ML12023A208
| ML12023A208 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 08/22/2011 |
| From: | Berck A Omaha Public Power District |
| To: | John Kirkland NRC/RGN-IV/DRP |
| References | |
| FOIA/PA-2011-0339 | |
| Download: ML12023A208 (2) | |
Text
10 Lv, Earnestine Frc Set To:
m:
it:
BERCK, ALLEN [aberck@oppd.com]
Monday, August 22, 2011 7:34 AM bill@region5-6.org; dan@region5-6.org; eric.plautz@douglascounty-ne.gov; jeffrey.theulen@pottcounty.com; jon.schwarz@nebraska.gov; 'Larry Oliver'; 'Laurel Ryan';
paul.johnson@douglascounty-ne.gov; whitney.shipley@douglascounty-ne.gov; mrasmuss@idph.state.ia.us; kathy.stodola@iowa.gov; julia.schmitt@nebraska.gov; Presby, Peter; Wingebach, Jacob; Kirkland, John Cc.
GEBERS, STEVEN W; DEANGELIS, PETER A; DEVRIES, NATHAN P; SILKE, DEENA L; MOELLER, CHRISTOPHER J; HANKINS, RHONDA R; RELLER, MARK H; BERCK, ALLEN
Subject:
Fort Calhoun event status - Monday i
Very heavy rain and severe weather has affected the area over night. We are closely monitoring river conditions as well as equipment and evacuation routes. Please contact Emergency Planning if you hav'e any updated information.
Rý.e -
tad I'.
a n
aic.;,n
.in u..**,d
.tn-.'
Pl!ntIat ng.....
Fort Calhoun Flooding Status
- 1. Reactor Status: Shutdown
- 2. Reactor is covered with > 23-ft of cooling water
- 3. Offsite power and Emergency Diesel Generators are available. Both vital buses are energized at this time.
- 4. Spent Fuel Pooling cooling is in service and protected.
- 5. Shutdown cooling is in service and protected
- 6. Current river level is 1005' 0" at Fort Calhoun Station.
- 7. Current Blair gauge level is 30.0 ft.; According to the NWS/USACE, level is predicted to lower 1i tbo in the next 4 days.
- 8. The site has implemented procedures to protect power supplies and vital equipment. Water is onsite, and flood barriers are protecting vital equipment.
- 9. No release of radioactivity has occurred.
- 10. Fort Calhoun has declared a Notification of Unusual Event at 08:00 6/6/11.
- 11. Backup evacuation route onsite is inundated however the primary route onsite is passable and not expected to be affected.
- 12. 9 sirens remain with no AC power. Power has been removed from siren 259, 257 and 260 in Pottawattamie County IA. Power has been removed from sirens 143 and 135 in Harrison County, IA. Power has been removed from sirens 1, 69, 75, 76 in Washington County, NE. Power was removed from these sirens due to flooding in the surrounding areas. The coverage area for these sirens has been reviewed with state and county agencies. For those residents that do remain in these areas, the counties are responsible for route alerting.
- 13. The Reception and Care Center in Fremont is now official, replacing Bellevue; no evacuation routes to that location are affected at this time.
- 14. At this time no known major evacuation routes are affected without contingency actions planned. Interstate 29 in both directions: from Exit 54A (G Avenue) to Exit 71 (1-680 exit): 1-680 road closed to traffic because of flooding.
1-680 is closed in both directions: from before Exit 1 130th Street to Exit 62: 1-29; Old Mormon Bridge Road ---
road closed because of flooding.
lnt~flla inf thit reto~d*
-d e%16t4 inacordaanice with the Fie O1m 01 Int 9rtrl~tOR MOIA-1 6/5 Z,
A The,rier flow rate and level have been relatively constant at Blair NE. The Corp of Engineers is releasing GaV.in s Point dam at 137,000 cubic feet per second (cfs) and expected to be lowered to 130,000 cfs later today and continue to lower 5,000 cfs per day until release rates reaches 90,000 cfs per day.
Emergency Planning Contacts at FCS:
Steve Gebers:
C:LPag*er: (b)(6)
I":::
Work Phone: 402-533-7308&"
- f Ceil Phone:1)(6).
Allen Berck:
.Pagler:lI b)('6) 1 : :,£ : * *,
j.Cell phone: (b)(6)
Allen D. Berck Suplervisor - Emergency Planning Fort Calhoun Station Omraha Public Power District
- phone: 402-533-6064
- ),pager:.(b)(6)
" emil: abhr*ckro.ppd.CaOM This e-mai Oi ains aha Public Power Distric' ident and proprietary info ion dis for use only by t it ned recipien Unless explicitly s d otherwise, this -mail is not a co act offer, a ndment, nor acc
- e. If you are not e intended ipient you are notified t disclosing, pying, distributi or taking any a ion in reliance on the con ents of this information is strictly pro 2