Letter Sequence RAI |
---|
TAC:ME6861, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (Approved, Closed) |
|
MONTHYEARNRC-11-0030, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2011-08-12012 August 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. Project stage: Request ML1125803922011-09-13013 September 2011 Request for Additional Information - Fermi 2 - LAR for Adoption of TSTF-501, Rev. 1, Relocated Stored Fuel Oil and Lube Oil Values to Licensee Control - ME6861 Project stage: RAI NRC-11-0046, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Adoption of TSTF-501, Revision 12011-10-20020 October 2011 Response to Request for Additional Information (RAI) Regarding License Amendment Request for Adoption of TSTF-501, Revision 1 Project stage: Response to RAI ML1135004332012-02-24024 February 2012 Issuance of Amendment 188 TSTF-50, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control Project stage: Approval ML12276A2362012-10-17017 October 2012 Correction Letter for Amendment TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control Project stage: Other 2011-09-13
[Table View] |
Similar Documents at Fermi |
---|
Category:E-Mail
MONTHYEARML23340A1322023-12-0606 December 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Audit Clarifications - EPID L-2023-LLA-0092 ML24011A2072023-11-17017 November 2023 Approval to Conduct NRC Appendix C Inspection Procedure 93100 at Fermi-2 ML23277A1332023-10-0303 October 2023 NRR E-mail Capture - ECCS Strainer Risk Informed Licensing Amendment - Audit Questions ML23276A0052023-10-0202 October 2023 NRR E-mail Capture - (External_Sender) Fermi EDG Crankcase Trip LAR RAI Response ML23250A2732023-09-0707 September 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.12 ML23244A0022023-08-30030 August 2023 NRR E-mail Capture - Fermi 2 - Acceptance of Relief Request RR-A25 for Extended License Period ML23241B0162023-08-24024 August 2023 Exigent License Amendment Request for Additional Information RAI-12 (EPID L-2023-LLA-0112) (Email) ML23235A1822023-08-23023 August 2023 Exigent LAR Request for Additional Information NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 NRC-23-0028, NRR E-mail Capture - (External Sender) Fermi Relief Request RR-A25 (NRC-23-0028)2023-08-0707 August 2023 NRR E-mail Capture - (External_Sender) Fermi Relief Request RR-A25 (NRC-23-0028) ML23199A2472023-07-14014 July 2023 Acceptance Review License Amendment Pertaining to ECCS Strainer Performance Evaluation ML23163A1742023-06-12012 June 2023 NRR E-mail Capture - Fermi 2 - Acceptance of Requested Licensing Action Regarding Amendment to Revise SR 3.8.1.2 in TS 3.8.1, AC Sources - Operating NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi ML23146A0622023-05-25025 May 2023 Acceptance of Requested Licensing Action Regarding Amendment to Correct Non-Conservative TS 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage ML23131A1912023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Fermi 2 LAR (EDG Crankcase Trip) - 6-Month Review ML23115A1452023-04-25025 April 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Changes to TS 3.8.1, AC Sources - Operating ML23076A0222023-03-14014 March 2023 Email SUNSI Action Related to Fermi Unit 1 Safety Hazards Summary Report (ML23066A135) ML23010A0962023-01-10010 January 2023 NRR E-mail Capture - Fermi 2 - Acceptance Review of the Requested Licensing Action Re License Amendment Request to Revise TS 3.8.1 ML22241A0622022-08-29029 August 2022 NRR E-mail Capture - Fermi 2: Acceptance Review of LAR Regarding Adoption of TSTF-582 ML22027A3612022-01-26026 January 2022 U1: CY2022 Inspection Plan, Docket No. 05000016, License No. DPR-9 ML21350A0482021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21266A4342021-09-20020 September 2021 Acceptance of DTE Request for Exemption from 10 CFR 72.44(d)(3) for Fermi 2 ML21214A1492021-08-0202 August 2021 License Amendment Request: Request for Additional Information ML21209A0132021-07-27027 July 2021 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 - Follow-Up to July 12, 2021 Email ML21194A0282021-07-12012 July 2021 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 - Continuance on Fall 2020 Emails ML21126A0532021-05-0404 May 2021 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Revised Relief Request RR A-39 ML21116A2572021-04-21021 April 2021 NRR E-mail Capture - Fermi 2 - Acceptance Review Licensing Amendment Request to Revise Technical Specifications ML21089A3962021-03-30030 March 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21084A1322021-03-19019 March 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21026A1372021-01-25025 January 2021 NRR E-mail Capture - Acceptance Review: Fermi 2 Revised Relief Request RR-A39 ML20329A3802020-11-23023 November 2020 NRR E-mail Capture - Fermi 2 (COVID-19) Part 73 Exemption Request ML20275A2962020-09-30030 September 2020 NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi 2 Nuclear Power Plant ML20289A1032020-09-29029 September 2020 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 ML20289A1052020-09-24024 September 2020 NRR E-mail Capture - Status Update on 2.206 Petition Regarding Fermi Unit 2 ML20261H9282020-08-14014 August 2020 NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendments to Technical Specifications for Fermi 2 Nuclear Power Plant ML20239A9682020-08-12012 August 2020 NRR E-mail Capture - Fermi 2 LAR: RAI for Revision to Technical Specifications to Change the Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20195A2762020-07-0909 July 2020 NRR E-mail Capture - Your Request for Extension of Part 26 Exemption Date - Documentation of Our Discussion on July 8, 2020 ML20181A4102020-06-29029 June 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Licensing Amendment Request to Adopt TSTF-563 ML20239A7962020-06-26026 June 2020 NRR E-mail Capture - Screening Result of 2.206 Petition Regarding Fermi Unit 2 ML20149K4242020-05-19019 May 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Relief Request RR-A42 ML20073E4222020-03-12012 March 2020 NRR E-mail Capture - Fermi 2: Relief Request VRR-004, Minor Clarifications to Ensure Consistency with the Specific Language in the ASME Code ML20029F0232020-01-29029 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Relief Requests (Proposed Alternatives), VRR-010 and VRR-011 for the Fourth 10-year IST Program ML20017A1782020-01-17017 January 2020 Relief Request #1 for Four RHR Valves (E1150F006A/B/C/D) ML20015A3012020-01-14014 January 2020 E-mail Fermi 1: CY2020 Master Inspection Plan ML20008D5752020-01-0808 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification for Secondary Containment Surveillance Requirements ML20008D1582020-01-0707 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification for Secondary Containment Surveillance Requirements ML19346F1192019-12-12012 December 2019 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML19346F1432019-12-12012 December 2019 NRR E-mail Capture - Fermi 2 - LAR Revise TS Regarding Steam Dome Pressure - Revised Estimate in the Hours to Complete the Amendment ML19304A2142019-10-30030 October 2019 NRR E-mail Capture - Acceptance Review: Fermi 2 Proposed Alternative VRR-004, Rev. 1, Relief to Confirm Obturator Position at Seat Leakage Testing Frequency 2023-09-07
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 ML23276A0052023-10-0202 October 2023 NRR E-mail Capture - (External_Sender) Fermi EDG Crankcase Trip LAR RAI Response ML23250A2732023-09-0707 September 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.12 ML23241B0162023-08-24024 August 2023 Exigent License Amendment Request for Additional Information RAI-12 (EPID L-2023-LLA-0112) (Email) ML23235A1822023-08-23023 August 2023 Exigent LAR Request for Additional Information ML23115A1452023-04-25025 April 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Changes to TS 3.8.1, AC Sources - Operating ML22362A0712022-12-28028 December 2022 Notification of NRC Fire Protection Team Inspection Request for Information Inspection Report Numbers 05000341/2023010 ML22130A5162022-05-12012 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML21214A1492021-08-0202 August 2021 License Amendment Request: Request for Additional Information ML21126A0532021-05-0404 May 2021 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Revised Relief Request RR A-39 ML21099A1012021-04-0909 April 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000341/2021013 ML21078A4832021-03-19019 March 2021 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000341/2021011 ML20303A2872020-10-29029 October 2020 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information: Inspection Report 05000341/2021012 ML20239A9682020-08-12012 August 2020 NRR E-mail Capture - Fermi 2 LAR: RAI for Revision to Technical Specifications to Change the Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20133K0502020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20079J0972020-03-19019 March 2020 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report Number 05000341/2020011 ML18206B0632018-07-25025 July 2018 NRR E-mail Capture - Draft Request for Additional Information Regarding Fermi LAR to Adopt TSTF -542 ML18129A3992018-05-0909 May 2018 NRR E-mail Capture - Request for Additional Information Regarding Fermi LAR to Adopt TSTF - 542 ML18065A3962018-03-0606 March 2018 NRR E-mail Capture - Request for Additional Information Regarding Fermi LAR to Adopt TSTF-542 ML18029A1262018-01-29029 January 2018 NRR E-mail Capture - Fermi 2 LAR to Revise TS to Eliminate MSLRM Reactor Trip and PCIS Group 1 Isolation Functions ML18022A9452018-01-22022 January 2018 NRR E-mail Capture - Fermi RAI for LAR Regarding TS to Eliminate Steam Line Radiation ML18022A1092018-01-19019 January 2018 NRR E-mail Capture - Request for Additional Information Regarding