MONTHYEARPNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report PNP 2022-012, Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition2022-04-21021 April 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition PNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-012, Report of Changes, Tests and Experiments, and Summary of Commitment Changes2021-10-0707 October 2021 Report of Changes, Tests and Experiments, and Summary of Commitment Changes PNP 2021-029, Pre-Notice of Disbursement from Decommissioning Trust2021-09-0202 September 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-013, Request for Rescission of Interim Compensatory Measure from Order EA-02-0262021-07-21021 July 2021 Request for Rescission of Interim Compensatory Measure from Order EA-02-026 PNP 2021-020, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122021-06-15015 June 2021 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 PNP 2021-005, License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition2021-06-0101 June 2021 License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition PNP 2021-026, Pre-Notice of Disbursement from Decommissioning Trust2021-05-27027 May 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-016, 2020 Radiological Environmental Operating Report2021-05-12012 May 2021 2020 Radiological Environmental Operating Report PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-015, and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report2021-04-21021 April 2021 and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2021-017, Schedule Change to Open Phase Condition Detection Implementation2021-04-0101 April 2021 Schedule Change to Open Phase Condition Detection Implementation PNP 2021-003, 2020 Steam Generator Tube Inspection Report2021-03-25025 March 2021 2020 Steam Generator Tube Inspection Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-004, Report - Changes to Palisades Nuclear Plant Technical Specifications Bases2021-03-10010 March 2021 Report - Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2021-006, Pre-Notice of Disbursement from Decommissioning Trust2021-03-0808 March 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-001, ASME Section XI 90-Day Owner'S Activity Report2021-01-12012 January 2021 ASME Section XI 90-Day Owner'S Activity Report 2023-09-28
[Table view] |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Anthony J Vitale Site Vice President PNP 2011-064 October 11 , 2011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Response to Request for Additional Information - License Amendment Request for Spent Fuel Pool Reqion I Criticality Palisades Nuclear Plant Docket 50-255 License No. DPR-20
References:
- 1. License Amendment Request for Spent Fuel Pool Region I Criticality, dated January 31, 2011 (ADAMS Accession No. ML110380093)
- 2. NRC e-mail, of August 25,2011, Palisades Nuclear Plant - LAR-ME5419 - SFP Region I Criticality - RAls - Revised - Non-Proprietary
Dear Sir or Madam:
Entergy Nuclear Operations, Inc. (ENO) submitted a license amendment request (Reference 1) to modify the Renewed Facility Operating License, Appendix A, Technical Specifications (TS), as they apply to the spent fuel pool (SFP) storage requirements in TS section 3.7.16 and criticality requirements for Region I SFP and north tilt pit fuel storage racks, in TS section 4.3. ENO received an electronic request for additional information (RAI) from the Nuclear Regulatory Commission (NRC) and held a conference call with the NRC, on August 24, 2011, to clarify the RAI. A final RAI was sent by electronic mail, on August 25,2011 (Reference 2)
Attached is the ENO response to the RAI.
A copy of this RAI response has been provided to the designated representative of the State of Michigan.
This letter contains no new or revised commitments.
PNP 2011-064 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on October 11 , 2011 .
Sincerely, ajv/jlk
Attachment:
- 1. RAI Response on Spent Fuel Pool Region I Criticality cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC State of Michigan
ATTACHMENT 1 RAI Response on Spent Fuel Pool Region I Criticality Request for additional information received by electronic mail August 25, 2011.
The following requests pertain to the License Amendment Request (LAR) Attachment 5, AREVA NP Inc. Technical Report Document No. ANP-2858P-003 Nuclear Regulatory Commission (NRC) Request
- 1. On page 19, the licensee mentions that the material for the cladding, instrument tube, and guide bars has changed. Clarify the material that the analysis assumes for all parts.
Entergy Nuclear Operations, Inc (ENO) Response
- 1. Yes, in the analysis, the cladding, instrument tube, and guide bars were all modeled as pure zirconium.
NRC Request
- 2. On page 28, the licensee mentioned several abnormal conditions. Please provide and justify any changes from the seismic analysis on record that may take place as a result of this license amendment.
ENO Response
- 2. The original 1978 analysis for the Region I spent fuel pool (SFP) storage racks, along with the subsequent 1986 analysis of the Region I racks for the Region II re-rack project, were both reviewed. The Region I racks were analyzed as berng fully loaded with fuel, which would result in the worst-case stresses from a seismic perspective. Racks with fewer fuel assemblies loaded into them (i.e. 3 of 4, or 2 of 4 fuel cell arrangements) would impart less loading and stresses into the rack, and are thus bounded by the existing analysis. Since the proposed LAR change allows for a potentially unsymmetrical pattern of fuel within the cells in a rack, there is the possibility that the cell loading within a rack can be unbalanced to some small degree. However, this loading pattern would still be bounded by the original analysis of a fully loaded rack.
Review of the SFP storage racks with consideration to displacement of the B4C (Carborundum@) determined that the buoyant weight of a storage can (fuel cell location within the rack) is still substantial, even without a fuel bundle present in that location. Additionally, the overall uplift force on the rack design is negligible considering the weight of the fuel assemblies.
Considering the loss of all Carborundum@, and the proposed loading arrangement of the SFP storage racks in Region I, the resultant effects of the proposed changes in the LAR are negligible, and are still bounded by the original Page 1 of 3
seismic analysis. Therefore, it is concluded that there is no revision needed with respect to the seismic analysis of the racks for this LAR.
NRC Request
- 3. On page 37, the licensee states that on[ly] rack C was evaluated for storage of non-fuel bearing components. Please justify only using rack C in this case.
ENO Response
- 3. In section 4.6, page 37, rack C was the only rack evaluated as it will be the only rack containing the non-fuel bearing components in designated empty locations.
With the exception of control blades, rack E will not contain non-fuel bearing components in designated empty locations. Therefore, only rack C was considered. This is not a change from the present Technical Specifications.
As described in Appendix C, section C.1.9, page 130, control blades were specifically analyzed for storage in rack E. Control blades will not physically fit in the smaller rack C cells, so the analysis for control blades was only performed for rack E.
NRC Request
- 4. On page 118, the swelling model was examined using fuel of several different configurations. Identify and justify the most limiting configurations?
ENO Response
- 4. This part of the analysis examined the effects of wall bowing, examining the movement of both the inner and outer walls of the rack cells. The walls have little room to move. The models chosen were those that moved the walls the maximum possible under the constraints of the rack and fuel geometry. The mass of the walls was conserved in all models.
Wall bowing was analyzed for both 3-of-4 and 4-of-4 (Le., full) loading patterns for both racks. Enrichments ranged from 1.35 to 4.54 wt% U-235. Burnup values ranged from fresh to 48 GWO/MTU. For each allowable loading pattern (2-of-4, 3-of-4, and 4-of-4 for rack C; 3-of-4 and 4-of-4 for rack E), the fuel configuration with the highest Keff was used for the examination of the swelling model. For rack C with 4-of-4 loading, the most reactive fuel configuration is 4.54 wt% at 48 GWO/MTU (see Table 4-7 or 4-8); likewise, for 3-of-4 loading, the most reactive fuel configuration is 4.54 wt% at 30 GWO/MTU (see Tables 4-4 or 4-5). For rack C with 2-of-4 loading, the fresh fuel with 4.54 wt% has a lower Keff than the 1.35 wt% fresh fuel in a 4-of-4 loading configuration (see Table 4-1 or Page 2 of 3
4-2 versus Table 4-7 or 4-8); therefore, the more limiting 4-of-4 configuration of fresh fuel was evaluated. The limiting rack E fuel configurations were also selected on the basis of the highest Keff values. For 3-of-4 loading, the most reactive fuel configuration is 4.54 wt% at 19 GWD/MTU (see Table 4-10 or 4-11) and for 4-of-4 loading, the most reactive fuel configuration is 4.54 wt% at 38 GWD/MTU (see Table 4-13 or 4-14). For rack E, the fresh fuel configurations were also evaluated for swelling effects even though they are significantly less reactive than the burned fuel configurations.
The results showed that no one form of wall bowing, or lack of bowing, is more reactive than another. This was evident in both racks C and E (see Tables C-2 and C-3). This would be expected since all cases use the same mass of wall material, and with no moderation in the gap region there is no impact to the flux in the fuel region due to the physical placement of the wall material. No evidence was seen of reflection changes, with the movement of the inner wall against the fuel. Since wall bowing was not found to create a reactivity impact at the extremes of possible movement, it can be considered that the analysis bounded other intermediate conditions. The nominal dimensions of the cells were used in the analysis since wall bowing was not found to be an issue.
Section C.1.3 explains that swelling effects were re-examined in combination with the effects of residual carbon (from degraded Carborundum@), again using the most reactive fuel configurations for 3-of-4 and 4-of-4 loading (the 2-of-4 loading is significantly less reactive and also showed a smaller reactivity increase than 3-of-4 loading for the residual carbon effect only, see Table C-4). Table C-5 lists the reactivity increases for residual carbon effects combined with extreme swelling and shows the maximum increase of 0.0028 Llk. Thus, the combined effects of residual carbon and extreme swelling were bounded by a reactivity penalty of 0.003 Llk for 2-of-4 and 3-of-4 loading only (Regions 1A and 1B); for 4-of-4 loading (Region 1C), the maximum combined effect was less than 0.001 Llk so the penalty was not considered necessary. The 0.003 Llk penalty for Regions 1A and 1B is included in the Llksys values shown in Table 3-5.
For rack E the swelling effects were also combined with residual carbon effects for the more reactive burned fuel configurations with both 3-of-4 and 4-of-4 loading (Regions 1 D and 1 E). These results are listed in Table C-7 and the maximum reactivity increase due to the combined effects of residual carbon and extreme swelling was determined to be 0.0022 Llk. This was bounded by a reactivity penalty of 0.003 Llk for both 3-of-4 and 4-of-4 loading configurations in Rack E. The 0.003 Llk penalty for Regions 1 D and 1 E is included in the Llksys values shown in Table 3-5.
Page 3 of 3