UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2011 Mr. Paul Freeman Site Vice President NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEABROOK STATION, LICENSE RENEWAL APPLICATION

Dear Mr. Freeman:

By letter dated May 25, 2010, NextEra Energy Seabrook, LLC, submitted an application pursuant to 10 CFR Part 54, to renew the operating license NPF-86 for Seabrook Station, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.

Items in the enclosure were discussed with Richard Cliche, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at (301) 415-2927 or e-mail richard.plasse@nrc.gov.

Sincerely,

~::::x.ct Manager License Renewal Branch RPB1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Request for Additional Information cc w/encl: Listserv

SEABROOK STATION LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION Set 17 Follow-up RAI 8.2.1.30-2

Background

In its response to RAI B.2.1.30-2, dated January 13, 2011, the applicant stated that the personnel performing the visual examination of concrete surfaces prior to Integrated Leak Rate Test are not qualified in accordance with IWA-2300. There is no requirement in 10 CFR SO.SSa that Appendix J general visual inspection personnel be qualified per IWA-2300. The application further stated that this is a general inspection of the containment surface for any apparent degradation that would cause failure of the Integrated Leak Rate Test.

Issue In its response, the applicant did not provide any information about the qualification of the personnel performing the visual examination. In addition, the response did not provide any specific quantitative acceptance criteria for inspection of the containment interior and exterior surfaces. In addition, the staff reviewed the applicant's "complex procedure" as well as procedure EX1803.004, "Containment and Containment Enclosure Surface Inspection," and did not find information about the qualification of the personnel or any quantitative acceptance criteria that will define severe cracks, spalling, popouts, surface voids, or other irregularities.

Request Please provide information about the qualification of the personnel performing the general visual inspection of the accessible interior and exterior surfaces of the containment system for structural deterioration which may affect the containment leak-tight integrity conducted prior to each Type A test, and at a periodic interval between the Type A tests. In addition, provide the acceptance criteria used for these inspections.

ENCLOSURE

November 3, 2011 Mr. Paul Freeman Site Vice President NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEABROOK STATION, LICENSE RENEWAL APPLICATION

Dear Mr. Freeman:

By letter dated May 25,2010, NextEra Energy Seabrook, LLC, submitted an application pursuant to 10 CFR Part 54, to renew the operating license NPF-86 for Seabrook Station, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.

Items in the enclosure were discussed with Richard Cliche, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at (301) 415-2927 or e-mail richard. plasse@nrc.gov.

Sincerely, IRA!

Rick Plasse, Project Manager License Renewal Branch RPB 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Request for Additional Information cc w/encl: Listserv DISTRIBUTION:

See following pages ADAMS Accession No'.. ML11304A001 OFFICE PM:RPB1 :DLR OGC (NLO)

BC:RPB1 :DLR PM:RPB1 :DLR NAME LA:DLR*

DMorey RPlasse MSpencer RPlasse DATE T11I1/2011 SFigueroa 11/2/2011 11/2/2011 11/1/2011 11/3/2011 OFFICIAL RECORD COpy

Letter to P. Freeman from R. Plasse dated November 3, 2011 SUB,JECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEABROOK STATION, LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLICRidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource MWentzel RPlasse DMorey DWrona EMilier ICouret, OPA EDacus,OCA MSpencer, OGC WRaymond, RI DTifft, RI NMcNamara, RI NSheehan, RI DScrenci, RI JJohnson, RI ABurritt, RI