UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 27, 2012 Mr. Regis T. Repko Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR MCGUIRE NUCLEAR STATION Dear Mr. Repko In a letter dated August 11, 2011, your staff responded to Regulatory Issue Summary 2011-04 and requested we schedule initial license operator examinations for the McGuire Nuclear Station. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:

Plant / Station 2012 2013 Date Applicants Date Applicants McGuire 8/20 18 12/2*

13

  • Changed from your original requested date On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.

If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.

DEC 2

A supplementary letter will be sent to each stations training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at 404-997-4436.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Joel T. Munday, Director Division of Reactor Safety Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 cc: (See page 3)

_ML120300350________________________

G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA RA NAME M Bates MWidmann M.Franke J Munday DATE 1/26/2012 1/26/2012 1/26/2012 1/27/2012 1/ /2012 1/ /2012 1/ /2012 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

DEC 3

cc:

Beth J. Horsley Wholesale Customer Relations Duke Energy Corporation Electronic Mail Distribution Charles J. Thomas Fleet Licensing Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Clark E. Curry Engineering Manager McGuire Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution David A. Cummings Associate General Counsel Duke Energy Corporation Electronic Mail Distribution H. Duncan Brewer Safety Assurance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Kay L. Crane Senior Licensing Specialist McGuire Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Luellen B. Jones Fleet Licensing Engineer Duke Energy Carolinas, LLC Electronic Mail Distribution M. Christopher Nolan Fleet Safety Assurance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Steven D. Capps Station Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Peter Schuerger Training Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Kenneth L. Ashe Regulatory Compliance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Lara S. Nichols Vice President-Legal Duke Energy Corporation Electronic Mail Distribution David A. Repka Winston Strawn LLP Electronic Mail Distribution County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution David A. Baxter Vice President, Nuclear Engineering General Office Duke Energy Carolinas, LLC Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission William B. McGuire Nuclear Station 12700 Hagers Ferry Rd Huntersville, NC 28078

DEC 4

Letter to Regis T. Repko from Joel T. Munday dated January 27, 2012

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR MCGUIRE NUCLEAR STATION Distribution:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail V. McCree L. Wert J. Munday H. Christensen M. Widmann M. Franke K. Schaaf J. Vincent J. Kirby J. Bartley J. McHale Document Control Desk - Licensing RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource