UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 30, 2011 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
SUBJECT:
PERRY NUCLEAR POWER PLANT READINESS FOR NRC HUMAN PERFORMANCE CORRECTIVE ACTION INSPECTION
Dear Mr. Bezilla:
In our Perry Nuclear Power Plant (PNPP) Annual Assessment Letter, dated March 4, 2011, (Adams Accession Number ML110620306), we stated that, prior to the 2011 mid-cycle assessment, the NRC would conduct an inspection of the corrective actions you had completed to address the long-standing, human performance substantive cross-cutting issue at Perry Nuclear Power Plant. The inspection would use NRC Inspection Procedure 92702, Followup on Corrective Actions for Violations and Deviations, as guidance. In your letter of June 7, 2011, you indicated that PNPP was not prepared for the inspection, and requested that we perform the inspection later in calendar year 2011. You stated that this would allow for additional assessment and corrective action activities, as well as provide more time to demonstrate sustained performance improvement in the human performance area.
This letter acknowledges receipt of your June 7, 2011, letter. Please advise us, in writing, no later than October 1, 2011, of your readiness for the NRC to inspect the effectiveness of your corrective actions. We will use the results of this inspection in our 2011 End of Cycle assessment, in part, to evaluate the effectiveness of your corrective actions to address the long-standing human performance substantive cross-cutting issue at PNPP.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Steven West, Director Division of Reactor Projects Docket No. 50-440 License No. NPF-58 cc: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 30, 2011 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
SUBJECT:
PERRY NUCLEAR POWER PLANT READINESS FOR NRC HUMAN PERFORMANCE CORRECTIVE ACTION INSPECTION
Dear Mr. Bezilla:
In our Perry Nuclear Power Plant (PNPP) Annual Assessment Letter, dated March 4, 2011, (Adams Accession Number ML110620306), we stated that, prior to the 2011 mid-cycle assessment, the NRC would conduct an inspection of the corrective actions you had completed to address the long-standing, human performance substantive cross-cutting issue at Perry Nuclear Power Plant. The inspection would use NRC Inspection Procedure 92702, Followup on Corrective Actions for Violations and Deviations, as guidance. In your letter of June 7, 2011, you indicated that PNPP was not prepared for the inspection, and requested that we perform the inspection later in calendar year 2011. You stated that this would allow for additional assessment and corrective action activities, as well as provide more time to demonstrate sustained performance improvement in the human performance area.
This letter acknowledges receipt of your June 7, 2011, letter. Please advise us, in writing, no later than October 1, 2011, of your readiness for the NRC to inspect the effectiveness of your corrective actions. We will use the results of this inspection in our 2011 End of Cycle assessment, in part, to evaluate the effectiveness of your corrective actions to address the long-standing human performance substantive cross-cutting issue at PNPP.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Steven West, Director Division of Reactor Projects Docket No. 50-440 License No. NPF-58cc: Distribution via ListServ See Previous Concurrences DOCUMENT NAME: G:\\DRPIII\\Perry\\Perry Letter On Scheduled Follow-up Inspection-HP.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JRutkowski:dtp*
MMarshfield*
JCameron*
SWest DATE 06/29/11 06/29/11 06/30/11 06/30/11 OFFICIAL RECORD COPY
Letter to M. Bezilla from S. West dated June 30, 2011.
SUBJECT:
PERRY NUCLEAR POWER PLANT READINESS FOR NRC HUMAN PERFORMANCE CORRECTIVE ACTION INSPECTION DISTRIBUTION:
Daniel Merzke RidsNrrPMPerry Resource RidsNrrDorlLpI3-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource