ML11312A246

From kanterella
Jump to navigation Jump to search
Technical Specification Bases (Tsb) Changes
ML11312A246
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/03/2011
From: Gillespie T
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11312A246 (25)


Text

V' Duke T.PRESTON GILLESPIE, JR.

Vice President rE* nergy Oconee Nuclear Station Duke Energy ONO IVP / 7800 Rochester Hwy.

Seneca, SC 29672 864-873-4478 864-873-4208 fax T.Gillespie@duke-energy.corn November 3, 2011 U. S. Nuclear Regulatory Commission Washington, D C 20555 Attention: Document Control Desk

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Numbers 50-269, 50-270, and 50-287 Technical Specification Bases (TSB) Changes Pursuant to Technical Specification 5.5.15, Technical Specifications (TS) Bases Control Program, please find attached the latest changes to the Oconee Technical Specification Bases.

On October 17, 2011, Station Management approved a revision to TSB 3.0 - SR Applicability, 3.6.1 - Containment, and 3.6.2 - Containment Air Locks.

Attachment 1 contains the new TSB pages, Attachment 2 contains the marked up version of the TSB pages.

If any additional information is needed, please contact Kent Alter at 864-873-3255.

Sincerely, T. Preston Gillespie, Jr.

Vice President Oconee Nuclear Station www. duke-energy.com

U. S. Nuclear Regulatory Commission November 3, 2011 Page 2 cc: John Stang Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8 G9A Washington, DC 20555 Victor McCree Regional Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Ga. 30303-1257 Andy Sabisch Senior Resident Inspector Oconee Nuclear Station Susan E. Jenkins, Manager Radioactive & Infectious Waste Management SC Dept. of Health and Environmental Control 2600 Bull St.

Columbia, SC 29201 TSB revision

SR Applicability B 3.0 BASES SR 3.0.2 The 25% extension does not significantly degrade the reliability that results (continued) from performing the Surveillance at its specified Frequency. This is based on the recognition that the most probable result of any particular Surveillance being performed is the verification of conformance with the SRs. The exceptions to SR 3.0.2 are those Surveillances for which the 25% extension of the interval specified in the Frequency does not apply.

These exceptions are stated in the individual Specifications. The requirements of regulations take precedence over the TS. An example of where SR 3.0.2 does not apply is in the Containment Leakage Rate Testing Program. This program establishes testing requirements and Frequencies in accordance with the requirements of regulations. The TS cannot in and of themselves extend a test interval specified in the regulations.

As stated in SR 3.0.2, the 25% extension also does not apply to the initial portion of a periodic Completion Time that requires performance on a "once per..."basis. The 25% extension applies to each performance after the initial performance. The initial performance of the Required Action, whether it is a particular Surveillance or some other remedial action, is considered a single action with a single Completion Time. One reason for not allowing the 25% extension to this Completion Time is that such an action usually verifies that no loss of function has occurred by checking the status of redundant or diverse components or accomplishes the function of the inoperable equipment in an alternative manner.

The provisions of SR 3.0.2 are not intended to be used repeatedly merely as an operational convenience to extend Surveillance intervals (other than those consistent with refueling intervals) or periodic Completion Time intervals beyond those specified. ,

SR 3.0.3 SR 3.0.3 establishes the flexibility to defer declaring affected equipment inoperable or an affected variable outside the specified limits when a Surveillance has not been completed within the specified Frequency. A delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater, applies from the point in time that it is discovered that the Surveillance has not been performed in accordance with SR 3.0.2, and not at the time that the specified Frequency was not met.

This delay period provides an adequate time to complete Surveillances that have been missed. This delay period permits the completion of a Surveillance before complying with Required Actions or other remedial measures that might preclude completion of the Surveillance.

OCONEE UNITS 1, 2, & 3 B 3.0-13 BASES REVISION DATED 10/20/11 I

Containment B 3.6.1 B 3.6 CONTAINMENT SYSTEMS B 3.6.1 Containment BASES BACKGROUND The containment consists of the reactor building (RB) structure, its steel liner, and the penetrations of this liner and structure. The containment is designed to contain radioactive material that may be released from the reactor core following a design basis loss of coolant accident (LOCA).

Additionally, the containment provides shielding from the fission products that may be present in the containment atmosphere following accident conditions.

The containment is a reinforced concrete structure with a cylindrical wall, a flat foundation mat, and a shallow dome roof. The containment design includes ungrouted tendons where the cylinder wall is prestressed with a post tensioning system in the vertical and horizontal directions, and the dome roof is prestressed using a three way post tensioning system. The inside surface of the containment is lined with a carbon steel liner to ensure a high degree of leak tightness during operating and accident conditions.

The reinforced concrete structure is required for structural integrity of the containment under Design Basis Accident (DBA) conditions. The steel liner and its penetrations establish the leakage limiting boundary of the containment. Maintaining the containment OPERABLE limits the leakage of fission product radioactivity from the containment to the environment.

SR 3.6.1.1 leakage rate requirements comply with 10 CFR 50, Appendix J, Option B (Ref. 1), as modified by approved exemptions.

The isolation devices for the penetrations in the containment boundary are a part of the containment leak tight barrier. To maintain this leak tight barrier:

a. All penetrations required to be closed during accident conditions are either:
1. capable of being closed by an OPERABLE automatic containment isolation system, or
2. closed by manual valves, blind flanges, or de-activated automatic valves in their closed positions, except as provided in LCO 3.6.3, "Containment Isolation Valves";

OCONEE UNITS 1, 2, & 3 B 3.6. 1-1 BASES REVISION DATED 10/20/11 I

Containment B 3.6.1 BASES BACKGROUND b. Each air lock is OPERABLE, except as provided in LCO 3.6.2, (continued) "Containment Air Locks"; and

c. The equipment hatch is closed.

APPLICABLE The safety design basis for the containment is that the containment must SAFETY ANALYSES withstand the pressures and temperatures of the limiting accident without exceeding the design leakage rate.

The accidents that result in a challenge to containment from high pressures and temperatures are a LOCA and a steam line break (Ref. 2). In addition, release of significant fission product radioactivity within containment can occur from a LOCA. In the accident analyses, it is assumed that the containment is OPERABLE such that, for the accidents involving release of fission product radioactivity, release to the environment is controlled by the rate of containment leakage. The containment was designed with an allowable leakage rate of 0.20% of containment air weight per day (Ref. 3).

This leakage rate, used in the evaluation of offsite doses resulting from accidents, is defined in 10 CFR 50, Appendix J, Option B (Ref. 1), as La:

the maximum allowable leakage rate at the calculated maximum peak containment pressure (Pa) resulting from the limiting design basis LOCA.

The allowable leakage rate represented by La forms the basis for the acceptance criteria imposed on all containment leakage rate testing. La is assumed to be 0.20% per day in the safety analysis at Pa = 59.0 psig (Ref. 3).

The containment satisfies Criterion 3 of the 10 CFR 50.36 (Ref. 4).

LCO Containment OPERABILITY is maintained by limiting leakage to _<1.0 La, except prior to the first startup after performing a required Containment Leakage Rate Testing Program leakage test. At this time, the applicable leakage limits must be met. Compliance with this LCO will ensure a containment configuration, including equipment hatches, that is structurally sound and that will limit leakage to those leakage rates assumed in the safety analysis.

APPLICABILITY In MODES 1, 2, 3, and 4, an accident could cause a release of radioactive material into containment. In MODES 5 and 6, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, containment is not required to be OPERABLE in MODE 5 to prevent leakage of radioactive material from containment. The requirements for containment during MODE 6 are addressed in LCO 3.9.3, "Containment Penetrations."

OCONEE UNITS 1, 2, & 3 B 3.6.1-2 BASES REVISION DATED 10/20/11 I

Containment B 3.6.1 BASES (continued)

ACTIONS A. 1 In the event containment is inoperable, containment must be restored to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time provides a period of time to correct the problem commensurate with the importance of maintaining containment during MODES 1, 2, 3, and 4. This time period also ensures the probability of an accident (requiring containment OPERABILITY) occurring during periods when containment is inoperable is minimal.

B.1 and B.2 Ifthe Required Action and associated Completion Time is not met, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

SURVEILLANCE SR 3.6.1.1 REQUIREMENTS Maintaining the containment OPERABLE requires compliance with the visual examinations and leakage rate test requirements of the Containment Leakage Rate Testing Program. As left leakage prior to the first startup after performing a required Containment Leakage Rate Testing Program leakage test is required to be < 0.6 La for combined Type B and C leakage, and < 0.75 La for Option B for overall Type A leakage following an outage or shutdown that included Type A testing. At all other times between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of < 1.0 La. At < 1.0 La the offsite dose consequences are bounded by the assumptions of the safety analysis. SR Frequencies are as required by the Containment Leakage Rate Testing Program.

These periodic testing requirements verify that the containment leakage rate does not exceed the leakage rate assumed in the safety analysis.

OCONEE UNITS 1, 2, & 3 B 3.6.1-3 BASES REVISION DATED 10/20/11 I

Containment B 3.6.1 BASES SURVEILLANCE SR 3.6.1.2 REQUIREMENTS (continued) This SR ensures that the structural integrity of the containment will be maintained in accordance with the provisions of the Containment Tendon Surveillance Program. Testing and Frequency are as described in Specification 5.5.7, "Pre-stressed Concrete Containment Tendon Surveillance Program."

REFERENCES 1. 10 CFR 50, Appendix J, Option B.

2. UFSAR, Sections 15.13 and 15.14.
3. UFSAR, Section 6.2.
4. 10 CFR 50.36.
5. UFSAR Chapter 18, Table 18-1.

OCONEE UNITS 1, 2, & 3 B 3.6.1-4 BASES REVISION DATED 10/20/11 I

Containment Air Locks B 3.6.2 B 3.6 CONTAINMENT SYSTEMS B 3.6.2 Containment Air Locks BASES BACKGROUND Containment air locks, also known as the personnel hatch and the emergency hatch, form part of the containment pressure boundary and provide a means for personnel access during all MODES of operation.

Each air lock is nominally a right circular cylinder with a door at each end.

The doors are interlocked to prevent simultaneous opening. During periods when containment is not required to be OPERABLE, the door interlock mechanism may be disabled, allowing both doors of an air lock to remain open for extended periods when frequent containment entry is necessary. Each air lock door has been .designed and is tested to certify its ability to withstand a pressure in excess of the maximum expected pressure following an accident in containment. As such, closure of a single door supports containment OPERABILITY. Each of the outer doors contains double gasketed seals and local leakage rate testing capability to ensure pressure integrity. To effect a leak tight seal, the air lock design uses pressure seated doors (i.e., an increase in containment internal pressure results in increased sealing force on each door). Each personnel air lock door is provided with limit switches that provide control room indication of door position.

The containment air locks form part of the containment pressure boundary.

As such, air lock integrity and leak tightness are essential for maintaining the containment leakage rate within limit in the event of an accident. Not maintaining air lock integrity or leak tightness may result in a leakage rate in excess of that assumed in the unit safety analysis.

APPLICABLE The accident that results in a release of radioactive material within SAFETY ANALYSES containment is a loss of coolant accident (LOCA) (Ref. 2). In the analysis of this accident, it is assumed that containment is OPERABLE such that release of fission products to the environment is controlled by the rate of containment leakage. The containment was designed with an allowable leakage rate of 0.20% of containment air weight per day (Ref. 3). This leakage rate is defined in 10 CFR 50, Appendix J, Option B (Ref. 1), as La:

the maximum allowable containment leakage rate at the calculated OCONEE UNITS 1, 2, & 3 B 3.6.2-1 BASES REVISION DATED 10/20/11 I

Containment Air Locks B 3.6.2 BASES APPLICABLE maximum peak containment pressure (Pa) following a design bases LOCA.

SAFETY ANALYSES This allowable leakage rate forms the basis for the acceptance criteria (continued) imposed on the SRs associated with the air lock.

The containment air locks satisfy Criterion 3 of 10 CFR 50.36 (Ref. 4).

LCO Each containment air lock forms part of the containment pressure boundary. As a part of the containment pressure boundary, the air lock safety function is related to control of the containment leakage rate resulting from an accident. Thus, each air lock's structural integrity and leak tightness are essential to the successful mitigation of such an event.

Each air lock is required to be OPERABLE. For the air lock to be considered OPERABLE, the air lock interlock mechanism must be OPERABLE, the air lock must be in compliance with the Type B air lock leakage test, and both air lock doors must be OPERABLE. The interlock allows only one air lock door of an air lock to be opened at one time. This provision ensures that a gross breach of containment does not exist when containment is required to be OPERABLE. Closure of a single door in each air lock is sufficient to provide a leak tight barrier following postulated events. Nevertheless, both doors are normally closed when the air lock is not being used for normal entry into or exit from containment.

APPLICABILITY In MODES 1, 2, 3, and 4, an accident could cause a release of radioactive material to containment. In MODES 5 and 6, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, the containment air locks are not required in MODE 5 to prevent leakage of radioactive material from containment. The requirements for the containment air locks during MODE 6 are addressed in LCO 3.9.3, "Containment Penetrations."

ACTIONS The ACTIONS are modified by a Note that allows entry and exit to perform repairs on the affected air lock component. If the outer door is inoperable, then it may be easily accessed for most repairs. An inoperable inner door can be accessed from inside containment by entering through the other OPERABLE air lock. However, if this is not practicable, or if repairs on either door must be performed from the barrel side of the door then it is permissible to enter the air lock through the OPERABLE door, which means there is a short time during which the containment boundary is not intact (during access through the OPERABLE door). The ability to open the OPERABLE door, even if it means the containment boundary is OCONEE UNITS 1, 2, & 3 B 3.6.2-2 BASES REVISION DATED 10/20/11 I

Containment Air Locks B 3.6.2 BASES ACTIONS temporarily not intact, is acceptable due to the low probability of an event (continued) that could pressurize the containment during the short time in which the OPERABLE door is expected to be open. After each entry and exit the OPERABLE door must be immediately closed. If conditions permit, entry and exit should be via an OPERABLE air lock.

A second Note has been added to provide clarification that, for this LCO, separate Condition entry is allowed for each air lock. This is acceptable, since the Required Actions for each Condition provide appropriate compensatory actions for each inoperable air lock. Complying with the Required Actions may allow for continued operation, and a subsequent inoperable air lock is governed by subsequent Condition entry and application of associated Required Actions.

In the event the air lock leakage results in exceeding the overall (combined) containment leakage rate, Note 3 directs entry into the applicable Conditions and Required Actions of LCO 3.6.1, "Containment."

A.1, A.2, and A.3 With one air lock door inoperable in one or more containment air locks, the OPERABLE door must be verified closed (Required Action A. 1) in each affected containment air lock.

This ensures that a leak tight containment barrier is maintained by the use of an OPERABLE air lock door. This action must be completed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This specified time period is consistent with the ACTIONS of LCO 3.6.1, which requires containment be restored to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

In addition, the affected air lock penetration must be isolated by locking closed the remaining OPERABLE air lock door within the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is considered reasonable for locking the OPERABLE air lock door, considering the OPERABLE door of the affected air lock is being maintained closed.

Required Action A.3 verifies that an air lock with an inoperable door has been isolated by the use of a locked and closed OPERABLE air lock door.

This ensures that an acceptable containment leakage boundary is maintained. The Completion Time of once per 31 days is based on engineering judgment and is considered adequate in view of the low likelihood of a locked door being mispositioned and other administrative OCONEE UNITS 1, 2, & 3 B 3.6.2-3 BASES REVISION DATED 10/20/11 I

Containment Air Locks B 3.6.2 BASES ACTIONS A.1, A.2, andA.3 (continued) controls. Required Action A.3 is modified by a Note that applies to air lock doors located in high radiation areas and allows these doors to be verified locked closed by use of administrative means. Allowing verification by administrative means is considered acceptable, since access to these areas is typically restricted. Therefore, the probability of misalignment of the door, once it has been verified to be in the proper position, is small.

The Required Actions have been modified by two Notes. Note 1 clarifies that only the Required Actions and associated Completion Times of Condition C are required if both doors in the same air lock are inoperable.

With both doors in the same air lock inoperable, an OPERABLE door is not available to be closed. Required Actions C.1 and C.2 are the appropriate remedial actions. The exception of Note 1 does not affect tracking the Completion Time from the initial entry into Condition A; only the requirement to comply with the Required Actions. Note 2 allows use of the air lock for entry and exit for 7 days under administrative controls if both air locks are inoperable. This 7 day restriction begins when the second air lock is discovered inoperable. Containment entry may be required to perform Technical Specifications (TS) Surveillances and Required Actions, as well as other activities on equipment inside containment that are required by TS or activities on equipment that support TS-required equipment. This Note is not intended to preclude performing other activities (i.e., non-TS-required activities) if the containment was entered, using the inoperable air lock, to perform an allowed activity listed above.

This allowance is acceptable due to the low probability of an event that could pressurize the containment during the short time that the OPERABLE door is expected to be open.

B.1, B.2, and B.3 With an air lock interlock mechanism inoperable in one or more air locks, the Required Actions and associated Completion Times are consistent with those specified in Condition A.

The Required Actions have been modified by two Notes. Note 1 clarifies that only the Required Actions and associated Completion Times of Condition C are required if both doors in the same air lock are inoperable.

With both doors in the same air lock inoperable, an OPERABLE door is not available to be closed. Required Actions C.1 and C.2 are the appropriate remedial actions. Note 2 allows entry into and exit from the containment OCONEE UNITS 1, 2, & 3 B 3.6.2-4 BASES REVISION DATED 10/20/11 I

Containment Air Locks B 3.6.2 BASES ACTIONS B.1, B.2, and B.3 (continued) under the control of a dedicated individual stationed at the air lock to ensure that only one door is opened at a time (i.e., the individual performs the function of the interlock).

Required Action B.3 is modified by a Note that applies to air lock doors located in high radiation areas and allows these doors to be verified locked closed by use of administrative means. Allowing verification by administrative means is considered acceptable, since access to these areas is typically restricted. Therefore, the probability of misalignment of the door, once it has been verified to be in the proper position, is small.

C.1, C.2, and C.3 With one or more air locks inoperable for reasons other than those described in Condition A or B, Required Action C.1 requires action to be immediately initiated to evaluate previous combined leakage rates using current air lock test results. An evaluation is acceptable since it is overly conservative to immediately declare the containment inoperable if the overall air lock leakage is not within limits. In many instances, containment remains OPERABLE, yet only 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (per LCO 3.6.1) would be provided to restore the air lock door to OPERABLE status prior to requiring a unit shutdown.

Required Action C.2 requires that one door in each affected containment air lock must be verified to be closed. This action must be completed within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time. This specified time period is consistent with the ACTIONS of LCO 3.6.1, which requires that containment be restored to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Additionally, the affected air lock(s) must be restored to OPERABLE status within the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time. The specified time period is considered reasonable for restoring an inoperable air lock to OPERABLE status assuming that at least one door is maintained closed in each affected air lock.

D.1 and D.2 If the Required Actions and associated Completion Times are not met, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 within OCONEE UNITS 1, 2, & 3 B 3.6.2-5 BASES REVISION DATED 10/20/11 I

Containment Air Locks B 3.6.2 BASES ACTIONS D.1 and D.2 (continued) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

SURVEILLANCE SR 3.6.2.1 REQUIREMENTS Maintaining containment air locks OPERABLE requires compliance with the leakage rate test requirements of the Containment Leakage Rate Testing Program. This SR reflects the leakage rate testing requirements with regard to air lock leakage (Type B leakage tests). The periodic testing requirements verify that the air lock leakage does not exceed the allowed fraction of the overall containment leakage rate. The Frequency is required by the Containment Leakage Rate Testing Program.

The SR has been modified by two Notes. Note 1 states that an inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test. This is considered reasonable, since either air lock door is capable of providing a fission product barrier in the event of an accident. Note 2 has been added to this SR requiring the results to be evaluated against the acceptance criteria which are applicable to SR 3.6.1.1. This ensures that air lock leakage is properly accounted for in determining the combined Type B and C containment leakage rate.

SR 3.6.2.2 The air lock interlock is designed to prevent simultaneous opening of both doors in a single air lock. Since both the inner and outer doors of an air lock are designed to withstand the maximum expected post accident containment pressure, closure of either door will support containment OPERABILITY. Thus, the door interlock feature supports containment OPERABILITY while the air lock is being used for personnel transit in and out of the containment. Periodic testing of this interlock demonstrates that OCONEE UNITS 1, 2, & 3 B 3.6.2-6 BASES REVISION DATED 10/20/11 I

Containment Air Locks B 3.6.2 BASES SURVEILLANCE SR 3.6.2.2 (continued)

REQUIREMENTS the interlock will function as designed and that simultaneous opening of the inner and outer doors will not inadvertently occur. Due to the purely mechanical nature of this interlock, and given that the interlock mechanism is not normally challenged when the containment air lock door is used for entry or exit (procedures require strict adherence to single door opening),

this test is only required to be performed every 18 months. The 18 month Frequency is based on the need to perform this Surveillance under the conditions that apply during a unit outage, and the potential loss of containment OPERABILITY if the Surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the Surveillance when performed at the 18 month Frequency.

The 18 month Frequency is based on engineering judgment and is considered adequate given that the interlock is not challenged during use of the air lock.

REFERENCES 1. 10 CFR 50, Appendix J, Option B.

2. UFSAR, Section 15.14.
3. UFSAR, Section 6.2.
4. 10 CFR 50.36.
5. Duke Power Company letter from William 0. Parker, Jr. to Harold R. Denton (NRC) dated July 24, 1981.
6. NRC Letter from Philip C. Wagner to William 0. Parker, Jr., dated November 6, 1981, Issuance of Amendment 104, 104 and 101 to Licenses DPR-38, DPR-47 and DPR-55 for the Oconee Nuclear Station Units Nos 1, 2 and 3.

OCONEE UNITS 1, 2, & 3 B 3.6.2-7 BASES REVISION DATED 10/20/11 I

Attachment 2 Markup of current TSB

SR Applicability B 3.0 BASES SR 3.0.2 The 25% extension does not significantly degrade the reliability that results (continued) from performing the Surveillance at its specified Frequency. This is based on the recognition that the most probable result of any particular Surveillance being performed is the verification of conformance with the SRs. The exceptions to SR 3.0.2 are those Surveillances for which the 25% extension of the interval specified in the Frequency does not apply.

These exceptions are stated in the individual Specifications. The requirements of regulations take precedence over the TS. An example of where SR 3.0.2 does not apply is a SurVeillane with a

.Frquenc. of "in the Containment Leakage Rate Testing Program. This program establishes testing requirements and Frequencies in accordance with 10 CFR 50, Appendix j, as mod*,ified, by apprFoed exemptiRn.." the requirements of regulations take pr*eedenceoe* n th T,. The TS cannot in and of themselves extend a test interval specified in the regulations.

Therefore, there isa Note inthe FrequencGy stating-,

"S-R 3.01.2 IR-not applicable-."

As stated in SR 3.0.2, the 25% extension also does not apply to the initial portion of a periodic Completion Time that requires performance on a "once per..."basis. The 25% extension applies to each performance after the initial performance. The initial performance of the Required Action, whether it is a particular Surveillance or some other remedial action, is considered a single action with a single Completion Time. One reason for not allowing the 25% extension to this Completion Time is that such an action usually verifies that no loss of function has occurred by checking the status of redundant or diverse components or accomplishes the function of the inoperable equipment in an alternative manner.

The provisions of SR 3.0.2 are not intended to be used repeatedly merely as an operational convenience to extend Surveillance intervals (other than those consistent with refueling intervals) or periodic Completion Time intervals beyond those specified.

SR 3.0.3 SR 3.0.3 establishes the flexibility to defer declaring affected equipment inoperable or an affected variable outside the specified limits when a Surveillance has not been completed within the specified Frequency. A delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater, applies from the point in time that it is discovered that the Surveillance has not been performed in accordance with SR 3.0.2, and not at the time that the specified Frequency was not met.

