ML12025A015

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review for VEGP - RCP Flywheel Inspection Frequency TS 5.5.7
ML12025A015
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/24/2012
From: Patrick Boyle
Plant Licensing Branch II
To: Ajluni M
Southern Nuclear Operating Co
References
TAC ME7839, TAC ME7840
Download: ML12025A015 (2)


Text

NRR-PMDAPEm Resource From: Boyle, Patrick Sent: Tuesday, January 24, 2012 1:07 PM To: Boyle, Patrick; 'Ajluni, Mark J.'; 'Stringfellow, N. Jack'; 'Hill, Lesa P.'; 'McKinney, B. Doug' Cc: Martin, Robert; Govan, Tekia

Subject:

Acceptance Review for VEGP - RCP Flywheel Inspection Frequency TS 5.5.7 Mr. Ajluni:

By letter dated January 12, 2012, Southern Nuclear Operating Company, Inc. submitted a license amendment request (NL-11-0007), for the Vogtle Electric Generating Plant Units 1 and 2, "Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Improvement Process." The purpose of this e-mail is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to continue its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal addresses the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Patrick Boyle, Project Manager LPL 2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation TAC Nos: ME7839 and ME7840 Docket: 50-424 and 50-425 1

Hearing Identifier: NRR_PMDA Email Number: 245 Mail Envelope Properties (C070F82E831E1C44879BFA258CF960C97E5A84E0A1)

Subject:

Acceptance Review for VEGP - RCP Flywheel Inspection Frequency TS 5.5.7 Sent Date: 1/24/2012 1:06:58 PM Received Date: 1/24/2012 1:06:00 PM From: Boyle, Patrick Created By: Patrick.Boyle@nrc.gov Recipients:

"Martin, Robert" <Robert.Martin@nrc.gov>

Tracking Status: None "Govan, Tekia" <Tekia.Govan@nrc.gov>

Tracking Status: None "Boyle, Patrick" <Patrick.Boyle@nrc.gov>

Tracking Status: None

"'Ajluni, Mark J.'" <MJAJLUNI@southernco.com>

Tracking Status: None

"'Stringfellow, N. Jack'" <NJSTRING@southernco.com>

Tracking Status: None

"'Hill, Lesa P.'" <LPHILL@southernco.com>

Tracking Status: None

"'McKinney, B. Doug'" <BDMCKINN@southernco.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2208 1/24/2012 1:06:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: