Notification of NRC Initial Operator Licensing Examination 05000445/2012301; 05000446/2012301
ML11349A125
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/15/2011
From: Mark Haire
Operations Branch IV
To: Flores R
Luminant Generation Co
Haire M
References
50-445/12-301, 50-446/12-301
Download: ML11349A125 (3)


See also: IR 05000445/2012301

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

December 15, 2011

Rafael Flores, Senior Vice President

and Chief Nuclear Officer

Attention: Regulatory Affairs

Luminant Generation Company LLC

Comanche Peak Nuclear Power Plant

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION

OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000445/2012301;

05000446/2012301

Dear Mr. Flores:

In a telephone conversation on December 12, 2011, between Messrs. Gary Struble, Simulator

and Licensing Exam Manager, and Sean Hedger, Chief Examiner, arrangements were made for

the administration of licensing examinations at Comanche Peak Nuclear Power Plant, Units 1 and

2, during the weeks of June 11 and 18, 2012.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power Reactors,

Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear

Power Plant Operators, Revision 2, Supplement 1. The NRCs Regional Office will discuss with

your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines

by March 26, 2012. The written examinations, operating tests, and supporting reference

materials identified in Attachment 3 to ES-201 will be due by April 23, 2012. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outlines, examinations, and tests before

they are submitted to the NRC for review and approval. All materials shall be complete and ready

to use. We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examinations and reference materials, or the submittal of

inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition,

your support for on-site validation of the examinations is required during the week of May 14,

2012.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and to

make the simulation facility available on the dates noted above. In accordance with ES-302, your

staff should retain the original simulator performance data (e.g., system pressures, temperatures,

and levels) generated during the dynamic operating tests until the examination results are final.

Mr. Flores -2-

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination

date. If the applications are not received at least 30 days before the examination date, a

postponement may be necessary. Signed applications certifying that all training has been

completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Hedger at 817-200-1556 or myself at 817-200-

1159.

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-445; 50-446

Licenses: NPF-87; NPF-89

cc via Electronic Distribution

Mr. Flores -3-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Tom.Blount@nrc.gov)

Senior Resident Inspector (John.Kramer@nrc.gov)

Resident Inspector (Brian.Tindell@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)

Project Engineer, DRP/A (Christopher.Henderson@nrc.gov)

CP Administrative Assistant (Sue.Sanner@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

RIV/ETA: OEDO (Mark.Franke@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

R:\REACTORS\CP\CP-2012-06 CNL-sdh.doc ADAMS ML11349A125

ADAMS: No %6 Yes 6 SUNSI Review Complete Reviewer Initials: SDH

6 Publicly Available 6 Non-Sensitive

Non-publicly Available Sensitive

OE: OB C: OB

GApger for SHedger SGarchow for MHaire

/RA/ /RA/

12/15/2011 12/15/2011

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax