Senior Reactor and Reactor Operator Initial License Examinations - Oyster Creek Nuclear Generating Station
ML120250519
Person / Time
Site: Oyster Creek
Issue date: 01/25/2012
From: Diane Jackson
Operations Branch I
To: Pacilio M
Exelon Generation Co
Shared Package
ML120230007 List:
References
U01848
Download: ML120250519 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KlNG OF PRUSSlA. PA 19406-1415 January 25, 2AL2 Mr. MichaelJ. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.

Warrenville. lL 60555

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR lNlTlAL LICENSE EXAMINATIONS - OYSTER CREEK NUCLEAR GENEMTING STATION

Dear Mr. Pacilio:

ln a telephone conversation on January 23,2012, between Mr. Jeff Ridosh, Lead Exam Author, and Mr. Joseph M. D'Antonio, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at Oyster Creek Nuclear Generating Station during the week of May 14,2012.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reattors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by February 29,2012. The written examinations, operating tests, and the supporting reference materials identified by Mr. D'Antonio will be due by March 30,2012. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

ln order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.9., system pressures, temperatures, and levels) generated during the dynamic operating tests untilthe examination results are final. Appendix E of NUREG-l021contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

M. Pacilio To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. lf the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOlfuPrivacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of lnformation and Regulatory Atfairs, NEOB-10202, (3150-0018),

Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http.//www. nrc. gov/read ing-rm/adams/web-based. htm l.

M. Pacilio 3 Thank you for your cooperation in this matter. Mr. Ridosh has been advised of the policies and guidelines referenced in this letter. lf you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D'Antonio at (610) 337-5085, or me at (610) 337-5306.

Wc Donald E.

Operations Branch Division of Reactor Safety Docket No.: 50-219 License No.: DPR-16 cc: Distribution via ListServ

M. Pacilio 3 Thank you for your cooperation in this matter. Mr. Ridosh has been advised of the policies and guidelines referenced in this letter. lf you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D'Antonio at (610) 337-5085, or me at (610) 337-5306.

Sincerely,

/RN Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.: 50-219 License No.: DPR-16 cc: Distribution via ListServ DISTRIBUTION lvta e-mait)

W. Dean, RA (RIORAMAIL Resource)

D. Lew, DRA (RIORAMAlL Resource)

J. Tappert, DRP (RI DRPMAlL Resource)

J. Clifford, DRP (RIDRPMAlL Resource)

C. Miller, DRS (RlDRSMail Resource)

P. Wilson, DRS (RlDRSMail Resource)

G. Hunegs, DRP S. Barber. DRP N. Lafferty, DRP A. Dugandzic, DRP L. Kern, DRP J. Kulp, DRP, SRI J. Ambrosini, DRP, Rl J. DeVries, DRP, OA L. Chang, Rl OEDO RidsNrrPMOysterCreek Resource Rids N rrDorlLpll -2 Resou rce ROPreports Resource D. Bearde, DRS D. Jackson, DRS J. D'Antonio, DRS DRS Master Exam File (C. Bixler) (w/concurrences) 9l!fl^ngyjqw 9omplete: JD (Reviewer,s Initiats)

ADAMS PKG: ML120230002 ADAMS Document No.: ML1202505i9

?P^!!L:Y lllYF: G,\?F^s\gfflions Branch\DANroNlo\Exam 12-oc May't2(uo1B48)\l2odayexamttr.docx After this document "An Official Record," it will be released to the public.

f,FFICE RI/DRS/OB RI/DRS/OB NAME JD'Antonio DEJackson DATE 1t24t2012 1t24t2012 OFFICIAL RECORD COPY