Category:License-Operator
MONTHYEARIR 05000445/20243012024-02-28028 February 2024 Notification of NRC Initial Operator Licensing Examination 05000445/2024301 and 05000446/2024301 ML23262A9942023-06-22022 June 2023 CP-2023-06 Public Forms ML23226A2342023-06-22022 June 2023 Post Exam Comments and Analysis with Letter CP-202200219, (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 20262022-05-18018 May 2022 (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026 ML21299A0252021-09-23023 September 2021 CP-2021-08-FINAL Outlines ML21299A0182021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test ML21299A0202021-09-23023 September 2021 CP-2021-08-DRAFT Outlines ML21299A0192021-09-23023 September 2021 2021-08-DRAFT Outline Comments ML21299A0242021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test ML21299A0222021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam ML21299A0212021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam Comments ML21299A0232021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test Outlines ML21299A0152021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outlines ML21299A0142021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outline Comments ML21299A0172021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test Comments ML21299A0162021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test ML21285A0372021-09-23023 September 2021 CP-2021-08-FINAL Operating Test ML21285A0392021-09-23023 September 2021 CP-2021-08-Post Exam Comments ML21299A0132021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Comments ML21285A0382021-09-23023 September 2021 CP-2021-08-FINAL Written Exam ML21299A0452021-09-23023 September 2021 CP-2021-08-Public Forms CP-202100570, (CPNPP) - Initial Operator Licensing Examination2021-08-24024 August 2021 (CPNPP) - Initial Operator Licensing Examination CP-202100559, (CPNPP) - Initial Operator Licensing Examination2021-08-17017 August 2021 (CPNPP) - Initial Operator Licensing Examination ML20174A6082020-05-21021 May 2020 05 Draft Written Examination ML20174A6092020-05-21021 May 2020 05 Final Outlines ML20174A6062020-05-21021 May 2020 05 Draft Outlines ML20174A6052020-05-21021 May 2020 05 Draft Outline Comments ML20174A6072020-05-21021 May 2020 05 Draft Written Examination Comments.Pdf ML20174A6102020-05-21021 May 2020 05 Final Written Examination ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18309A3502018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 IR 05000445/20183012018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 ML18157A0602018-06-0606 June 2018 NRC Initial Operator Licensing Examination Approval 05000445/2018301; 050000446/2018301 CP-201800217, Transmittal of NRC Form 536, Licensed Operator Examination Data2018-04-18018 April 2018 Transmittal of NRC Form 536, Licensed Operator Examination Data ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17179A3462017-06-19019 June 2017 2017-06-Post Examination Comments ML17198B2822017-06-19019 June 2017 2017-06-Public Forms ML17179A0052017-06-19019 June 2017 2017-06-DRAFT Outline Comments ML17179A0062017-06-19019 June 2017 2017-06-DRAFT Outlines ML17179A0072017-06-19019 June 2017 2017-06-DRAFT Written Exam Comments ML17179A0032017-06-19019 June 2017 2017-06-DRAFT Operating Test Comments ML17179A0082017-06-19019 June 2017 2017-06-DRAFT Written Exam ML17179A0102017-06-19019 June 2017 2017-06-FINAL Outlines ML17179A0112017-06-19019 June 2017 2017-06-FINAL Written Exam CP-201700402, Response to RIS 2017-032017-04-28028 April 2017 Response to RIS 2017-03 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16262A0362016-07-18018 July 2016 2016-07 Post-Exam Comments and Analysis ML16262A0382016-07-18018 July 2016 2016-07 Final Written Exams ML16262A0372016-07-18018 July 2016 2016-07 Final Operating Test 2024-02-28
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000445/20243012024-02-28028 February 2024 Notification of NRC Initial Operator Licensing Examination 05000445/2024301 and 05000446/2024301 ML23226A2342023-06-22022 June 2023 Post Exam Comments and Analysis with Letter ML23262A9942023-06-22022 June 2023 CP-2023-06 Public Forms CP-202200219, (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 20262022-05-18018 May 2022 (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026 ML21285A0372021-09-23023 September 2021 CP-2021-08-FINAL Operating Test ML21285A0382021-09-23023 September 2021 CP-2021-08-FINAL Written Exam ML21299A0212021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam Comments ML21299A0142021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outline Comments ML21299A0162021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test ML21299A0152021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outlines ML21299A0182021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test ML21299A0172021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test Comments ML21299A0202021-09-23023 September 2021 CP-2021-08-DRAFT Outlines ML21299A0192021-09-23023 September 2021 2021-08-DRAFT Outline Comments ML21299A0132021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Comments ML21299A0252021-09-23023 September 2021 CP-2021-08-FINAL Outlines ML21299A0452021-09-23023 September 2021 CP-2021-08-Public Forms ML21299A0232021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test Outlines ML21299A0222021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam ML21285A0392021-09-23023 September 2021 CP-2021-08-Post Exam Comments ML21299A0242021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test CP-202100570, (CPNPP) - Initial Operator Licensing Examination2021-08-24024 August 2021 (CPNPP) - Initial Operator Licensing Examination ML20174A6052020-05-21021 May 2020 05 Draft Outline Comments ML20174A6062020-05-21021 May 2020 05 Draft Outlines ML20174A6072020-05-21021 May 2020 05 Draft Written Examination Comments.Pdf ML20174A6082020-05-21021 May 2020 05 Draft Written Examination ML20174A6102020-05-21021 May 2020 05 Final Written Examination ML20174A6092020-05-21021 May 2020 05 Final Outlines ML18309A3502018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 IR 05000445/20183012018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 ML18157A0602018-06-0606 June 2018 NRC Initial Operator Licensing Examination Approval 05000445/2018301; 050000446/2018301 CP-201800217, Transmittal of NRC Form 536, Licensed Operator Examination Data2018-04-18018 April 2018 Transmittal of NRC Form 536, Licensed Operator Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17179A0082017-06-19019 June 2017 2017-06-DRAFT Written Exam ML17179A0062017-06-19019 June 2017 2017-06-DRAFT Outlines ML17179A0032017-06-19019 June 2017 2017-06-DRAFT Operating Test Comments ML17179A0052017-06-19019 June 2017 2017-06-DRAFT Outline Comments ML17179A0072017-06-19019 June 2017 2017-06-DRAFT Written Exam Comments ML17179A0102017-06-19019 June 2017 2017-06-FINAL Outlines ML17179A0112017-06-19019 June 2017 2017-06-FINAL Written Exam ML17198B2822017-06-19019 June 2017 2017-06-Public Forms ML17179A3462017-06-19019 June 2017 2017-06-Post Examination Comments CP-201700402, Response to RIS 2017-032017-04-28028 April 2017 Response to RIS 2017-03 ML16262A0382016-07-18018 July 2016 2016-07 Final Written Exams ML16262A0372016-07-18018 July 2016 2016-07 Final Operating Test ML16262A0362016-07-18018 July 2016 2016-07 Post-Exam Comments and Analysis ML16293A9752016-07-11011 July 2016 2016-07 Proposed OP Test Comments ML16293A9762016-07-11011 July 2016 2016-07 Final Outlines ML16293A9712016-07-11011 July 2016 2016-07 Proposed Outline Comments ML16293A9722016-07-11011 July 2016 2016-07 Proposed Written Exam 2024-02-28
[Table view] |
Text
CP-2011-06-DRAFT OPERATING TEST COMMENTS Admin JPM General Comments:
- Moved Time Critical check box to Testing Method area of JPM.
- Reworded Task Standard on Cover Page of all JPMs.
- Modified Validation Time as requested.
- Incorporated NRC comments as appropriate.
- Changed SRO references from PROVIDE to MAKE available where appropriate.
- 1. RA1 Modified acceptable values and calculations in body of JPM. Corrected Answer Key as required. Incorporated Admin JPM General Comments.
- 2. RA2 Changed Initiating Cues for temperatures and levels based on Operations feedback.
Corrected Answer Key as required. Incorporated Admin JPM General Comments.
- 3. RA3 Modified data for AFD. Moved data to Initial Conditions. Added Procedure Step 6.1 to body of JPM. Corrected Answer Key as required. Incorporated Admin JPM General Comments.
- 4. RA4 Added additional task to enhance discriminatory value. Incorporated Admin JPM General Comments.
- 5. SA1 Modified acceptable values and calculations in body of JPM Corrected Answer Key as required. Incorporated Admin JPM General Comments.
- 6. SA2 Removed 10CFR50 reference from oral and written Reporting Requirement answers.
Incorporated Admin JPM General Comments.
- 7. SA3 Modified data for AFD. Moved data to Initial Conditions. Added Procedure Step 6.1 to body of JPM. Corrected Answer Key as required. Incorporated Admin JPM General Comments.
- 8. SA4 Removed 10CFR20 reference from oral and written Reporting Requirement answers.
Incorporated Admin JPM General Comments.
- 9. SA5 Modified Initial Conditions to reflect current plant conditions. Incorporated Admin JPM General Comments.
CP-2011-06-DRAFT OPERATING TEST COMMENTS Plant/Simulator JPM General Comments:
- Moved Time Critical check box to Testing Method area of J.
- Reworded Task Standard on Cover Page of all JPMs.
- Modified Validation Time as requested.
- Added procedural NOTES and CAUTIONS as requested.
- Incorporated NRC comments as appropriate.
- 1. S-1 Changed Critical Steps as required. Incorporated Plant/Simulator JPM General Comments.
- 2. S-2 Modified Examiner Notes as requested. Submitted procedure enhancement for SOP-103A, Step 5.3.1.H. Incorporated Plant/Simulator JPM General Comments.
- 3. S-3 Removed reference to Alarm Response procedure and added a Reference Materials section to Cover Page. Added Step 3 from ALM-0053A as Perform Step 11. Incorporated Plant/Simulator JPM General Comments.
- 4. S-4 Modified Examiner Notes as requested. Changed Critical Steps as required. Incorporated Plant/Simulator JPM General Comments.
- 5. S-5 Added Examiner Note about sweeping potentiometer. Corrected Simulator Setup for condition of 1-PK-507 from AUTO to MANUAL. Incorporated Plant/Simulator JPM General Comments.
- 6. S-6 Added valves that were already in correct position as requested. Rearranged valves at end of JPM to follow how they appear in the Attachment. Incorporated Plant/Simulator JPM General Comments.
- 7. S-7 Added Examiner Note about synchroscope. Incorporated Plant/Simulator JPM General Comments.
- 8. S-8 Added procedure NOTES at Perform Steps 2 & 4. Modified Examiner Notes as requested.
Reformatted Perform Steps 4 & 5 to enhance ability of examiner to follow procedural actions. Incorporated Plant/Simulator JPM General Comments.
- 9. P-1 Modified Examiner Notes and Cues as requested. Added flashlight to Plant Setup. Changed Standard in Step 8 to reflect difference in required valve direction between Units 1 and 2.
Incorporated Plant/Simulator JPM General Comments.
- 10. P-2 Added procedure NOTE at Perform Step 1. Incorporated Plant/Simulator JPM General Comments.
- 11. P-3 Added flashlight and Leatherman to Plant Setup. Incorporated Plant/Simulator JPM General Comments.
CP-2011-06-DRAFT OPERATING TEST COMMENTS Simulator Scenario General Comments:
- Reworded Critical Task Statements to include procedure title on ES-D-1 and 2.
- Incorporated NRC comments as appropriate.
- Identified specific procedure steps performed throughout ES-D-2.
- Add NOTE and CAUTION statements from procedures into scenario where appropriate.
- Added Tech Spec Function(s) for instrument failures where appropriate.
- Added Examiner Notes where appropriate to facilitate procedures in use.
- 1. Scenario #1 (First Exam Scenario)
Changed Event #8 from RHR Pump trip to Safety Injection Pump trip.
Changed Event #6 from an instrument (I) to a component (C) failure and reworded description.
Added Booth Operator action to verify ASD speakers for Turbine Controls are adjusted prior to start of scenario.
Included boration volumes and flow rates where appropriate.
Incorporated Simulator Scenario General Comments.
- 2. Scenario #2 (Spare Exam Scenario)
Modified Critical Task statement for RCS leakage.
Added steps for a Manual Blended Makeup to Event #2.
Included boration volumes and flow rates where appropriate.
Added steps from Control Board Job Aid on placing Steam Dumps in Steam Pressure Mode.
Incorporated Simulator Scenario General Comments.
- 3. Scenario #3 (Second Exam Scenario)
Changed Critical Task for ATWT from manually tripping Reactor to inserting Control Rods at 48 steps/minute.
Changed Event #6 from an instrument (I) to a component (C) failure.
Added Procedure Enhancement opportunity for SG Channel Select Switches (called Control Switches in procedure).
Removed Remote Shutdown Panel instrument indications from Event #3.
Added Tech Spec LCO 3.3.3 as a Tracking LCO to Event.
Added PZR Spray Valve closure to scenario.
Incorporated Simulator Scenario General Comments.