|
---|
Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] Category:Meeting Notice
MONTHYEARPMNS20241383, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 22024-11-0707 November 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 PMNS20241229, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 22024-10-0303 October 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 PMNS20240978, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant and Watts Bar Nuclear Plant License Amendment Request to Revise Technical Specs 3.5.2, Note 1 Related to the Residual Heat Removal System2024-08-13013 August 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant and Watts Bar Nuclear Plant License Amendment Request to Revise Technical Specs 3.5.2, Note 1 Related to the Residual Heat Removal System PMNS20241000, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program2024-08-0606 August 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program PMNS20240831, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program2024-06-24024 June 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program ML24137A2872024-05-16016 May 2024 Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing PMNS20240663, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications2024-05-0909 May 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications PMNS20240568, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications2024-04-24024 April 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications PMNS20240350, Annual Assessment Virtual Public Meeting2024-03-11011 March 2024 Annual Assessment Virtual Public Meeting PMNS20240344, Annual Assessment Public Poster Session and Open House Meeting2024-03-0707 March 2024 Annual Assessment Public Poster Session and Open House Meeting ML24044A0872024-02-14014 February 2024 TVA Slides - Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request to Revise TS 3.7.11, Main Control Room Area Chilled Water System PMNS20240088, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications2024-01-30030 January 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications PMNS20231329, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-11-28028 November 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20231126, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 22023-10-18018 October 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 PMNS20231024, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-09-18018 September 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230916, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-08-31031 August 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230795, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-06-30030 June 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230712, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-06-12012 June 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20230549, Annual Assessment Virtual Meeting for the 2022 Assessment Period2023-04-25025 April 2023 Annual Assessment Virtual Meeting for the 2022 Assessment Period PMNS20230446, Annual Assessment Public Poster Session and Openhouse Meeting2023-04-17017 April 2023 Annual Assessment Public Poster Session and Openhouse Meeting PMNS20230127, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Increase the Allowable Number of Tritium Producing Burnable Absorber Rods2023-02-13013 February 2023 Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Increase the Allowable Number of Tritium Producing Burnable Absorber Rods PMNS20221292, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request2023-01-11011 January 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request PMNS20221152, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 22022-11-0303 November 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 PMNS20220956, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request2022-09-20020 September 2022 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request PMNS20220531, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah and Watts Bar Nuclear Plants2022-05-19019 May 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah and Watts Bar Nuclear Plants PMNS20220379, Meeting with Tennessee Valley Authority to Discuss a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 22022-04-0808 April 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 PMNS20220314, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Sequoyah and Watts Bar Nuclear Plants2022-03-31031 March 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Sequoyah and Watts Bar Nuclear Plants PMNS20220285, Annual Assessment Meeting2022-03-29029 March 2022 Annual Assessment Meeting PMNS20211575, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed License Amendment Request2022-01-18018 January 2022 Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed License Amendment Request PMNS20211571, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Tritium Producing Burnable Absorption Rods2022-01-0606 January 2022 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Tritium Producing Burnable Absorption Rods PMNS20211507, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Capsule Withdrawal2021-12-0101 December 2021 Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Capsule Withdrawal PMNS20211154, Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request2021-09-21021 September 2021 Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request PMNS20211126, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 22021-09-0808 September 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 PMNS20210945, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 22021-08-0606 August 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 PMNS20211003, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 22021-08-0505 August 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2 PMNS20210829, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 22021-07-12012 July 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 ML21189A0982021-07-0808 July 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, PMNS20210702, Closed Meeting with Representatives from the Tennessee Valley Authority to Discuss a Planned Request for Exemption2021-05-25025 May 2021 Closed Meeting with Representatives from the Tennessee Valley Authority to Discuss a Planned Request for Exemption ML21117A1582021-04-27027 April 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Proposed License Amendment Request PMNS20210392, Annual Assessment Meeting2021-04-12012 April 2021 Annual Assessment Meeting ML21096A1772021-04-0606 April 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed Alternative Request ML21083A0632021-03-24024 March 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed Alternative Request PMNS20210104, Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 22021-02-0101 February 2021 Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML21019A0152021-01-19019 January 2021 Teleconference with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Planned Steam Generator License Amendment Requests ML20349A3132020-12-14014 December 2020 Teleconference Call with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar Nuclear Plant, Unit 2 Steam Generator Replacement ML20342A3592020-12-0707 December 2020 Teleconference Call with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML20315A3992020-11-10010 November 2020 Teleconference Call with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML20295A5382020-10-21021 October 2020 Teleconference Call with Tennessee Valley Authority Regarding a Non-Conservative Technical Specification for the Watts Bar Nuclear Plant ML20279A2882020-10-0505 October 2020 Teleconference Call with Tennessee Valley Authority Regarding a Non-Conservative Technical Specification for the Watts Bar Nuclear Plant ML20167A1202020-06-30030 June 2020 Public Meeting Notice - Notice of Predecisional Enforcement Conference (Pec) Between U.S. Nuclear Regulatory Commission (NRC) and Tennessee Valley Authority (TVA) (EA-20-006, EA-20-007) 2024-08-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 October 26, 2011 Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
MEETING ANNOUNCEMENT - CATEGORY 1 PUBLIC MEETING WATTS BAR NUCLEAR UNIT 2, DOCKET NO.05-391
Dear Mr. Skaggs:
This letter confirms a Category 1 public meeting which has been scheduled for November 8, 2011, from 1:00p.m. - 3:00p.m. (EST). The enclosed meeting notice provides additional details.
The purpose of the meeting is to discuss the status of the Watts Bar Unit 2 Construction Project, including major milestones and potential challenges that may impact the project schedule. The NRC will be available to ensure the publics issues and concerns are understood and considered.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4446.
Sincerely,
/RA/
Robert C. Haag, Chief Construction Projects Branch 3 Division of Construction Projects Docket No. 50-391 Construction Permit No: CPPR-92
Enclosure:
As stated
October 26, 2011 Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
MEETING ANNOUNCEMENT - CATEGORY 1 PUBLIC MEETING WATTS BAR NUCLEAR UNIT 2, DOCKET NO.05-391
Dear Mr. Skaggs:
