E-mail South Texas Project, Units 1 & 2 - Acceptance Review Email, Relief Request RR-ENG-3-04 to Apply Alternative to ASME Code Requirements for Class 1 & Class 2 Piping Welds, Third 10-Year Inservice Inspection Interval
ML112770338
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/04/2011
From: Balwant Singal
Plant Licensing Branch IV
To: Harrison A
South Texas
Singh A, 415-6899
References
TAC ME7055, TAC ME7056, RR-ENG-3-04
Download: ML112770338 (1)


Text

From: Singal, Balwant Sent: Tuesday, October 04, 2011 10:56 AM To: Harrison, Albon Cc: Walker, Philip

Subject:

Acceptance Review for Relief Request RR-ENG-3 TAC Nos ME7055 and ME7056 By letters dated September 1, 2011, STP Nuclear Operating Company (licensee) submitted Relief Request No RR-ENG-3-04 for South Texas Project, Units 1 and 2. The licensee requested for relief to apply an alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, requirements for examination of Class 1 and Class 2 piping welds. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-3016.

Balwant K. Singal Senior Project Manager (Comanche Peak and STP)