This delay period provides an adequate time to complete Surveillances that have been missed. This delay period permits the completion of a Surveillance before complying with Required Actions or other remedial OCONEE UNITS 1, 2, & 3 B 3.0-13 BASES REVISION DATED I

Containment B3.6.1 B 3.6 CONTAINMENT SYSTEMS B 3.6.1 Containment BASES BACKGROUND The containment consists of the reactor building (RB) structure, its steel liner, and the penetrations of this liner and structure. The containment is designed to contain radioactive material that may be released from the reactor core following aria design basis loss of coolant accident-(LOCA). Additionally, the containment provides shielding from the fission products that may be present inthe containment atmosphere following accident conditions.

The containment is a reinforced concrete structure with a cylindrical wall, a flat foundation mat, and a shallow dome roof. The containment design includes ungrouted tendons where the cylinder wall is prestressed with a post tensioning system in the vertical and horizontal directions, and the dome roof is prestressed using a three way post tensioning system. The inside surface of the containment is lined with a carbon steel liner to ensure a high degree of leak tightness during operating and accident conditions.

The reinforced concrete structure is required for structural integrity of the containment under aGeide, tDesign Basis Accident (DBA) conditions.

The steel liner and its penetrations establish the leakage limiting boundary of the containment. Maintaining the containment OPERABLE limits the leakage of fission product radioactivity from the containment to the environment. SR 3.6.1.1 and SR 3.6.1.2 leakage rate requirements comply with 10 CFR 50, Appendix J, OptionA and- B-as applirabloB" (Ref. 1), as modified by approved exemptions.

The isolation devices for the penetrations in the containment boundary are a part of the containment leak tight barrier. To maintain this leak tight barrier:

a. All penetrations required to be closed during accident conditions are either:
1. capable of being closed by an OPERABLE automatic containment isolation system, or
2. closed by manual valves, blind flanges, or de-activated automatic valves in their closed positions, except as provided in LCO 3.6.3, "Containment Isolation Valves";

OCONEE UNITS 1, 2, & 3 B 3.6. 1-1 BASES REVISION DATED

Containment B 3.6.1 BASES BACKGROUND b. Each air lock is OPERABLE, except as provided in LCO 3.6.2, (continued) "Containment Air Locks"; and

c. The equipment hatch is closed.

APPLICABLE The safety design basis for the containment is that the containment must SAFETY ANALYSES withstand the pressures and temperatures of the limiting accident without exceeding the design leakage rate.

The accidents that result in a challenge to containment from high pressures and temperatures are a lecs of coolant a.ccident (LOCA) and a steam line break (Ref. 2). In addition, release of significant fission product radioactivity within containment can occur from a LOCA. In the accident analyses, it is assumed that the containment is OPERABLE such that, for the accidents involving release of fission product radioactivity, release to the environment is controlled by the rate of containment leakage. The containment was designed with an allowable leakage rate of 0.20% of containment air weight per day (Ref. 3). This leakage rate, used in the evaluation of offsite doses resulting from accidents, is defined in 10 CFR 50, Appendix J, Option A aRd B (Ref. 1), as La: the maximum allowable leakage rate at the calculated maximum peak containment pressure (Pa) resulting from the limiting aceident.esign basis LOCA. The allowable leakage rate represented by La forms the basis for the acceptance criteria imposed on all containment leakage rate testing. La is assumed to be 0.20% per day in the safety analysis at Pa = 59.0 psig (Ref. 3).

The containment satisfies Criterion 3 of the 10 CFR 50.36 (Ref. 4).

LCO Containment OPERABILITY is maintained by limiting leakage to < 1.0 La, except prior to the first startup after performing a required 10 CFR 50, AppeAdixb,-Containment Leakage Rate Testing Program leakage test.

At this time, the applicable leakage limits must be met. Compliance with this LCO will ensure a containment configuration, including equipment hatches, that is structurally sound and that will limit leakage to those leakage rates assumed in the safety analysis.

APPLICABILITY In MODES 1, 2, 3, and 4, an accident could cause a release of radioactive material into containment. In MODES 5 and 6, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, containment is not required to be OPERABLE in MODE 5 to prevent leakage of radioactive material from containment. The requirements for containment during MODE 6 are addressed in LCO 3.9.3, "Containment Penetrations."

OCONEE UNITS 1, 2, & 3 B 3.6.1-2 BASES REVISION DATED

Containment B 3.6.1 BASES (continued)

ACTIONS A. 1 In the event containment is inoperable, containment must be restored to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time provides a period of time to correct the problem commensurate with the importance of maintaining containment during MODES 1, 2, 3, and 4. This time period also ensures the probability of an accident (requiring containment OPERABILITY) occurring during periods when containment is inoperable is minimal.

B.1 and B.2 If the Required Action and associated Completion Time is not met, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

SURVEILLANCE SR 3.6.1.1 REQUIREMENTS Maintaining the containment OPERABLE requires compliance with the visual examinations and Type-A-leakage rate test requirements of the Containment Leakage Rate Testing Program. As left leakage prior to the first startup after performing a required Containment Leakage Rate Testing Program leakage test is required to be < 0.6 L. for combined Type B and C leakage, and < 0.75 La for Option B for overall Type A leakage following an outage or shutdown that included Type A testing. At all other times between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of *_ 1.0 La. At < 1.0 La the offsite dose consequences are bounded by the assumptions of the safety analysis. SR Frequencies are as required by the Containment Leakage Rate Testing Program. These periodic testing requirements verify that the containment leakage rate does not exceed the leakage rate assumed in the safety analysis.

OCONEE UNITS 1, 2, & 3 B 3.6.1-3 BASES REVISION DATED

Containment B 3.6.1 BASES SURVEILLANCE SR 3.6.1.3-2 REQUIREMENTS (continued) Maintaining the containment OPERABLE requires comRpliance with the Type B3 and G leakage rate test requirements of 10 CFR 50, Appendix j, Option A (Ref. 1), as moedified by approved exemptions. As loft leakage-prior to the first startup after performin a reurd-100 GOFR 50, Appendix-4J, Option A, leakage test is rqidtob ,0.6 Lafor combined Type B and C leakage. At all other times ~bet:nreuie iokgo rate tests, the a criteialbaIedon!! an overall Type A lIakage limit o 1V n

At!!- -.O-L. the oef~feit~e dGeo con~sequences are boGunded by the assumptions of the safet analysis. SR Frequencie ar as re-quired by Appendix j, Option A, as modified by approved exemptions. Thus, SR 3.0.2 (Which allows Frequency extensions) does not apply. These periodic testing requirements Yerify that the acontainment leakage rate do-es not ex-e-edth leakaQe rate assumed in the safety analysis.

SR 3.6.1.3 This SR ensures that the structural integrity of the containment will be maintained in accordance with the provisions of the Containment Tendon Surveillance Program. Testing and Frequency are as described in Specification 5.5.7, "Pre-stressed Concrete Containment Tendon Surveillance Program."

REFERENCES 1. 10 CFR 50, Appendix J, Option A-and-B.

2. UFSAR, Sections 15.13 and 15.14.
3. UFSAR, Section 6.2.
4. 10 CFR 50.36.
5. UFSAR Chapter 18, Table 18-1.

OCONEE UNITS 1, 2, &3 B 3.6.1-5 BASES REVISION DATED

Containment Air Locks B 3.6.2 B 3.6 CONTAINMENT SYSTEMS B 3.6.2 Containment Air Locks BASES BACKGROUND Containment air locks, also known as the personnel hatch and the emergency hatch, form part of the containment pressure boundary and provide a means for personnel access during all MODES of operation.

Each air lock is nominally a right circular cylinder with a door at each end.

The doors are interlocked to prevent simultaneous opening. During periods when containment is not required to be OPERABLE, the door interlock mechanism may be disabled, allowing both doors of an air lock to remain open for extended periods when frequent containment entry is necessary. Each air lock door has been designed and is tested to certify its ability to withstand a pressure in excess of the maximum expected pressure following an accident in containment. As such, closure of a single door supports containment OPERABILITY. Each of the outer doors contains double gasketed seals and local leakage rate testing capability to ensure pressure integrity. To effect a leak tight seal, the air lock design uses pressure seated doors (i.e., an increase in containment internal pressure results in increased sealing force on each door). Each personnel air lock door is provided with limit switches that provide control room indication of door position.

The containment air locks form part of the containment pressure boundary.

As such, air lock integrity and leak tightness are essential for maintaining the containment leakage rate within limit in the event of an accident. Not maintaining air lock integrity or leak tightness may result in a leakage rate in excess of that assumed in the unit safety analysis.

APPLICABLE The accident that results in a release of radioactive material within SAFETY ANALYSES containment is a loss of coolant accident (LOCA) (Ref. 2). In the analysis of this accident, it is assumed that containment is OPERABLE such that release of fission products to the environment is controlled by the rate of containment leakage. The containment was designed with an allowable leakage rate of 0.20% of containment air weight per day (Ref. 3). This leakage rate is defined in 10 CFR 50, Appendix J, Option AB a I (Ref. 1), as La: the maximum allowable containment leakage rate at the calculated OCONEE UNITS 1, 2, & 3 B 3.6.2-1 BASES REVISION DATED 07/12501 I

Containment Air Locks B 3.6.2 BASES APPLICABLE maximum peak containment pressure (Pa) following a design bases LOCAan aG.ident SAFETY ANALYSES This SRA.FE TY ANALYSES allowable leakage rate forms the basis for the acceptance criteria (continued) imposed on the SRs associated with the air lock.

The containment air locks satisfy Criterion 3 of 10 CFR 50.36 (Ref. 4).

LCO Each containment air lock forms part of the containment pressure boundary. As a part of the containment pressure boundary, the air lock safety function is related to control of the containment leakage rate resulting from an accident. Thus, each air lock's structural integrity and leak tightness are essential to the successful mitigation of such an event.

Each air lock is required to be OPERABLE. For the air lock to be considered OPERABLE, the air lock interlock mechanism must be OPERABLE, the air lock must be in compliance with the Type B air lock leakage test, and both air lock doors must be OPERABLE. The interlock allows only one air lock door of an air lock to be opened at one time. This provision ensures that a gross breach of containment does not exist when containment is required to be OPERABLE. Closure of a single door in each air lock is sufficient to provide a leak tight barrier following postulated events. Nevertheless, both doors are normally closed when the air lock is not being used for normal entry into or exit from containment.

APPLICABILITY In MODES 1, 2, 3, and 4, an accident could cause a release of radioactive material to containment. In MODES 5 and 6, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, the containment air locks are not required in MODE 5 to prevent leakage of radioactive material from containment. The requirements for the containment air locks during MODE 6 are addressed in LCO 3.9.3, "Containment Penetrations."

ACTIONS The ACTIONS are modified by a Note that allows entry and exit to perform repairs on the affected air lock component. If the outer door is inoperable, then it may be easily accessed for most repairs. An inoperable inner door can be accessed from inside containment by entering through the other OPERABLE air lock. However, ifthis is not practicable, or if repairs on either door must be performed from the barrel side of the door then it is permissible to enter the air lock through the OPERABLE door, which means there is a short time during which the containment boundary is not intact (during access through the OPERABLE door). The ability to open the OPERABLE door, even if it means the containment boundary is OCONEE UNITS 1, 2, & 3 B 3.6.2-2 BASES REVISION DATED 07/251/11

Containment Air Locks B 3.6.2 BASES ACTIONS D.1 and D.2 (continued) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

SURVEILLANCE SR 3.6.2.1 REQUIREMENTS Maintaining containment air locks OPERABLE requires compliance with the leakage rate test requirements of the Containment Leakage Rate Testing Program.10 CFR 50, Appendi* j,^Opti A (Ref. 1), as modi:*ed by app.....d oxomptiO,,. This SR reflects the leakage rate testing requirements with regard to air lock leakage (Type B leakage tests). The periodic testing requirements verify that the air lock leakage does not exceed the allowed fraction of the overall containment leakage rate. The Frequency is required by the Containment Leakage Rate Testing Program. 10 CrFR 5, AppeRdix j, OptiGn A, a" medi.*,,d by app....ed

...... JL.* ..... JL owMepHuoR. +F1616, aMt a nicndtHGiaoW6 rroguOncY OXMflSIOflS) aoS RE*

apply. Either- a full ir" lock leak tent oar 2 leak test of*the outer air. lock doo real performead within 3 days of intaGpening, and duArin poriods of fr9equet ucoe, at leact onAG over; 3 days, 46 an accaptablo me~thod of comRplYing With 10 CFR 50, Appeni~x j reguiromontcs (Refo~ronAc 5 and 6)2 The SR has been modified by two Notes. Note 1 states that an inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test. This is considered reasonable, since either air lock door is capable of providing a fission product barrier in the event of an accident. Note 2 has been added to this SR requiring the results to be evaluated against the acceptance criteria ef-which are applicable to SR 3.6.1.2,1. This ensures that air lock leakage is properly accounted for in determining the combined Type B and C containment leakage rate.

SR 3.6.2.2 The air lock interlock is designed to prevent simultaneous opening of both doors in a single air lock. Since both the inner and outer doors of an air lock are designed to withstand the maximum expected post accident containment pressure, closure of either door will support containment OPERABILITY. Thus, the door interlock feature supports containment OPERABILITY while the air lock is being used for personnel transit in and out of the containment. Periodic testing of this interlock demonstrates that OCONEE UNITS 1, 2, & 3 B 3.6.2-6 -BASES REVISION DATED 01" 261)14 4

Containment Air Locks B 3.6.2 BASES SURVEILLANCE SR 3.6.2.2 (continued)

REQUIREMENTS the interlock will function as designed and that simultaneous opening of the inner and outer doors will not inadvertently occur. Due to the purely mechanical nature of this interlock, and given that the interlock mechanism is not normally challenged when the containment air lock door is used for entry or exit (procedures require strict adherence to single door opening),

this test is only required to be performed every 18 months. The 18 month Frequency is based on the need to perform this Surveillance under the conditions that apply during a unit outage, and the potential loss of containment OPERABILITY ifthe Surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the Surveillance when performed at the 18 month Frequency.

The 18 month Frequency is based on engineering judgment and is considered adequate given that the interlock is not challenged during use of the air lock.

REFERENCES 1. 10 CFR 50, Appendix J, Option A-and-B.

2. UFSAR, Section 15.14.
3. UFSAR, Section 6.2.
4. 10 CFR 50.36.
5. Duke Power Company letter from William 0. Parker, Jr. to Harold R. Denton (NRC) dated July 24, 1981.
6. NRC Letter from Philip C. Wagner to William 0. Parker, Jr., dated November 6, 1981, Issuance of Amendment 104, 104 and 101 to Licenses DPR-38, DPR-47 and DPR-55 for the Oconee Nuclear Station Units Nos 1, 2 and 3.

OCONEE UNITS 1, 2, & 3 B 3.6.2-7 -BASES REVISION DATED 9"725/11