ML11287A083

From kanterella
Jump to navigation Jump to search
Readiness for NRC Human Performance Corrective Action Inspection
ML11287A083
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/14/2011
From: Khadijah West
Division Reactor Projects III
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML11287A083 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 14, 2011 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT READINESS FOR NRC HUMAN PERFORMANCE CORRECTIVE ACTION INSPECTION

Dear Mr. Bezilla:

In our Perry Nuclear Power Plant (PNPP) Annual Assessment Letter, dated March 4, 2011, (ADAMS Accession Number ML110620306), we stated that, prior to the 2011 Middle-of-Cycle assessment, the NRC would conduct an inspection of the corrective actions you had completed to address the long-standing, human performance substantive cross-cutting issue at Perry Nuclear Power Plant. The inspection would use NRC Inspection Procedure 92702, Followup on Corrective Actions for Violations and Deviations, as guidance. In your letter of June 7, 2011, you indicated that PNPP was not prepared for the inspection, and requested that we perform the inspection later in calendar year 2011. We acknowledged your request on June 30, 2011, (ADAMS Accession Number ML111810868) and asked you to provide us by October 1, 2011, a statement of your readiness for that inspection. Our request was re-iterated in our Perry Nuclear Power Plant (PNPP) Middle-of-Cycle Assessment Letter, dated September 1, 2011, (ADAMS Accession Number ML112440084).

This letter acknowledges receipt of your September 30, 2011, letter, in which you confirm PNPP staffs readiness for our inspection of the effectiveness of corrective actions taken to address the long-standing human performance substantive cross-cutting issue at the PNPP.

Our present plan, which has been coordinated with members of your staff, is to conduct the onsite portion of the inspection during the week of December 5, 2011. We separately transmitted a request for documents to assist us in preparation for that inspection.

If there are any questions about this inspection, please contact John Giessner, Chief, Branch 4, Division of Reactor Projects, at 630-829-9619 or john.giessner@nrc.gov.

M. Bezilla In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ By Gary Shear Acting For/

Steven West, Director Division of Reactor Projects Docket No. 50-440 License No. NPF-58 cc: Distribution via ListServ

M. Bezilla In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ By Gary Shear Acting For/

Steven West, Director Division of Reactor Projects Docket No. 50-440 License No. NPF-58 cc: Distribution via ListServ DISTRIBUTION:

See next page DOCUMENT NAME: G:\\DRPIII\\Perry\\Perry Lette rOn Scheduled Follow-up Inspection Dec 2011.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME JRutkowski:dtp RLerch for JGiessner GShear for SWest DATE 10/12/11 10/13/11 10/14/11 OFFICIAL RECORD COPY

Letter to M. Bezilla from S. West dated October 14, 2011

SUBJECT:

PERRY NUCLEAR POWER PLANT READINESS FOR NRC HUMAN PERFORMANCE CORRECTIVE ACTION INSPECTION DISTRIBUTION:

Daniel Merzke RidsNrrPMPerry Resource RidsNrrDorlLpI3-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource