Enhancement to License Renewal Commitment for Buried Tanks Inspections
ML11297A117
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/12/2011
From: Mims D
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06424-DCM/GAM
Download: ML11297A117 (2)


Text

b*

LbA A subsidiary of Pinnacle West Capital Corporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Senior Vice President Tel. 623-393-5403 P. 0. Box 52034 Generating Station Nuclear Regulatory and Oversight Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-06424-DCM/GAM October 12, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Enhancement to License Renewal Commitment for Buried Tanks Inspections During the review of the PVNGS, Units 1, 2, and 3 license renewal application (LRA) by the U.S. Nuclear Regulatory Commission (NRC) staff, Arizona Public Service Company (APS) made commitments related to aging management programs to manage aging effects for structures, systems and components. Following the issuance of the PVNGS renewed operating licenses on April 21, 2011, the license renewal commitments were incorporated along with the LRA Updated Final Safety Analysis Report (UFSAR) supplement into a new Chapter 19 of the PVNGS UFSAR. The license renewal commitments are listed in UFSAR Table 19.5-1.

The purpose of this letter is to notify the NRC of an enhancement to the license renewal commitment for the inspection of buried tanks. Commitment No. 20 in UFSAR Table 19.5-1, License Renewal Commitments, and UFSAR 19.1.18, Buried Piping and Tanks Inspection, are enhanced to inclkde the following:

Upon entering the period of extended operation a planned inspection [of buried tanks] within ten years will be required unless an opportunistic inspection has occurred within this ten year period.

This enhancement will restore an inspection commitment that was inadvertently removed when the commitment was modified to include additional buried piping inspections in LRA Amendment No. 17 submitted to the NRC in APS letter no. 102-06205, dated June 21, 2010. This enhancement is consistent with the guidance in NUREG-1 801, Generic Aging Lessons Learned (GALL) Report, Revision 1, the revision in effect when the PVNGS LRA was reviewed by the NRC.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Enhancement to License Renewal Commitment for Buried Tanks Inspections Page 2 Should you need further information regarding this submittal, please contact Russell A.

Stroud, Licensing Section Leader, at (623) 393-5111.

Sincerely, DCM/RAS/GAM/