EPID L-2021-LLE-0021) (FRN) ML22182A4062022-08-23023 August 2022 FRN - Environmental Assessment & Finding of No Significant Impact Requests for Amendment & Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (EPID L-2021-LLA-0059 & L-2021-LLE-0021) ML22182A4112022-08-23023 August 2022 Letter - Environmental Assessment & Finding of No Significant Impact Requests for Amendment & Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (EPID L-2021-LLA-0059 & L-2021-LLE-00021) ML21028A0122021-02-18018 February 2021 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for January 2021 ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20304A2862020-11-20020 November 2020 Federal Register Notice for COVID-19 October 2020 Group Exemptions ML20246G5702020-10-16016 October 2020 Issuance of Amendment No. 223 One-Time Deferral of the Steam Generator Tube Inspections ML20190A0822020-07-20020 July 2020 FRN - Notice of Consideration of Issuance of Amendment to RFOL, Proposed Nshcd, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information ML20190A0812020-07-15015 July 2020 Letter - Notice of Consideration of Issuance of Amendment to RFOL, Proposed Nshcd, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 ML19140A4562019-05-28028 May 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 06/04/2019 NRC-2016-0273, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 20172016-12-21021 December 2016 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 2017 ML16355A2612016-12-21021 December 2016 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 2017 ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 ML15148A3762015-06-0101 June 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Published June 9, 2015 ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML15022A6532015-01-26026 January 2015 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 3, 2015 ML14252A6432014-11-0505 November 2014 FRN-Notice of Availability of the Final Plant-Specific Supplement 51 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Callaway Plant, Unit 1 ML14056A4182014-02-26026 February 2014 Correction ML14043A5362014-02-12012 February 2014 (FRN) Notice of Availability of the Draft Plant-Specific Supplement 51 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Callaway Plant, Unit 1 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit NRC-2012-0275, FRN, Withdrawal of an Amendment Request, Revise Surveillance Requirement 3.6.6.3 for Cooling Water Flow Rate in Technical Specification 3.6.6, Containment Spray and Cooling Systems2012-11-0505 November 2012 FRN, Withdrawal of an Amendment Request, Revise Surveillance Requirement 3.6.6.3 for Cooling Water Flow Rate in Technical Specification 3.6.6, Containment Spray and Cooling Systems ML12305A1952012-11-0505 November 2012 FRN, Withdrawal of an Amendment Request, Revise Surveillance Requirement 3.6.6.3 for Cooling Water Flow Rate in Technical Specification 3.6.6, Containment Spray and Cooling Systems ML12305A1942012-11-0505 November 2012 Withdrawal of an Amendment Request ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12024A2542012-02-16016 February 2012 Notice of Opportunity for Hearing, Regarding Renewal of Facility Operating License No. NPF-30 for an Additional 20-year Period, Federal Register Notice ML12040A2152012-02-14014 February 2012 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for Callaway Plant, Unit 1 ML12024A2622012-02-14014 February 2012 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from Union Electric Company, for Renewal of the Operating License for Callaway Plant, Unit 1 ML11343A0872011-12-23023 December 2011 Notice of Receipt and Availability of Application for Renewal of Callaway Plant, Unit 1 - Federal Register Notice ML11343A0602011-12-23023 December 2011 Receipt and Availability of the License Renewal Application for the Callaway Plant, Unit 1 NRC-2011-0276, Notice of Receipt and Availability of Application for Renewal of Callaway Plant, Unit 1 - Federal Register Notice2011-12-23023 December 2011 Notice of Receipt and Availability of Application for Renewal of Callaway Plant, Unit 1 - Federal Register Notice NRC-2011-0290, Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 20112011-12-15015 December 2011 Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 2011 ML11349A0052011-12-15015 December 2011 Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 2011 ML1132502102011-11-22022 November 2011 Individual Notice of Consideration of Issuance of Amendment to Add New Surveillance Requirement 3.3.8.6 to Technical Specification 3.3.8, Emergency Exhaust System (EES) Actuation Instrumentation ML1132502002011-11-22022 November 2011 Letter, Individual Notice of Consideration of Issuance of Amendment to Add New Surveillance Requirement 3.3.8.6 to Technical Specification 3.3.8, Emergency Exhaust System (EES) Actuation Instrumentation. NRC-2011-0205, FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/112011-08-25025 August 2011 FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11 ML11237A0072011-08-25025 August 2011 FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11 ML1122302752011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 NRC-2011-0187, Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/20112011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 ML1033303052010-12-28028 December 2010 Frn:General Notice. Ameren Missouri Combined License Application for Callaway Plant Unit 2 Environmental Assessment and Finding of No Significant Impact ML1009103092010-04-0707 April 2010 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) (Tac No. ME3595) ML1009103222010-04-0707 April 2010 Exigent 14-day Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, for Function 6.g in TS Table 3.3.2-1 NRC-2010-0151, Exigent 14-day Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, for Function 6.g in TS Table 3.3.2-12010-04-0707 April 2010 Exigent 14-day Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, for Function 6.g in TS Table 3.3.2-1 ML0905800142009-02-26026 February 2009 Sholly Report for Fr Publication Date March 10th 2009 ML0835102082008-12-18018 December 2008 Withdrawal Federal Register Notice License Amendment Request to Revise Technical Specification 3.7.2, Main Steam Isolation Valves (Msivs), and Add New TS 3.7.19, Secondary System Isolation Valves (Ssivs) ML0834700412008-12-16016 December 2008 Individual Notice of Consideration of Issuance of Amendment, Proposed No Significant Hazards Consideration Change in Plant Modification Dates for Replacement of Essential Service Water Train B Carbon Steel Piping 2023-11-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 14, 2012 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Callaway Plant, Unit 1 Union Electric Company P,O. Box 620 Fulton, MO 65251
SUBJECT:
NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT AND CONDUCT SCOPING PROCESS FOR LICENSE RENEWAL FOR CALLAWAY PLANT, UNIT 1
Dear Mr. Heflin:
The US. Nuclear Regulatory Commission staff (NRC or the staff) has received your application dated December 15, 2011, for the renewal of the Operating License NPF-30 for Callaway Plant, Unit 1 (Callaway). In support of the application and in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 51 and Part 54, Union Electric Company also submitted an environmental report for Callaway, This letter provides information related to the staff's environmental review of the application.
The NRC has prepared a notice of intent advising the public that the NRC intends to gather information necessary to prepare a plant-specific supplement to the Commission's "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" (NUREG-1437),
related to the review of the application for the renewal of the Callaway operating license, Enclosed is a copy of the Notice of Intent, which has been forwarded to the Office of the Federal Register for publication, Pursuant to 10 CFR 51.28, Callaway IS invited to participate in the environmental scoping process, As discussed in the enclosed notice, the staff is providing the public with the opportunity to participate in two environmental scoping meetings to be held on March 14, 2012 The meetings will be held at the Fulton City Hall, 18 East 4th Street, Fulton, MO 65251. The first session will be held in the afternoon, and the second session, covenng the same subjects.
will be held in the evening. The NRC will present an overview of the environmental review process and Will describe how the process will be implemented for the review of the Callaway license renewal application.
A. Heflin -2 A separate NRC meeting notice with a more detailed agenda is forthcoming. You will be provided a copy of that notice.
In the interim, should you have any questions regarding the scoping meeting, please contact the NRC's Environmental Project Manager, Ms. Carmen Fells, at 301-415-6337 or bye-mail at Carmen.Fells@nrc.gov.
Sincerely, oJ 9 iV'-___
David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
As stated cc w/encl: Listserv
[7590-01-P]
NUCLEAR REGULATORY COMMISSION UNION ELECTRIC COMPANY NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT AND CONDUCT THE SCOPING PROCESS FOR CALLAWAY PLANT, UNIT 1 DOCKET NO. 50-483; NRC-2012-0001 Union Electric Company, a subsidiary of Ameren Corporation and doing business as Ameren Missouri (Ameren), has submitted an application for renewal of Facility Operating License NPF-30 for an additional 20 years of operation at Callaway Plant, Unit 1 (Callaway).
Callaway is located in Callaway County, MO.
The current operating license for Callaway expires on October 18, 2024. The application for renewal, dated December 15, 2011, was submitted pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 54, which included an environmental report (ER). A separate notice of receipt and availability of the application was published in the Federal Register on January 3, 2012 (77 FRN 142). A notice of acceptance for docketing of the application and opportunity for hearing regarding renewal of the facility operating license is also being published in the Federal Register. The purpose of this notice is to inform the public that the U.S. Nuclear Regulatory Commission (NRC) will be preparing an environmental impact statement (EIS) related to the review of the license renewal application and to provide the public an opportunity to participate in the environmental scoping process, as defined in 10 CFR 51.29.
As outlined in 36 CFR 800.8, "Coordination with the National Environmental Policy Act," the NRC plans to coordinate compliance with Section 106 of the National Historic Preservation Act (NHPA) in meeting the requirements of the National Environmental Policy Act
- 2 of 1969 (NEPA). Pursuant to 36 CFR 8QQ.8(c), the NRC intends to use its process and documentation for the preparation of the EIS on the proposed action to comply with Section 10.6 of the NHPA, in lieu of the procedures set forth at 36 CFR 80.0..3 through 80.0..6.
In accordance with 10. CFR 51.53(c) and 10. CFR 54.23, Ameren submitted the ER as part of the application. The ER was prepared pursuant to 10. CFR Part 51 and is publicly available at the NRC Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20.852, or from the NRC's Agencywide Documents Access and Management System (ADAMS). The ADAMS Public Electronic Reading Room is accessible at http://www.nrc.gov/reading-rm/adams.html. From this page, the public can gain entry into ADAMS, which provides text and image files of NRC's public documents. The ADAMS Accession Number for the Callaway ER is ML11353Q374. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC's PDR reference staff by telephone at 80.0.-397-420.9 or 30.1-415-4737 or bye-mail at pduesource@nrc.gov. The ER may also be viewed on the Internet at http://www.nrc.gov/reactors/operatinq//icensing!renewal/applications/callaway.html. In add ition, the ER is available to the public near the site at the Callaway County Public Library, 710. Court Street, Fulton, MO 65251.
Public comments and supporting materials related to this notice can be found at the Federal Rulemaking website, http://www.regulations.gov, by searching on Docket ID NRC-2012-Qo.Q1.
This notice advises the public that the NRC intends to gather the information necessary to prepare a plant-specific supplement to the NRC's "Generic Environmental Impact Statement (GElS) for License Renewal of Nuclear Plants" (NUREG-1437), related to the review of the application for renewal of the Callaway operating license for an additional 20. years.
-3 Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. The NRC is required by 10 CFR 51.95 to prepare a supplement to the GElS in connection with the renewal of an operating license. This notice is being published in accordance with NEPA and the NRC's regulations found in 10 CFR Part 51.
The NRC will first conduct a scoping process for the supplement to the GElS and, as soon as practicable thereafter, will prepare a draft supplement to the GElS for public comment.
Participation in the scoping process by members of the public and local, State, Tribal, and Federal government agencies is encouraged. The scoping process for the supplement to the GElS will be used to accomplish the following:
- a. Define the proposed action, which is to be the subject of the supplement to the GElS;
- b. Determine the scope of the supplement to the GElS and identify the significant issues to be analyzed in depth;
- c. Identify and eliminate from detailed study those issues that are peripheral or that are not significant;
- d. Identify any environmental assessments and other EISs that are being or will be prepared that are related to, but are not part of, the scope of the supplement to the GElS being considered;
- e. Identify other environmental review and consultation requirements related to the proposed action;
- f. Indicate the relationship between the timing of the preparation of the environmental analyses and the Commission's tentative planning and decision-making schedule;
- g. Identify any cooperating agencies and, as appropriate. allocate assignments for preparation and schedules for completing the supplement to the GElS to the NRC and any cooperating agencies; and
- h. Describe how the supplement to the GElS will be prepared and include any contractor
- 4 assistance to be used.
The !\IRC invites the following entities to participate in scoping:
- a. The applicant, Ameren;
- b. Any Federal agency that has jurisdiction by law or special expertise with respect to any environmental impact involved or that is authorized to develop and enforce relevant environmental standards;
- c. Affected State and local government agencies, including those authorized to develop and enforce relevant environmental standards;
- d. Any affected Indian tribe;
- e. Any person who requests or has requested an opportunity to participate in the scoping process; and
- f. Any person who has petitioned or intends to petition for leave to intervene.
In accordance with 10 CFR 51.26, the scoping process for an EIS may include a public scoping meeting to help identify significant issues related to a proposed activity and to determine the scope of issues to be addressed in an EIS. The NRC has decided to hold public meetings for the Callaway license renewal supplement to the GElS. The scoping meetings will be held on March 14, 2012, and there will be two sessions to accommodate interested parties.
The first session will convene at 2:00 p.m. and will continue until 4:00 p.m., as necessary. The second session will convene at 7:00 p.m. with a repeat of the overview portions of the meeting and will continue until 9:00 p.m., as necessary. Both sessions will be held at the Fulton City Hall, 18 East 4th Street, Fulton, MO 65251.
Both meetings will be transcribed and will include: (1) an overview by the NRC staff of the NEPA environmental review process, the proposed scope of the supplement to the GElS, and the proposed review schedule; and (2) the opportunity for interested government agencies, organizations. and individuals to submit comments or suggestions on the environmental issues
- 5 or the proposed scope of the supplement to the GElS. Additionally, the NRC staff will host informal discussions one hour prior to the start of each session at the same location. No formal comments on the proposed scope of the supplement to the GElS will be accepted during the informal discussions. To be considered, comments must be provided either at the transcribed public meetings or in writing, as discussed below.
Persons may register to attend or present oral comments at the meetings on the scope of the NEPA review by contacting the NRC Project Manager, Ms. Carmen Fells, by telephone at 800-368-5642, extension 6337, or bye-mail at Carmen.Fells@nrc.gov no later than March 7, 2012, Members of the public may also register to speak at the meeting within 15 minutes of the start of each session. Individual oral comments may be limited by the time available, depending on the number of persons who register. Members of the public who have not registered may also have an opportunity to speak if time permits, Public comments will be considered in the scoping pro(';;.ss for the supplement to the GElS. Ms. Fells will need to be contacted no later than March 5, 2012, if special equipment or accommodations are needed to attend or present information at the public meeting so that the NRC staff can determine whether the request can be accommodated.
ADDRESSES: You may submit comments by anyone of the following methods.
Please include Docket ID NRC-2012-0001 in the subject line of your comments. Comments submitted in writing or in electronic form will be posted on the NRC website and on the Federal rulemaking website http://www.Regulations,gov. Your comments will not be edited to remove any identifying or contact information, therefore, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed.
The NRC requests that any party soliciting or aggregating comments received from other persons for submission to the NRC inform those persons that the NRC will not edit their
-6 comments to remove any identifying or contact information, and therefore, they should not include any information in their comments that they do not want publicly disclosed.
Federal Rulemaking Website: Go to http://wwwRegulations.gov and search for documents filed under Docket ID NRC-2012-0001. Address questions about NRC dockets to Ms. Carol Gallagher, 301-492-3668 or bye-mail atCaroI.Gallagher@nrc.gov.
Mail comments to: Ms. Cindy Bladey, Chief, Rules, Announcements and Directives Branch (RADB), Division of Administrative Services, Office of Administration, Mail Stop:
TWB-05-B01 M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by fax to RADB at 301-492-3446. To be considered in the scoping process, written comments should be postmarked by [60 DAYS FROM DATE OF PUBLICATION IN THE FEDERAL REGISTER].
Comments will be available electronically and accessible through ADAMS at http://www.nrc.gov/reading-rm/adams.html.
You can access publicly available documents related to this notice using the following methods:
NRC's Public Document Room (PDR): The public may examine and have copied for a fee, publicly available documents at the NRC's PDR, Public File Area 01 F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
Federal Rulemaking Website: Public comments and supporting materials related to this notice can be found at http://wwwRegulations.gov by searching on Docket ID:
NRC-2012-0001.
-7 Participation in the scoping process for the supplement to the GElS does not entitle participants to become parties to the proceeding to which the supplement to the GElS relates.
Matters related to participation in any hearing are outside the scope of matters to be discussed at this public meeting. The notice of acceptance for docketing of the application and opportunity for hearing that was published in the Federal Register describes the hearing process.
Dated at Rockville, Maryland, this 14th day of February, 2012.
FOR THE NUCLEAR REGULATORY COMMISSION
-"
dJ 9-David J. Wrona, Chief w~_
Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation
A. Heflin -2 A separate NRC meeting notice with a more detailed agenda is forthcoming. You will be provided a copy of that notice.
In the interim, should you have any questions regarding the scoping meeting, please contact the NRC's Environmental Project Manager, Ms. Carmen Fells, at 301-415-6337 or bye-mail at Carmen. Fells@nrc.gov.
Sincerely, IRA!
David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
As stated cc w/encl: Listserv HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource ADAMS Accession Nos .. ML12040A293 (Package), ML12040A215(Letter),
ML12040A225(Federal Re ister Notice OFFICE LA:RPB2:DLR PM:RPB1: PM:RPB2:DLR BC: RPB1 :DLR ME IKing BHarris CFelis DMorey DATE 2 2/9/12 2/10/12 OFFICE NAME AGhosh DWrona DATE 2/10/12 2/14/12 OFFICIAL RECORD COpy