Fermi RR-A37 ML17346A8012017-12-12012 December 2017 NRR E-mail Capture - Final Fermi RAI for LAR Regarding Uhc (TS 3.7.2) ML17157B6702017-06-0505 June 2017 Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000341/2017012 ML17087A4572017-03-28028 March 2017 NRR E-mail Capture - RAI for Fermi 2 - LAR Regarding the Availability of HPCI and Rici at Low Pressure Conditions ML16357A1152016-12-22022 December 2016 Notification of NRC Baseline Inspection and Request for Information (Jvb) ML16188A1922016-07-0707 July 2016 Request for Additional Information on Severe Accident Mitigation Alternatives for Review of License Renewal Application Environmental Review ML16125A1742016-05-0303 May 2016 Request for Additional Information - Alternative Request PRR-007, Revision 1 ML16090A1032016-03-29029 March 2016 Ltr. 03/29/16 Fermi Power Plant - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000341/2016002 (Maj) ML16011A0442016-01-14014 January 2016 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 38 ML15237A0442015-09-0101 September 2015 Request for Additional Information for the Review of the Fermi, Unit 2, License Renewal Application-Set 37 ML15231A1612015-08-17017 August 2015 Ltr. 08/17/15 Fermi Power Plant - Notification of NRC Inspection and Request for Information (Txb) ML15149A3642015-05-28028 May 2015 Information Request to Support NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML15134A0722015-05-21021 May 2015 Request for Additional Information for the Review of the Fermi, Unit 2 License Renewal Application-Set 35 ML15139A4612015-05-20020 May 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application-Set 33 ML15132A4272015-05-18018 May 2015 March 27, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and DTE Electric Company Concerning Requests for Additional Information Pertaining to the Severe Accident Mitigation Alternatives Review of the Fermi, Unit 2 ML15126A0042015-05-15015 May 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application-Set 34 ML15114A3692015-05-0606 May 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML15099A0162015-04-22022 April 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application Set 32 ML15092A9452015-04-0909 April 2015 Request for Additional Information for the Environmental Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives ML15085A5132015-04-0202 April 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 31 ML15077A1082015-03-26026 March 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 27 ML15082A0462015-03-26026 March 2015 Requests for Additional Information for the Review of the Fermi, Unit 2 License Renewal Application - Set 29, ML15078A3372015-03-26026 March 2015 Request for Additional Information for the Review of the Fermi, Unit 2 License Renewal Application - Set 28 ML15072A0812015-03-19019 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 25 ML15051A4202015-03-13013 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 23 ML15062A3362015-03-13013 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 26 ML15051A3172015-03-11011 March 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 24 ML15027A3552015-02-11011 February 2015 Summary of Telephone Conference Call Between NRC and DTE Electric Company Concerning RAIs Pertaining to the Fermi, Unit 2 LRA SAMA Review ML15026A3072015-02-0303 February 2015 Requests for Additional Information for the Environmental Review of the Fermi 2 License Renewal Application-Severe Accident Mitigation Alternatives 2023-09-07
[Table view] |
Text
From: Chawla, Mahesh Sent: Tuesday, September 13, 2011 10:19 AM To: Alan I Hassoun Cc: Wolfgang, Robert; McMurtray, Anthony; Pascarelli, Robert; Lingam, Siva; Boyle, Patrick; Hopkins, Ogbonna; Mathew, Roy; Matharu, Gurcharan; Waig, Gerald; Elliott, Robert
Subject:
Request for Additional Information - Fermi 2 - LAR for Adoption of TSTF-501, Rev.1, "Relocated Stored Fuel Oil and Lube Oil Values to Licensee Control" -
ME6861 By letter dated August 12, 2011 (ADAMS Accession No. ML112270114), Detroit Edison Co.
submitted a license amendment request (LAR) for Fermi 2. The proposed LAR would revise TS 3.8.3, Diesel Fuel Oil an Starting Air, by relocating the current stored diesel fuel oil numerical requirements from the TS to the TS Bases so that it may be modified under licensee control. In order for the NRC staff to proceed with the review of the subject LAR, additional information has been requested. In order to maintain the schedule, the staff is requesting this information by October 14, 2011. Please arrange a teleconference if you wish to discuss this further with the staff.
Request for Additional Information (RAI)
DTE Energy Fermi 2 Docket No. 50-341 License Amendment Request for Adoption of TSTF-501, Revision 1 (TAC No. ME6861)
Reference:
Letter from Joseph H. Plona of DTE Energy to NRC, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control, dated August 12, 2011.
RAI CPTB-1:
Section 2.0 of your submittal states that the current reference at Fermi 2 is ANSI N-195 (no revision). Reference 3 in the Bases denotes ANSI N195-1976. Please confirm that Fermi 2 uses ANSI N195-1976 as the current reference.
RAI CPTB-2:
Section 5.1 of your submittal states that The specific volume of fuel oil equivalent to a 7 and 6 day supply is calculated using the NRC-approved methodology described in Regulatory Guide 1.137, Revision 1, Fuel-Oil Systems for Standby Diesel Generators and ANSI N195-1976, Fuel Oil Systems for Standby Diesel-Generators based on the diesel generator manufacturers consumption values including consideration of minimum required energy content. Reference 2
in the Bases denotes Regulatory Guide 1.137 without any revision. Please confirm that Fermi 2 uses Revision 1 of Regulatory Guide 1.137.
RAI CPTB-3:
Please provide the methodology of how you determine the direct energy content of the fuel oil.
Also provide the range of energy content that is acceptable and the energy content value that is used in your fuel oil volume calculation.
RAI CPTB-4:
Please state which calculation method in ANSI N195-1976 you use to calculate the fuel oil volumes, the time dependent method or the conservative alternative method. Please confirm that your calculation includes an explicit allowance for fuel consumption required by periodic testing. If you use the time dependent method, please confirm that the calculation includes a minimum margin of 10 percent.
RAI CPTB-5:
Please confirm that the energy content in a fuel shipment is determined before it is transferred to the fuel oil storage tank.
RAI CPTB-6:
Is Fermi 2 currently using Ultra Low Sulfur Diesel (ULSD) fuel?
RAI CPTB-7:
Are the fuel oil quantity values (storage tank and day tank) currently in the Technical Specifications (TSs) and the diesel generator manufacturers fuel consumption values based on ULSD fuel? If not, what type of fuel are they based on?
RAI CPTB-8:
Please confirm that the fuel oil quantity values (storage tank and day tank) and the diesel generator fuel consumption values are based on the EDGs operating at their upper TS frequency of 61.2 Hertz.
RAI CPTB-9:
Section 2.0 of your submittal states that Direct energy content measurement of the diesel fuel oil is used to verify compliance with the most limiting energy content assumed in the determination of the required fuel oil volume. However, Insert 2 to TS Surveillance Requirement (SR) 3.8.3.1 in the Bases states that Using the most limiting energy content as
verified by direct energy content measurement or the known correlation of diesel fuel absolute specific gravity or API gravity to energy content, the required diesel generator output, and the corresponding fuel consumption rate, the onsite fuel storage volume required for 7 days of operation can be determined. Also, TS SR 3.8.3.2 in the Bases discusses measuring the fuel oil absolute specific gravity or API gravity, but measuring direct energy content is not mentioned. Please discuss the discrepancy between Section 2.0 and what is written in TS SR 3.8.3.1 and SR 3.8.3.2 in the Bases and also discuss which method of determining fuel oil energy content at Fermi 2 will be used.
RAI CPTB-10:
Paragraph 6.1 of ANSI N-195-1976 states that Each diesel shall be equipped with day or integral tank or tanks whose capacity is sufficient to maintain at least 60 minutes of operation at the level where oil is automatically added to the day or integral tank or tanks. This capacity shall be based on fuel consumption at a load of 100% of the continuous rating of the diesel plus a minimum margin of 10%. Please confirm that your fuel oil calculation for the diesel generator day tanks complies with this requirement.
RAI ISTB-1:
Background:
Fermi 2 proposes the following TS SR 3.8.1.4:
TS SR 3.8.1.4: Verify each day tank contains one hour supply of fuel oil.
Fermi 2 provided the following regarding the corresponding change to the TS SR 3.8.1.4 Bases:
This SR provides verification that there is an adequate inventory of fuel oil in the day tank to support the EDG operation for one hour at full load. The volume of fuel oil equivalent to
[emphasis added] one hour supply is 210 gallons.
The current Fermi 2 TS SR 3.8.1.4 Bases states:
This SR provides verification that the level of fuel oil in the day tank is at or above the level at which fuel oil is automatically added. The level is expressed as an equivalent volume in gallons, and is selected to ensure adequate fuel oil for a minimum of
[emphasis added] 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of EDG operation at full load.
Question:
The proposed Fermi 2 TS SR 3.8.1.4 Bases is inconsistent with the proposed TS SR because the proposed Bases states the volume of fuel oil is equivalent to a one hour supply but the TS states > [greater than or equal to] a one hour supply . Please explain the reason for this
discrepancy and the difference with the minimum TS requirement from the current TS SR 3.8.1.4 Bases.