Request for Additional Information Regarding 60-Day Response to Bulletin 2011-01, Mitigating Strategies
ML11308A090
Person / Time
Site: Vogtle  
(NPF-068, NPF-081)
Issue date: 11/29/2011
From: Jaffe D
Plant Licensing Branch II
To: Ajluni M
Southern Nuclear Operating Co
Jaffe D, NRO/DNRL, 415-1439
References
TAC ME6497, TAC ME6498
Download: ML11308A090 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 29, 2011 Mr. M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295, Bin - 038 Birmingham, AL 35201-1295

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (VOGTLE 1 AND 2) - REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING 60-DAY RESPONSE TO BULLETIN 2011-01, "MITIGATING STRATEGIES" (TAC NOS. ME6497 AND ME6498)

Dear Mr. Ajluni:

On May 11, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies" (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML111250360), to all holders of operating licenses for nuclear power reactors, except those that have permanently ceased operation and have certified that fuel has been removed from the reactor vessel. The purpose of the bulletin was to obtain a comprehensive verification that licensees' mitigating strategies to maintain or restore core cooling, spent fuel cooling, and containment following a large explosion or fire were compliant with Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.54(hh)(2). The bulletin requested information on licensee 10 CFR 50.54(hh)(2) mitigating strategies in light of the recent events at Japan's Fukushima Daiichi facility to determine if (1) additional assessment of program implementation is needed, (2) the current inspection program should be enhanced, or (3) further regulatory action is warranted.

The bulletin required two sets of responses pursuant to the provisions of 10 CFR 50.54(f). The first responses were due 30 days after issuance of the bulletin (June 10, 2011). By letter dated June 8, 2011 (ADAMS Accession No. ML111590883), you provided a response to the first set of questions for VogtJe 1 and 2. The second responses were due 60 days after issuance of the bulletin (July 11,2011). By letter dated July 8,2011 (ADAMS Accession No. ML111890487),

you responded to this second set of questions.

The NRC staff has reviewed the submitted information and determined that it needs additional information regarding your 60-day response to the bulletin. Please respond to the enclosed RAI within 30 days of the date of this letter.

M. AJluni

-2 If you have any questions regarding this letter, please feel free to contact me at (301) 415-1439.

Sincerely,

\\I~"r:' \\ '

(

,./,

David

. Jaffe, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosure:

RAI cc w/encl: Distribution via Listserv

VOGTLE ELECTRIC GENERATING PLANT. UNITS 1 AND 2 REQUEST FOR ADDITIONAL INFORMATION REGARDING NRC BULLETIN 2011-01, "MITIGATING STRATEGIES" TAC NOS. ME6497 AND ME6498

1. Describe in detail the testing and inventory of radio communications equipment to ensure that it is available and functional when needed.

The bulletin requested that each licensee describe in detail the testing and control of equipment supporting the mitigating strategies to ensure that it will be available and functional when needed. Communications equipment needed to support the mitigating strategies was described in the Nuclear Regulatory Commission (NRC) Safety Evaluation dated July 18, 2007 (Agencywide Documents and Management System Accession No. ML071940001), documenting the NRC review of your response to Section B.5.b of the Interim Compensatory Measures Order (EA-02-026), and typically includes radios, satellite phones, spare batteries, and chargers. The NRC staff notes that your response identifies testing and inventory of satellite and cell phones, but does not include similar activities for radio communications equipment.

2. Describe in detail how you ensure that a vehicle is available to move the B.5.b portable pump and other B.5.b equipment to the appropriate place when needed.

The bulletin requested that each licensee describe in detail the controls for ensuring equipment needed to execute the mitigating strategies will be available when needed. A vehicle is typically needed to implement the strategies since the portable pump and other equipment is stored away from target areas. The NRC staff could not determine if you performed activities to ensure that a tow vehicle would be available when needed.

Enclosure

M. Ajluni

- 2 If you have any questions regarding this letter, please feel free to contact me at (301) 415-1439.

Sincerely, IRA!

David H. Jaffe, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosure:

RAI cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC SRosenberg LPL2-1 R/F RidsNrrDorlDPR BPurnell RidsNrrLAMO'Brien RidsNrrDorlLpl2-1 RidsAcrsAcnw_MailCenter EBowman RidsNrrPMNorthAnna RidsOgcRp RidsRgn2MailCenter ADAMS Accession No' ML11308A090 OFFICE LPL2-1:PM LPL2-1 :LA DPR:PGCB:PM NAME DHJaffe MO'Brien BPurnell DATE 11/28/11 11/15/11 11/28/11 OFFICE DPR:PGCB:BC LPL2-1:BC LPL2-1 :PM NAME SRosenberg GKulesa DHJaffe DATE 11/28/11 11/29/11 11/29/11 OFFICIAL AGENCY RECORD