This letter confirms a Category 1 public meeting which has been scheduled for November 8, 2011, from 1:00p.m. - 3:00p.m. (EST). The enclosed meeting notice provides additional details. The purpose of the meeting is to discuss the status of the Watts Bar Unit 2 Construction Project, including major milestones and potential challenges that may impact the project schedule. The NRC will be available to ensure the publics issues and concerns are understood and considered.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4446.
Sincerely,
/RA/
Robert C. Haag, Chief Construction Projects Branch 3 Division of Construction Projects Docket No. 50-391 Construction Permit No: CPPR-92
Enclosure:
As stated O PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE O NON-SENSITIVE ADAMS: OYes ACCESSION NUMBER:___ML11299A016_________ OSUNSI REVIEW COMPLETE O FORM 665 ATTACHED OFFICE RII/DCP SIGNATURE DGamberoni For NAME C. Even DATE 10/26/2011 10/ /2011 10/ /2011 10/ /2011 10/ /2011 10/ /2011 10/ /2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\CCI\DCP\CPB3\WATTS BAR 2\PUBLICMT11_8_11.DOCX
TVA 2 cc w/encl:
Mr. Gordon P. Arent Mr. R. M. Krich Manager Vice President New Generation Licensing Nuclear Licensing Nuclear Generation Development Tennessee Valley Authority and Construction 3R Lookout Place WBN Nuclear Plant 1101 Market Street P.O. Box 2000 Chattanooga, Tennessee 37402-2801 Spring City, Tennessee 37381 Mr. E. J. Vigluicci Mr. David Stinson Assistant General Counsel Vice President Tennessee Valley Authority WBN Unit Two 6A West Tower WBN Nuclear Plant 400 West Summit Hill Drive Tennessee Valley Authority Knoxville, Tennessee 37402 P.O. Box 2000 Spring City, Tennessee 37381 Lawrence E. Nanney, Director Tennessee Department of Environmental Mr. Michael K. Brandon, Manager Health and Conservation Licensing and Industry Affairs Division of Radiological Health WBN Nuclear Plant 3rd Floor, L&C Annex Tennessee Valley Authority 401 Church Street P.O. Box 2000 Nashville, TN 37243-1532 Spring City, Tennessee 37381 Mr. D. E. Grissette Mr. Preston D. Swafford Site Vice President Chief Nuclear Officer WBN Nuclear Plant and Executive Vice President Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 3R Lookout Place Spring City, Tennessee 37381 1101 Market Place Chattanooga, Tennessee 37402-2801 County Mayor P.O. Box 156 County Executive Decatur, Tennessee 37322 375 Church Street Suite 215 Ms. Ann P. Harris Dayton, Tennessee 37321 341 Swing Loop Rockwood, TN 37854 Mr. Gregory A. Boerschig Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. M. J. Hellstern General Manager NGDC Governance & Oversight Tennessee Valley Authority 3A Blue Ridge Place 1101 Market Street Chattanooga, Tennessee 37402-2801
TVA 3 cc email distribution w/encl:
Greg Scott Tennessee Valley Authority Electronic Mail Distribution WB2 Licensing Tennessee Valley Authority Electronic Mail Distribution Brenda Derrick Electronic Mail Distribution
Letter to Michael D. Skaggs from Robert C. Haag dated October 26, 2011.
SUBJECT:
MEETING ANNOUNCEMENT - CATEGORY 1 PUBLIC MEETING NOTICE WATTS BAR NUCLEAR UNIT 2, DOCKET NO. 50-391 Distribution w/encl:
PMNS N. Sanfilippo, OEDO (RII OEDO Coordinator)
L. Raghavan, NRR S. Campbell, NRR P. Milano, NRR R. Hannah, RII J. Ledford, RII P. Holahan, RII J. Moorman, RII T. Reis, RII C. Ogle, RII R. Croteau, RII S. Shaeffer, RII R. Monk, RII (WBN Unit 1 SRI)
T. Nazario, RII (WBN Unit 2 SRI)
OE Mail (email address if applicable)
RA Secretaries PUBLIC
MEETING NOTICE
SUBJECT:
PUBLIC MEETING WATTS BAR NUCLEAR UNIT 2 FACILITY: Watts Bar Nuclear Plant Unit 2 Construction Project DOCKET: 50-391 DATE & TIME: Tuesday, November 8, 2011 1:00 p.m. - 3:00 p.m. (EST)
LOCATION: Comfort Inn, Meeting Room 2811 Decatur Pike Athens, TN 37303 PURPOSE: The purpose of the meeting is to discuss the status of the Watts Bar Unit 2 Construction Project, including major milestones and potential challenges that may impact the project schedule. The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002 applies to this meeting. The policy statement may be found on the NRC Website, www.nrc.gov . The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
CATEGORY: This is a Category 1 meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with NRC after the business portion of the meeting but before the meeting is adjourned.
NRC OFFICE(S) Region II PARTICIPATING:
PARTICIPANTS: NRC (partial list)
Patricia K. Holahan, Acting Deputy Regional Administrator for Construction (Acting), Region II J. Moorman, Director, Division of Construction Projects (DCP)
C. Ogle, Director, Division of Construction Inspection R. Haag, Chief, Construction Projects Branch 3, DCP S. Campbell, Chief, WB Special Projects Branch, NRR AUDIO TELE- Bridge line: 1-888-790-1785, pass code 36902#
CONFERENCING:
MEETING Robert C. Haag, NRC, RII CONTACT: (404) 997-4446 Robert.Haag@nrc.gov Enclosure