ML12011A209

From kanterella
Jump to navigation Jump to search
2011 Davis-Besse Nuclear Power Station Initial License Examination ES-301-2 Srou Original Submission and Revision
ML12011A209
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/27/2011
From:
Operations Branch III
To:
FirstEnergy Nuclear Operating Co
References
Download: ML12011A209 (2)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 NUREG-1021, Revision 9 Supplement 1 FENOC Facsimile Rev. 0 Facility: Davis-Besse Date of Examination: 12/5 thru 12/15 2011 Exam Level: RO SRO(I) SRO(U)

Operating Test No.: 2011 NRC Exam Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function S4. Perform a CNMT Pressure Reduction Release w/malfunctions JPM New (Sys 028)

Mode 3 N, S, A 8

S5. Perform PRZR boron eq. w/ PRZR spray valve malfunction JPM New (Sys 010)

Mode 2 N, S, A, L 3

S6. Establish long term boron dilution With LPI train 2 JPM 002 (Sys 006)

Post LOCA D, S, EN, E 2

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1. Place a HPI Train on alternate minimum recirc flowpath JPM 256 (Sys 006)

D, R, E, EN 2

P3. Reset the overspeed mechanism and trip throttle valve for AFPT JPM 075 (Sys 061)

D, E, EN 4S All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1

- / - / > 1 (Control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 NUREG-1021, Revision 9 Supplement 1 FENOC Facsimile Final Facility: Davis-Besse Date of Examination: 12/5 thru 12/15 2011 Exam Level: RO SRO(I) SRO(U)

Operating Test No.: 2011 NRC Exam Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function S4. Perform a CNMT Pressure Reduction Release w/malfunctions JPM New (Sys 028)

Mode 3 N, S, A 8

S5. Perform PRZR boron eq. w/ PRZR spray valve malfunction JPM New (Sys 010)

Mode 2 N, S, A, L 3

S9. Start HPI pump upon loss of one decay heat removal pump JPM 187 (Sys 005)

Mode 5 D, S A, L, EN 4P In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1. Place a HPI Train on alternate minimum recirc flowpath JPM 256 (Sys 006)

D, R, E, EN 2

P3. Reset the overspeed mechanism and trip throttle valve for AFPT JPM 075 (Sys 061)

D, E, EN 4S All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1

- / - / > 1 (Control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1