REGU(.q UNITED STATES

....0'1>.1.

NUCLEAR REGULATORY COMMISSION g

WASHINGTON, D.C. 20555-0001 s::

~

1;; if:

October 18, 2011

~

~

1-')

,..0 LICENSEE:

STP Nuclear Operating Company FACILITY:

South Texas Project, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 6, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE SOUTH TEXAS PROJECT, LICENSE RENEWAL APPLICATION (TAC NOS. ME4936 AND ME4937)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call on October 6, 2011, to discuss and clarify the staff's request for additional information (RAI) concerning the South Texas Project, Units 1 and 2 license renewal application. The purpose of the telephone conference call was to clarify the intent of the staff's RAls. provides a listing of the participants and Enclosure 2 contains the draft RAI, along with a summary of pertinent points of the call.

The applicant had an opportunity to comment on this summary.

John W. Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499

Enclosures:

As stated cc w/encls: Listserv

TELEPHONE CONFERENCE CALL STP NUCLEAR OPERATING COMPANY LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS OCTOBER 6, 2011 PARTICIPANTS:

AFFILIATIONS:

Arthur Cunanan U.S. Nuclear ReQulatorv Commission (NRC)

Jim Gavula NRC Arden AldridQe STP Nuclear OperatinQ Company I

  • Garv Warner Worlev Parsons AI Sauders Worlev Parsons Kenneth Brvant Callowav ENCLOSURE 1

REQUEST FOR ADDITIONAL INFORMATION STP NUCLEAR OPERATING COMPANY LICENSE RENEWAL APPLICATION DISCUSSED ON CONFERENCE CALL OCTOBER 6, 2011 Draft RAI 3.3.2.19-1 Flow-Accelerated Corrosion (018)

Background:

The standard review plan for review of license renewal (SRP-LR) states that the "Evaluation Findings" subsections present conclusions which include a determination as to whether the applicant has adequately identified the aging effects and the aging management program (AMP) credited with managing the aging effects. The Generic Aging Lessons Learned (GALL) Report states the conditions and operating experience at the plant must be bound by the conditions and operating experience for which the GALL Report program was evaluated. Otherwise, it is incumbent on the applicant to augment the GALL program as appropriate to address the additional aging effects.

The Flow-Accelerated Corrosion (FAC) Program is credited for managing aging due to wall thinning of various carbon steel components in license renewal application (LRA)

Tables 3.3.2-19, "Chemical and Volume Control," Table 3.3.2-22, "Liquid Waste Processing,"

and Table 3.4.2-2, "Auxiliary Steam System and Boilers," as well as several other tables.

Issue:

The implementing procedure for the FAC Program and the FAC Program Manual provides lists of systems that are susceptible to FAC; however, the lists in these documents do not include the three systems cited above. It is not clear whether the current FAC program, as implemented at the site, includes the components cited in the LRA.

In addition, the implementing procedure for the FAC Program, states that an erosion/corrosion program has been developed, which includes wall thinning of piping systems that are not included in the FAC Program, and addresses damage caused by cavitation, flashing and impingement. It is not clear whether there are components within the scope of license renewal, that are being managed for wall thinning by an erosion/corrosion program, which are not included in the FAC Program.

Request:

1) Provide information demonstrating that the current flow-accelerated corrosion program includes the associated components specified in LRA Tables 3.3.2-19, 3.3.2-22, and 3.4.2-2, or clarify which aging management program addresses wall thinning for these components.

ENCLOSURE 2

- 2

2)

If there are components within the scope of license renewal that are being managed for wall thinning by a separate erosion/corrosion program, provide details about this plant-specific program and clarify which components listed in the LRA are managed by this program.

Discussion:

The staff and the applicant discussed this Request for Additional Information. The applicant clarified its FAC Program and how it incorporates and manages its component within the FAC Program. The applicant understands the staff's concerns and will submit a response. The staff will issue the RAI.

October 18, 2011 LICENSEE:

STP Nuclear Operating Company FACILITY:

South Texas Project, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 6, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE SOUTH TEXAS PROJECT, LICENSE RENEWAL APPLICATION (TAC NOS. ME4936 AND ME4937)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call on October 6, 2011, to discuss and clarify the staff's request for additional information (RAI) concerning the South Texas Project, Units 1 and 2 license renewal application. The purpose of the telephone conference call was to clarify the intent of the staff's RAls. provides a listing of the participants and Enclosure 2 contains the draft RAI, along with a summary of pertinent points of the call.

The applicant had an opportunity to comment on this summary.

IRA Arthur Cunanan fori John W. Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499

Enclosures:

As stated cc w/encls: Listserv DISTRIBUTION:

See next page ADAMS Accession No.: ML11286A001

  • concurrence via e-mail OFFICE LA: DLRIRPB 1
  • PM: DLR/RPB1 BC: DLR/RPB1 PM: DLR/RPB1 NAME SFigueroa JDaily (ACunanan for)

DMorey JDaily (ACunanan for)

DATE 10/13/2011 10/13/2011 10/14/2011 10/18/2011 OFFICIAL RECORD COpy

Letter to STP Nuclear Operating Company from John W. Daily dated October 18, 2011

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 6, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE SOUTH TEXAS PROJECT, LICENSE RENEWAL APPLICATION (TAC NOS. ME4936 AND ME4937)

DISTRIBUTION:

HARD COPY:

DLR RtF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApfa Resource RidsOgcMailCenter JDaify TTran ICouret,OPA BSingal, DORL WWalker, RIV JDixon, RIV BTharakan, RIV WMaier, RIV VDricks, RIV NOKeefe, RIV AVegel, RIV GPick, RIV