LIC-109 Acceptance Review - Fermi 2 - LAR - TSTF 306 - ME7720
ML120190422
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/18/2012
From: Mahesh Chawla
Plant Licensing Branch III
To: Hassoun A
Detroit Edison
Chawla M, NRR/DORL, 415-8371
References
TAC ME7720
Download: ML120190422 (1)


Text

From: Chawla, Mahesh Sent: Wednesday, January 18, 2012 5:27 PM To: Alan I Hassoun Cc: Lee, Brian; Dennig, Robert; Lingam, Siva; Boyle, Patrick; Williams, Shawn; Bucholtz, Kristy

Subject:

LIC-109 Acceptance Review - Fermi 2 - LAR - TSTF 306 - ME7720 By letter dated December 20, 2011 (ADAMS Accession No. ML113550138), Detroit Edison submitted a license amendment request (LAR) for Fermi 2 Nuclear Power Plant (Fermi 2). The proposed amendment would revise modify TS requirements related to primary containment isolation instrumentation. The changes are in accordance with NRC approved TSTF, Improved TS change TSTF-306, Rev. 2.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me

@(301) 415-8371 or Mahesh.chawla@nrc.gov. Thanks Mahesh Chawla, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation