NL-11-134, Units, 2 & 3 - Amendment 11 to License Renewal Application (LRA)

From kanterella
(Redirected from ML11363A175)
Jump to navigation Jump to search
Units, 2 & 3 - Amendment 11 to License Renewal Application (LRA)
ML11363A175
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/20/2011
From: Dacimo F
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-11-134
Download: ML11363A175 (8)


Text

SEnterg Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, N.Y. 10511-0249 Tel (914) 788-2055 Fred Dacimo Vice President License Renewal NL-1 1-134 December 20, 2011 Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-Pl-17 Washington, D.C. 20555-0001

Subject:

Amendment 11 to License Renewal Application (LRA)

Indian Point Nuclear Generating Unit Nos. 2 & 3 Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64

References:

1) Entergy Letter dated April 23, 2007, F. R. Dacimo to Document Control Desk, "License Renewal Application" (NL-07-039)
2) Entergy Letter dated April 23, 2007, F. R. Dacimo to Document Control Desk, "License Renewal Application Boundary Drawings" (NL-07-040)
3) Entergy Letter dated April 23, 2007, F. R. Dacimo to Document Control Desk, "License Renewal Application Environmental Report References" (NL-07-041)
4) Entergy Letter dated October 11, 2007, F. R. Dacimo to Document Control Desk, "License Renewal Application (LRA)"

(NL-07-124)

5) Entergy Letter dated November 14, 2007, F. R. Dacimo to Document Control Desk, "Supplement to License Renewal Application (LRA) Environmental Report References" (NL-07-133)

Dear Sir or Madam:

In the referenced letters, Entergy Nuclear Operations, Inc. applied for renewal of the Indian Point Energy Center operating license. This letter contains Amendment 11 of the License Renewal Application (LRA).

If you have any questions, or require additional information, please contact Mr. Robert Walpole at 914-254-6710.

4(28

NL-1 1-134 Docket Nos. 50-247 and 50-286 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on

-4Z 1 . 0Zo,0 Sincerely, PAZ jZ' FRD/aas

Attachment:

1. Annual Update Amendment cc: Mr. William Dean, Regional Administrator, NRC Region 1 Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Mr. Kenneth Chang, NRC Branch Chief, Engineering Review Branch I Mr. John P. Boska, Senior Project Manager, NRC NRR DORL Mr. Paul Eddy, New York State Dept. of Public Service Mr. Francis J. Murray, Jr., President & CEO, NYSERDA NRC Resident Inspector's Office

ATTACHMENT 1 TO NL-11-134 Annual Update Amendment ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION ANNUAL UPDATE AMENDMENT In accordance with 10 CFR 54.21(b), each year following submittal of the license renewal application and at least 3 months before scheduled completion of the NRC review, an amendment to the renewal application must be submitted that identifies any change to the CLB of the facility that materially affects the contents of the license renewal application (LRA), including the FSAR supplement. This attachment is that required amendment for the Indian Point Energy Center (IPEC).

The review included documents affecting the CLB during the period of May 1, 2010 through August 31, 2011. The last annual update of the LRA included a review of documents thru April 30, 2010.

This review concluded that certain sections of the LRA are affected by changes to the CLB over the period of review. The table below summarizes the changes listing the affected system (if applicable), an explanation of the change (including effect on the LRA), and the affected LRA section.

IPEC LRA Sections Affected LRA Section CLB Change Affected Engineering change EC-4061 and drawing B/9321-2723, Rev. 75 replaced nitrogen regulators PCV-942 and PCV-7726 with smaller Table 2.3.3-5-1P2 flow capacity regulators Table 3.3.2-5-IP2 Change deleted component type

'flow element' from IP2 Nitrogen system Engineering Change EC-35974 Fl-612, 615, 618, 621 RCP Lower Bearing flow indicator added flow element Table 2.3.3-3-IP3 Change added new component Table 3.3.2-3-1P3 type 'flow element' to IP3 Component Cooling Water system

IPEC LRA changes are shown below.

(Changes are shown as strikethroughs for del-tienRs and underlines for additions)

Table 2.3.3-5-1P2 Nitrogen System Components Subject to Aging Management Review Component Type Intended Function Bolting Pressure boundary Flex hose Pressure boundary Piping Pressure boundary Regulator Pressure boundary Strainer Pressure boundary

Table 3.3.2-5-1P2 Nitrogen System Summary of Aging Management Review

Table 2.3.3-3-1P3 Component Cooling Water System Components Subject to Aging Management Review Component Type Intended Function Bolting Pressure boundary Flex hose Pressure boundary Heat exchanger (bonnet) Pressure boundary Heat exchanger (shell) Pressure boundary Heat Transfer Heat exchanger (tubes) Pressure boundary Flow element Pressure boundary Orifice Pressure boundary Piping Pressure boundary Pump casing Pressure boundary

Table 3.3.2-3-1P3 Component Cooling Water Summary of Aging Management Review Component Intended Aging Effect Aging NUREG-1801 Type Functieneon Material Environment Requiring Management Vol. 2 Table 1 Notes Type Function Management Programs Item Item Pressure Carbon Air - indoor (ext) Loss of material Bolting integrity VII.1-4 3.3.1-43 A Bolting boundary steel (AP-27)

Pressure Carbon Boric acid corrosion VII.1-2 3.3.1-89 A Bolting boundary steel Air - indoor (ext) Loss of material prevention (A-102)

Pressure Stainless Air - indoor (ex) None None VII.J-15 3.3.1-94 C Bolting boundary steel (AP-17)

Flex hose Pressure Stainless VIIJ-15 3.3.1-94 A boundary steel Air - indoor (ext) None None (AP-17)

Water chemistry VII.C2-10 3.3.1-50 B Flex hose boundary steel (int) Loss of material control cooling- closed water (A-52)

Pressure Stainless Air- indoor (ext) None None VII.J-15 3.3.1-94 A Flow element boundary steel (AP-17)

Water chemistry VII.C2-10 3.3.1-50 B Flow element Peure staes Trete Loss of material control - closed (A-521 boundary steel cooling water