ML120040172
Jump to navigation
Jump to search
| ML120040172 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 12/22/2011 |
| From: | Division of Operating Reactor Licensing |
| To: | Pacific Gas & Electric Co |
| Lynch, S T, NRR/DORL/LPL4, 301-415-1524 | |
| Shared Package | |
| ML120040146 | List: |
| References | |
| TAC ME7615 | |
| Download: ML120040172 (1) | |
Text
RAIs on Capsule Withdrawal Schedule Approval Request (ME7615)
RAI - 01 Issue: The ASTM E 185-70 standard practice describes the withdrawal schedule in terms of the target fluence. The requested revision is written in terms of effective full power years (EFPY) instead of target fluence.
Request: Describe the withdrawal schedule (mark-up of FSARU Table 5.2-22) in terms of the fast neutron fluence (E> 1MeV).
RAI - 02 Provide a list of all materials included in Capsule B that the licensee plans to withdraw during the 23rd refueling outage for Unit 1 along with the participating integrated surveillance program plant that will use the test results.