WBN2Public Resource From: Clark, Mark Steven [msclark0@tva.gov]

Sent: Monday, November 14, 2011 11:20 AM To: Carte, Norbert; Poole, Justin Cc: Bryan, Robert H Jr; Kepler, Jeffrey T; McNeil, Douglas Ray

Subject:

RE: Discussion with the NRC Norbert:

TVA Licensing says they have not seen anything.

Justin:

Can you provide the draft of Norberts questions? We were supposed to include the response in the 11/14 letter, but it didnt get done and I want to be sure it is in the 11/30 letter and I want to be sure it is right this time.

Regards, Steve Steve Clark Bechtel Power Corp.

Control Systems Watts Bar 2 Completion Project Phone: 423.365.3007 e-mail: msclark0@tva.gov From: Carte, Norbert [1]

Sent: Monday, November 14, 2011 10:16 AM To: Clark, Mark Steven Cc: Poole, Justin

Subject:

RE: Discussion with the NRC By Internal Memo dated October 11, 2011 (ML11270A306), I sent Justin some RAI Questions on 603. I do not know if Justin sent them out yet. After you get them in draft form, maybe we should talk about them to make sure they are clear.

Norbert Carte (301) 415-5890 COMPLEXITY in regulations and guidance may be necessary to afford flexibility in design and construction but often comes from layering of new information upon old without regard to overall continuity.

From: Clark, Mark Steven [2]

Sent: Monday, November 14, 2011 9:35 AM To: Carte, Norbert Cc: Hilmes, Steven A; Knuettel, Edward Terry; Poole, Justin; Kepler, Jeffrey T; Bryan, Robert H Jr

Subject:

RE: Discussion with the NRC Norbert:

I am behind with revising the IEEE 603 compliance white paper. In the most recent discussion you asked about why the focus of the paper was on Clause 4. At the time, I did not remember, but this morning I found 1

the following e-mail. I do not have a response. Did you or Justin send something to TVA Licensing that I did not receive? Im just looking for clarification as I start the revision.

Thanks, Steve Steve Clark Bechtel Power Corp.

Control Systems Watts Bar 2 Completion Project Phone: 423.365.3007 e-mail: msclark0@tva.gov From: Clark, Mark Steven Sent: Tuesday, June 14, 2011 3:57 PM To: Crouch, William D; Bryan, Robert H Jr; Smith, James D; Hilmes, Steven A; Knuettel, Edward Terry Cc: 'Carte, Norbert'; Kepler, Jeffrey T; Raley, Thomas R

Subject:

Discussion with the NRC All:

Norbert Carte and I had an informal discussion this afternoon concerning the PAMS design bases question (Matrix Item 213). I requested clarification of the question after reviewing the various Reg Guides and Industry Standards. The proposed results the discussion are summarized below:

1. As previously agreed we will commit the Common Q PAMS to meet IEEE 603-1991.
2. We will not commit the Common Q PAMS to meet Reg Guide 1.153 (endorses 603-1991).
3. We will revise section 7.5 UFSAR discussion of variable types to reflect the fact that some type A variables are required to meet our Reg Guide 1.97 commitment and other type A variables are required to meet TVA operations requirements.
4. We will revise Table 7.5-2 to clearly identify which type A variables are required to meet our Reg Guide 1.97 commitment and which are not.
5. We will prepare a design basis response for the Common Q PAMS using the requirements of IEEE 603-1991 Clause 4.

Note: Items 3 and 4 or some other solution must be agreed on to resolve the disconnect between the FSAR Type A variable definition and the Type A variables identified in Table 7.5-2.

With the exception of item 5 we will review the above items at this Thursdays telecom meeting. Prior to the meeting, please review the items to determine if they are acceptable to TVA. Norbert agreed to do the same with his peers and management at the NRC.

Regards, Steve Steve Clark Bechtel Power Corp.

Control Systems Watts Bar 2 Completion Project Phone: 423.365.3007 e-mail: msclark0@tva.gov 2

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 607 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF2540E51D)

Subject:

RE: Discussion with the NRC Sent Date: 11/14/2011 11:19:30 AM Received Date: 11/14/2011 11:19:40 AM From: Clark, Mark Steven Created By: msclark0@tva.gov Recipients:

"Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Kepler, Jeffrey T" <jtkepler@tva.gov>

Tracking Status: None "McNeil, Douglas Ray" <drmcneil@tva.gov>

Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 4067 11/14/2011 11:19:40 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: