Initial Information Request for NRC Triennial Baseline Component Design Bases Inspection (NRC Inspection Reports 05000313/2012007 and 05000368/2012007)
ML11356A344
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/22/2011
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Schwarz C
Entergy Operations
George G
References
IR-12-007
Download: ML11356A344 (8)


See also: IR 05000313/2012007

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

RE G IO N I V

1600 EAST LAMAR BLVD

AR L INGTON , TEXAS 7 60 11 - 4511

December 22, 2011

Christopher J. Schwarz, Site Vice President

Arkansas Nuclear One

Entergy Operations, Inc.

1448 SR 333

Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE - INITIAL INFORMATION REQUEST FOR

NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES

INSPECTION (NRC INSPECTION REPORTS 05000313/2012007 AND

05000368/2012007)

Dear Mr. Schwarz:

On February 13, 2012, the NRC will begin a triennial baseline Component Design Bases

Inspection at Arkansas Nuclear One facility, Units 1 and 2. A seven person team will

perform this inspection using NRC Inspection Procedure 71111.21, "Component Design

Bases Inspection."

The inspection focuses on systems and components that have high risk and low design

margins. The samples reviewed during this inspection will be identified during an

information gathering visit and during the subsequent in-office preparation week.

Additionally, a number of operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a

senior reactor analyst, and three weeks of onsite inspection by the team. The inspection

will consist of five NRC inspectors and two contractors, of which five will focus on

engineering and one on operations. The current inspection schedule is as follows:

Onsite information gathering visit: Week of January 30, 2012

Preparation Week: February 6, 2012

Onsite weeks: February 13, 2012; February 27, 2012; March 12, 2012

The purpose of the information gathering visit is to meet with members of your staff to

identify potential risk-significant components and operator actions. The lead inspector

will also request a tour of the plant with members of your operations staff and

probabilistic safety assessment staff. During the onsite weeks, several days of time will

be needed on the plant-referenced simulator in order to facilitate the development of

operator action-based scenarios. Additional information and documentation needed to

support the inspection will be identified during the inspection, including interviews with

engineering managers, engineers, and probabilistic safety assessment staff.

Our experience with these inspections has shown that they are extremely resource

intensive, both for the NRC inspectors and the licensee staff. In order to minimize the

Entergy Operations, Inc. -2-

inspection impact on the site and to ensure a productive inspection, we have enclosed a

request for information needed for the inspection. The request has been divided into

three groups. The first group lists information necessary for the information gathering

visit and for general preparation. This information should be available to the regional

office no later than January 16, 2012. Insofar as possible, this information should be

provided electronically to the lead inspector. Since the inspection will be concentrated

on high risk/low margin components, calculations associated with your list of high risk

components should be available to review during the information gathering visit to assist

in our selection of components based on available design margin.

The second group of documents requested is those items that the team will need access

to during the preparation week in order to finalize the samples to be inspected. The third

group lists information necessary to aid the inspection team in tracking issues identified

as a result of the inspection. It is requested that this information be provided to the lead

inspector as the information is generated during the inspection. Additional requests by

inspectors will be made throughout all three onsite weeks for specific documents needed

to complete the review of that component/selection. It is important that all of these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

In order to facilitate the inspection, we request that a contact individual be assigned to

each inspector to ensure information requests, questions, and concerns are addressed

in a timely manner.

The lead inspector for this inspection is Gerond A. George. If there are any questions

about the inspection or the requested materials, please contact the lead inspector at

(817) 200-1562 or via e-mail at Gerond.George@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required

to respond to, a request for information or an information collection requirement unless

the requesting document displays a currently valid Office of Management and Budget

control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter

will be made available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Gerond George /RA/ for

Thomas Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-313, 50-368

License: DPR-51, NPF-6

Entergy Operations, Inc. -3-

Enclosure:

Component Design Basis Inspection Document Request

cc w/enclosure:

Distribution List Serv for Arkansas Nuclear One

Entergy Operations, Inc. -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Tom.Blount@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Jeff.Rotton@nrc.gov)

Resident Inspector (William.Schaup@nrc.gov)

Branch Chief, DRP/E (James.Drake@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Project Engineer, DRP/E (Jim.Melfi@nrc.gov)

Project Engineer, DRP/E (Chris.Smith@nrc.gov)

Project Engineer (Daniel.Bradley@nrc.gov)

ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Kaly.Kalyanam@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

W. Cartwright, NRR CDBI Coordinator (William.Cartwright@nrc.gov)

R:\REPORTS\ANO\ANO2012007-RFI-GAG.docx ADAMS ML11356A344

ADAMS: No 5 Yes 5 SUNSI Review Complete Reviewer Initials: GAG

5 Publicly Available 5 Non-Sensitive

. Non-publicly Available Sensitive

SRI:DRS:EB1 C:DRS:EB1

GAGeorge TFarnholtz

/RA/ /RA/G.George for

12/22/2011 12/22/2011

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INFORMATION REQUEST FOR ARKANSAS NUCLEAR ONE COMPONENT DESIGN

BASES (CDBI) INSPECTION

Inspection Report: 05000313/2012007

05000368/2012007

Information Gathering Dates: January 23, 2012

On-site Inspection Dates: February 13, 2012; February 27, 2012;

March 12, 2012

Inspection Procedure: IP 71111.21, "Component Design Bases

Inspection"

Lead Inspector/Team Leader: Gerond A George

817-200-1562

Gerond.George@nrc.gov

I. Information Requested Prior to the information Gathering Visit (January 16,

2012)

The following information (Section I of this enclosure) should be sent to the

Region IV office in hard copy or electronic format (compact disc, preferred), in

care of Gerond A. George, by January 16, 2012 to facilitate the reduction in the

items to be selected for a final list during the preparation week February 6, 2012.

The inspection team will finalize the selected list during the prep week using the

additional documents requested in Section II of this enclosure. The specific items

selected from the lists shall be available and ready for review on the day

indicated in this request. *Please provide requested documentation electronically

in "pdf" files, Excel, or other searchable formats, if possible. The information

should contain descriptive names, and be indexed and hyperlinked to facilitate

ease of use. Information in "lists" should contain enough information to be easily

understood by someone who has knowledge of pressurized water reactor

technology. If requested documents are large and only hard copy formats are

available, please inform the inspector(s), and provide subject documentation

during the first day of the onsite inspection.

1. An excel spreadsheet of equipment basic events (with definitions)

including importance measures sorted by risk achievement worth (RAW)

and Fussell-Vesely (FV) from your internal events probabilistic risk

assessment (PRA). Include basic events with RAW value of 1.3 or

greater.

2. Provide a list of the top 500 cut-sets from your PRA.

3. Copies of PRA "system notebooks," and the latest PRA summary

document.

4. An excel spreadsheet of PRA human action basic events or risk ranking

of operator actions from your site specific PSA sorted by RAW and FV.

Provide copies of your human reliability worksheets for these items.

-1- Enclosure

5. If you have an external events or fire PSA model, provide the information

requested in items 1-4 for external events and fire.

6. Any pre-existing evaluation or list of components and associated

calculations with low design margins, (i.e., pumps closest to the design

limit for flow or pressure, diesel generator close to design required output,

heat exchangers close to rated design heat removal, etc.).

7. List of high risk maintenance rule systems/components and functions;

based on engineering or expert panel judgment.

8. A list of operating experience evaluations for the last 2 years.

9. A list of all time-critical operator actions in procedures.

10. A list of permanent and temporary modifications sorted by component

identified in Item 1.

11. List of current "operator work arounds/burdens."

12. A list of the design calculations, which provide the design margin

information for components included in Item 1. (Calculations should be

available during the information gathering visit).

13. List of root cause evaluations associated with component failures or

design issues initiated/completed in the last 5 years.

14. Current management and engineering organizational charts.

15. ANO Units 1 and 2 IPEEE, if available electronically.

16. Mechanical piping drawings for:

Engineered safety features

Emergency core cooling systems

Emergency diesel generators

17. Electrical one-line drawings for:

Offsite power/switchyard supplies

Normal AC power systems

Emergency AC/DC power systems including

120VAC power, and

125VDC/24VDC safety class systems

18. List of any common-cause failures of components in the last 3 years.

19. An electronic copy of the Design Bases Documents.

20. An electronic copy of the System Health notebooks.

-2- Enclosure

21. System Description Manuals with simplified drawings of plant systems

II. Information Requested to be Available on First Day of Preparation Week

(February 6, 2012)

1. List of condition reports (corrective action documents) associated with

each of the selected components for the last 5 years.

2. The corrective maintenance history associated with each of the selected

components for the last 2 years.

3. Copies of calculations associated with each of the selected components

(if not previously provided), excluding data files. Please review the

calculations and also provide copies of reference material (such as

drawings, engineering requests, and vendor letters).

4. Copies of operability evaluations associated with each of the selected

components and plans for restoring operability, if applicable.

5. Copies of selected operator work-around evaluations associated with

each of the selected components and plans for resolution, if applicable.

6. Copies of any open temporary modifications associated with each of the

selected components, if applicable.

7. Trend data on the selected electrical/mechanical components

performance for last 3 years (for example, pumps performance including

in-service testing, other vibration monitoring, oil sample results, etc., as

applicable).

8. A copy of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

9. A copy of engineering/operations related audits completed in the last 2

years.

10. List of motor operated valves (MOVs) in the program, design margin and

risk ranking.

11. List of air operated valves (AOVs) in the valve program, design and risk

ranking.

12. Structure, system and components in the Maintenance Rule (a)(1)

category.

13. Site top 10 issues list.

14. Procedures used to accomplish operator actions associated with the

basic events in your PRA.

-3- Enclosure

15. List of licensee contacts for the inspection team with pager or phone

numbers.

III. Information Requested to be provided throughout the inspection.

1. Copies of any corrective action documents generated as a result of the

teams questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the

inspection to each team member).

3. Reference materials (available electronically and as needed during all

onsite weeks):

General set of plant drawings

IPE/PRA report

Procurement documents for components selected

Plant procedures (normal, abnormal, emergency, surveillance, etc.)

Technical Specifications

Updated Final Safety Analysis Report

Vendor manuals

Inspector Contact Information:

Gerond A. George

Senior Reactor Inspector

(817) 200-1562

Gerond.George@nrc.gov

Mailing Address:

US NRC, Region IV

Attn: Gerond George

1600 East Lamar Blvd

Arlington, TX 76011

-4- Enclosure