ML12027A050

From kanterella
Jump to navigation Jump to search
Annual Radioactive Effluent Release Report for Independent Spent Fuel Spent Installation - 2011
ML12027A050
Person / Time
Site: San Onofre, 07201029  Southern California Edison icon.png
Issue date: 01/24/2012
From: Bauder D
Southern California Edison Co
To:
Document Control Desk, NRC/NMSS/SFST
References
Download: ML12027A050 (1)


Text

SOUTHERN CALIFORNIA Douglas R. Bauder EDISON Site Vice President & Station Manager San Onofre Nuclear Generati ng Station An EDISON INTERNATIONAL Compa ny 10 CFR 72.44( d)(3)

January 24, 2012 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362, 72-41 Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2011 San Onofre Nuclear Generation Station Units 1, 2 and 3

Dear Sir or Madam :

In accordance with 10 CFR 72.44(d)(3) and Certificate of Compliance No. 72-1029, Amendments 0 and 1, Technical Specification Section 5.2.3(c), Southern California Edison (SCE) is providing the Annual Radioactive Effluent Release Report for the Independent Spent Fuel Storage Installation (ISFSI) at San Onofre Nuclear Generating Station (SONGS).

The period of the report is January 1, 2011 through December 31, 2011.

The dry shielded canisters are double seal welded and designed to meet the criteria of Interim Staff Guidance-18 and thus prevent effluent releases. In addition , we have completed in-process inspections and tests during the fabrication and sealing of the canisters in compliance with the amendments to the Certificate of Compliance stated above. On that basis , SCE is reporting there were no releases of principal radionuclides in liquid or gaseous effluents from the SONGS ISFSI to the environment in 2011.

If you require addit ional information, please contact Mr. Ryan I. Treadway at (949) 368-9985.

cc: E. E. Collins , NRC Regional Administrator, Region IV J. C. Shepherd, NRC Project Manager, SONGS Unit 1 G. G. Warnick, NRC Senior Resident Inspector, SONGS Units 2 and 3 C. M. Staab, NRC Project Manager, SONGS ISFSI S. Y. Hsu, California Department of Public Health P.O. Box 128 San Clemente, CA 92 672 (949) 368-9275 PAX 892 75 Fax: (949 ) 368-9881 Doug.Bauder@sce.com