Operating Corporation - Notification of NRC Initial Operator Licensing Examination 05000482-12-301
ML113270380
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/23/2011
From: Mark Haire
Operations Branch IV
To: Matthew Sunseri
Wolf Creek
References
50-482/12-301
Download: ML113270380 (5)


See also: IR 05000482/2012301

Text

UNITED STATES

NUC LE AR RE G ULATO RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

November 23, 2011

Matthew W. Sunseri, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - NOTIFICATION OF

NRC INITIAL OPERATOR LICENSING EXAMINATION 05000482/2012301

Dear Mr. Sunseri:

In a telephone conversation on October 26, 2011 between Messrs. Brendan Ryan, Acting

Operations Training NRC Examination Supervisor, and Brian Larson, Chief Examiner,

arrangements were made for the administration of a retake licensing examination at Wolf Creek

Nuclear Operating Corporation during the week of January 16, 2012.

As agreed during the telephone conversation, your staff will prepare the examination based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examination is

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by November 4, 2011. The walkthrough portion of the operating test and supporting

reference materials identified in Attachment 3 to ES-201 will be due by November 23, 2011.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations, an authorized

representative of the facility licensee shall approve the outlines and test before they are

submitted to the NRC for review and approval. All materials shall be complete and ready-to-

use. We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examination and reference materials, or the submittal of

inadequate or incomplete materials, may cause the examination to be rescheduled. In addition,

your support for on-site validation of the examination is required during the week of January 16,

2012.

In order to conduct the requested operating test, it will be necessary for your staff to provide

adequate space and accommodations in accordance with ES-402 and to make the simulation

facility available on the dates noted above.

M. Sunseri -2-

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the operating test is being administered.

To permit timely NRC review and evaluation, your staff should submit the preliminary senior

operator license application (Office of Management and Budget (OMB) approval number 3150-

0090), medical certifications (OMB approval number 3150-0024), and waiver request (if any)

(OMB approval number 3150-0090) at least 30 days before the examination date. If the

application is not received at least 30 days before the examination date, a postponement may

be necessary. The signed application certifying that all training has been completed should be

submitted at least 14 days before the examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Ryan has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Larson at 817-276-8172, or myself at 817-860-

8159.

Sincerely,

/RA/

Mark Haire, Chief

Operations Branch

Division of Reactor Safety

M. Sunseri -3-

Docket: 50-482

Licenses: NPF-42

cc: via Electronic Distribution - Wolf Creek

M. Sunseri -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Tom.Blount@nrc.gov)

Senior Resident Inspector (Chris.Long@nrc.gov)

Resident Inspector (Charles.Peabody@nrc.gov)

WC Administrative Assistant (Shirley.Allen@nrc.gov)

Branch Chief, DRS/OB (Mark.Haire@nrc.gov)

Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Project Engineer, DRP/B (Nestor.Makris@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

RIV/ETA: OEDO (Mark.Franke@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials BTL

Publicly Avail Yes No Sensitive Yes No Sens. Type Initials BTL

SOE:OB C:OB

BTLarson MHaire

/RA/ /RA/

11/18/11 11/22/11

M. Sunseri -5-

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax