ML113400138
Jump to navigation
Jump to search
| ML113400138 | |
| Person / Time | |
|---|---|
| Issue date: | 11/04/2011 |
| From: | Michael Salay NRC/RES/DSA |
| To: | |
| salay michael | |
| References | |
| SAND2008-6601 | |
| Download: ML113400138 (1) | |
Text
Errata for SAND2008-6601: Analysis of Main Steam Isolation Valve leakage in Design Basis Accidents Using MELCOR 1.8.6 and RADTRAD
- 1. Chapter 1, second paragraph. As seen in Figure 1-1 actually refers to the un-numbered figure on the previous page.
- 2. Equation 1.2. The definition of R* should be changed to the ratio of MELCOR containment (drywell) airborne concentrations to the NUREG-1465 containment airborne concentrations
- 3. The first digit of references to equations in chapter 5 of the text should be 5 instead of 6.
For example, the paragraph preceding equation 5.3 lists references to equations 6.1 through 6.5. The actual equations being referenced are 5.1 through 5.5.
- 4. Equation 5.4 should indicate mass flow rate = flow rate (in standard cubic feet per hour) x density (at standard conditions). e.g.
= ()
- 5. Page 23, first paragraph. This is described in more detail in Section 6 should be This is described in more detail in Section 5