2011 SFST Technical Exchange, November 1, 2011, Presentation: Stack-up Analysis, Comanche Peak Nuclear Power Plant (Cpnpp), by Bruce F. Henley, PE &Pmp, Project Manager, Luminant Power
ML113120597
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/01/2011
From: Henley B
Luminant Power
To:
Office of Nuclear Material Safety and Safeguards
Lindsay, H. NMSS/SFST 301-492-3280
Shared Package
ML113120287 List:
References
Download: ML113120597 (15)


Text

Spent Fuel Storage and Transportation Technology Exchange November 1, 2011 By Bruce F. Henley, PE & PMP Project Manager Luminant Power 11/01/2011 1

Comanche Peak Nuclear Power Plant (CPNPP)

  • Operating Licenses in 90 and 93
  • Common Fuel Building for Both Units
  • Seismic Analysis Methods Described in Facility UFSAR Chapter 3 11/01/2011 2

CPNPP Dry Cask Storage

  • Stack-Up and Transfer

- In Fuel Building Railroad Bay

- On the Structures Basemat 11/01/2011 3

CPNPP Free-Standing Seismic Analyses Licensing Issues -

  • Controlled by Part 50 or Part 72 ?
  • Part 72 FSAR Silent on Stack-up Inside Part 50 Structure
  • CoC Silent on Stack-up Inside Part 50 Structures
  • Part 50 Compliance is Plant Specific Requirement 11/01/2011 4

CPNPP Free-Standing Seismic Analyses Technical Issues With Vendors Analysis -

  • Energy Dissipation
  • Seismic Analysis Method
  • Computer Code Used
  • Coefficients of Friction 11/01/2011 5

CPNPP Free-Standing Seismic Analyses Evaluation of Requirements -

  • Must Pass 50.59 on Methodology
  • Part 50 Based Analyses Would Satisfy Part 72 Requirements

CPNPP Free-Standing Seismic Analyses Conclusion -

  • Analysis Methods Did Not Pass 50.59 Evaluation
  • Toppling Consequences Not Acceptable
  • Modifications Are Required In Order to Pass 50.59 Evaluation 11/01/2011 7

CPNPP Lateral Seismic Restraint

  • Required to Conform to Part 50 UFSAR Design Criteria
  • 50.59 Evaluation For Newer ANSYS Versions
  • Modified Stack to Being Rigid
  • Results 11/01/2011 8

11/01/2011 9

11/01/2011 10

CPNPP Long Range Goal Have a Free-standing seismic stack-up analysis in lieu of the lateral seismic restraint.

  • If Shimmed, 72.48 & 50.59 Applicable
  • Seismic Analysis, 50.59 Applicable 11/01/2011 11

Regulatory Guidance Desired Guidance For Analysis Should Address -

  • Both Part 100 and pre-Part 100 Plants
  • Building on Plants Part 50 UFSAR Requirements
  • Useful for Both Inspectors and Utilities 11/01/2011 12

Regulatory Guidance Desired Guidance For Analysis Should Address (cont.) -

  • Sliding & Rocking
  • Coefficients of Friction
  • Stability Analysis Methods
  • Additional Analysis Considerations 11/01/2011 13

Regulatory Guidance Desired Guidance For Analysis Should Address (cont.) -

  • Design Considerations
  • Design Margins / Factors of Safety
  • Guidance Should Be 50.59 Friendly (NEI 96-07)
  • Audits / Inspections to Verify Compliance 11/01/2011 14

Questions?

11/01/2011 15