MONTHYEARML23340A1322023-12-0606 December 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Audit Clarifications - EPID L-2023-LLA-0092 ML24011A2072023-11-17017 November 2023 Approval to Conduct NRC Appendix C Inspection Procedure 93100 at Fermi-2 ML23277A1332023-10-0303 October 2023 NRR E-mail Capture - ECCS Strainer Risk Informed Licensing Amendment - Audit Questions ML23276A0052023-10-0202 October 2023 NRR E-mail Capture - (External_Sender) Fermi EDG Crankcase Trip LAR RAI Response ML23250A2732023-09-0707 September 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.12 ML23244A0022023-08-30030 August 2023 NRR E-mail Capture - Fermi 2 - Acceptance of Relief Request RR-A25 for Extended License Period ML23241B0162023-08-24024 August 2023 Exigent License Amendment Request for Additional Information RAI-12 (EPID L-2023-LLA-0112) (Email) ML23235A1822023-08-23023 August 2023 Exigent LAR Request for Additional Information NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 NRC-23-0028, NRR E-mail Capture - (External Sender) Fermi Relief Request RR-A25 (NRC-23-0028)2023-08-0707 August 2023 NRR E-mail Capture - (External_Sender) Fermi Relief Request RR-A25 (NRC-23-0028) ML23199A2472023-07-14014 July 2023 Acceptance Review License Amendment Pertaining to ECCS Strainer Performance Evaluation ML23163A1742023-06-12012 June 2023 NRR E-mail Capture - Fermi 2 - Acceptance of Requested Licensing Action Regarding Amendment to Revise SR 3.8.1.2 in TS 3.8.1, AC Sources - Operating NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi ML23146A0622023-05-25025 May 2023 Acceptance of Requested Licensing Action Regarding Amendment to Correct Non-Conservative TS 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage ML23131A1912023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Fermi 2 LAR (EDG Crankcase Trip) - 6-Month Review ML23115A1452023-04-25025 April 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Changes to TS 3.8.1, AC Sources - Operating ML23076A0222023-03-14014 March 2023 Email SUNSI Action Related to Fermi Unit 1 Safety Hazards Summary Report (ML23066A135) ML23010A0962023-01-10010 January 2023 NRR E-mail Capture - Fermi 2 - Acceptance Review of the Requested Licensing Action Re License Amendment Request to Revise TS 3.8.1 ML22241A0622022-08-29029 August 2022 NRR E-mail Capture - Fermi 2: Acceptance Review of LAR Regarding Adoption of TSTF-582 ML22027A3612022-01-26026 January 2022 U1: CY2022 Inspection Plan, Docket No. 05000016, License No. DPR-9 ML21350A0482021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21266A4342021-09-20020 September 2021 Acceptance of DTE Request for Exemption from 10 CFR 72.44(d)(3) for Fermi 2 ML21214A1492021-08-0202 August 2021 License Amendment Request: Request for Additional Information ML21209A0132021-07-27027 July 2021 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 - Follow-Up to July 12, 2021 Email ML21194A0282021-07-12012 July 2021 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 - Continuance on Fall 2020 Emails ML21126A0532021-05-0404 May 2021 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Revised Relief Request RR A-39 ML21116A2572021-04-21021 April 2021 NRR E-mail Capture - Fermi 2 - Acceptance Review Licensing Amendment Request to Revise Technical Specifications ML21089A3962021-03-30030 March 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21084A1322021-03-19019 March 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21026A1372021-01-25025 January 2021 NRR E-mail Capture - Acceptance Review: Fermi 2 Revised Relief Request RR-A39 ML20329A3802020-11-23023 November 2020 NRR E-mail Capture - Fermi 2 (COVID-19) Part 73 Exemption Request ML20275A2962020-09-30030 September 2020 NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi 2 Nuclear Power Plant ML20289A1032020-09-29029 September 2020 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 ML20289A1052020-09-24024 September 2020 NRR E-mail Capture - Status Update on 2.206 Petition Regarding Fermi Unit 2 ML20261H9282020-08-14014 August 2020 NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendments to Technical Specifications for Fermi 2 Nuclear Power Plant ML20239A9682020-08-12012 August 2020 NRR E-mail Capture - Fermi 2 LAR: RAI for Revision to Technical Specifications to Change the Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20195A2762020-07-0909 July 2020 NRR E-mail Capture - Your Request for Extension of Part 26 Exemption Date - Documentation of Our Discussion on July 8, 2020 ML20181A4102020-06-29029 June 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Licensing Amendment Request to Adopt TSTF-563 ML20239A7962020-06-26026 June 2020 NRR E-mail Capture - Screening Result of 2.206 Petition Regarding Fermi Unit 2 ML20149K4242020-05-19019 May 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Relief Request RR-A42 ML20073E4222020-03-12012 March 2020 NRR E-mail Capture - Fermi 2: Relief Request VRR-004, Minor Clarifications to Ensure Consistency with the Specific Language in the ASME Code ML20029F0232020-01-29029 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Relief Requests (Proposed Alternatives), VRR-010 and VRR-011 for the Fourth 10-year IST Program ML20017A1782020-01-17017 January 2020 Relief Request #1 for Four RHR Valves (E1150F006A/B/C/D) ML20015A3012020-01-14014 January 2020 E-mail Fermi 1: CY2020 Master Inspection Plan ML20008D5752020-01-0808 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification for Secondary Containment Surveillance Requirements ML20008D1582020-01-0707 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification for Secondary Containment Surveillance Requirements ML19346F1192019-12-12012 December 2019 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML19346F1432019-12-12012 December 2019 NRR E-mail Capture - Fermi 2 - LAR Revise TS Regarding Steam Dome Pressure - Revised Estimate in the Hours to Complete the Amendment ML19304A2142019-10-30030 October 2019 NRR E-mail Capture - Acceptance Review: Fermi 2 Proposed Alternative VRR-004, Rev. 1, Relief to Confirm Obturator Position at Seat Leakage Testing Frequency 2023-09-07
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 ML23276A0052023-10-0202 October 2023 NRR E-mail Capture - (External_Sender) Fermi EDG Crankcase Trip LAR RAI Response ML23250A2732023-09-0707 September 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.12 ML23241B0162023-08-24024 August 2023 Exigent License Amendment Request for Additional Information RAI-12 (EPID L-2023-LLA-0112) (Email) ML23235A1822023-08-23023 August 2023 Exigent LAR Request for Additional Information ML23115A1452023-04-25025 April 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Changes to TS 3.8.1, AC Sources - Operating ML22362A0712022-12-28028 December 2022 Notification of NRC Fire Protection Team Inspection Request for Information Inspection Report Numbers 05000341/2023010 ML22130A5162022-05-12012 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML21214A1492021-08-0202 August 2021 License Amendment Request: Request for Additional Information ML21126A0532021-05-0404 May 2021 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Revised Relief Request RR A-39 ML21099A1012021-04-0909 April 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000341/2021013 ML21078A4832021-03-19019 March 2021 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000341/2021011 ML20303A2872020-10-29029 October 2020 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information: Inspection Report 05000341/2021012 ML20239A9682020-08-12012 August 2020 NRR E-mail Capture - Fermi 2 LAR: RAI for Revision to Technical Specifications to Change the Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20133K0502020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20079J0972020-03-19019 March 2020 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report Number 05000341/2020011 ML18206B0632018-07-25025 July 2018 NRR E-mail Capture - Draft Request for Additional Information Regarding Fermi LAR to Adopt TSTF -542 ML18129A3992018-05-0909 May 2018 NRR E-mail Capture - Request for Additional Information Regarding Fermi LAR to Adopt TSTF - 542 ML18065A3962018-03-0606 March 2018 NRR E-mail Capture - Request for Additional Information Regarding Fermi LAR to Adopt TSTF-542 ML18029A1262018-01-29029 January 2018 NRR E-mail Capture - Fermi 2 LAR to Revise TS to Eliminate MSLRM Reactor Trip and PCIS Group 1 Isolation Functions ML18022A9452018-01-22022 January 2018 NRR E-mail Capture - Fermi RAI for LAR Regarding TS to Eliminate Steam Line Radiation ML18022A1092018-01-19019 January 2018 NRR E-mail Capture - Request for Additional Information Regarding Fermi RR-A37 ML17346A8012017-12-12012 December 2017 NRR E-mail Capture - Final Fermi RAI for LAR Regarding Uhc (TS 3.7.2) ML17157B6702017-06-0505 June 2017 Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000341/2017012 ML17087A4572017-03-28028 March 2017 NRR E-mail Capture - RAI for Fermi 2 - LAR Regarding the Availability of HPCI and Rici at Low Pressure Conditions ML16357A1152016-12-22022 December 2016 Notification of NRC Baseline Inspection and Request for Information (Jvb) ML16188A1922016-07-0707 July 2016 Request for Additional Information on Severe Accident Mitigation Alternatives for Review of License Renewal Application Environmental Review ML16125A1742016-05-0303 May 2016 Request for Additional Information - Alternative Request PRR-007, Revision 1 ML16090A1032016-03-29029 March 2016 Ltr. 03/29/16 Fermi Power Plant - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000341/2016002 (Maj) ML16011A0442016-01-14014 January 2016 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 38 ML15237A0442015-09-0101 September 2015 Request for Additional Information for the Review of the Fermi, Unit 2, License Renewal Application-Set 37 ML15231A1612015-08-17017 August 2015 Ltr. 08/17/15 Fermi Power Plant - Notification of NRC Inspection and Request for Information (Txb) ML15149A3642015-05-28028 May 2015 Information Request to Support NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML15134A0722015-05-21021 May 2015 Request for Additional Information for the Review of the Fermi, Unit 2 License Renewal Application-Set 35 ML15139A4612015-05-20020 May 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application-Set 33 ML15132A4272015-05-18018 May 2015 March 27, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and DTE Electric Company Concerning Requests for Additional Information Pertaining to the Severe Accident Mitigation Alternatives Review of the Fermi, Unit 2 ML15126A0042015-05-15015 May 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application-Set 34 ML15114A3692015-05-0606 May 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML15099A0162015-04-22022 April 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application Set 32 ML15092A9452015-04-0909 April 2015 Request for Additional Information for the Environmental Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives ML15085A5132015-04-0202 April 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 31 ML15077A1082015-03-26026 March 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 27 ML15082A0462015-03-26026 March 2015 Requests for Additional Information for the Review of the Fermi, Unit 2 License Renewal Application - Set 29, ML15078A3372015-03-26026 March 2015 Request for Additional Information for the Review of the Fermi, Unit 2 License Renewal Application - Set 28 ML15072A0812015-03-19019 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 25 ML15051A4202015-03-13013 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 23 ML15062A3362015-03-13013 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 26 ML15051A3172015-03-11011 March 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 24 ML15027A3552015-02-11011 February 2015 Summary of Telephone Conference Call Between NRC and DTE Electric Company Concerning RAIs Pertaining to the Fermi, Unit 2 LRA SAMA Review ML15026A3072015-02-0303 February 2015 Requests for Additional Information for the Environmental Review of the Fermi 2 License Renewal Application-Severe Accident Mitigation Alternatives 2023-09-07
[Table view] |
Text
From: Chawla, Mahesh Sent: Monday, September 12, 2011 5:12 PM To: Alan I Hassoun Cc: Cheruvenki, Ganesh; Mitchell, Matthew; Pascarelli, Robert; Lingam, Siva; Boyle, Patrick
Subject:
Request for Additional Information - Fermi 2 - Request for Relief - Use of BWRVIP Guidelines in Lieu of Specific ASME Code Requirements -
ME6765 By letter dated July 28, 2011 (ADAMS Accession No. ML112101480), Detroit Edison Company (the licensee) submitted above relief request for Fermi 2. In order to proceed with the review of this request, the NRC staff is requesting following additional information. Please arrange a teleconference with the NRC staff to discuss this information:
REQUEST FOR ADDITIONAL INFORMATION RELATED TO RELIEF REQUEST RR-A39 FERMI, UNIT 2 REACTOR VESSEL INTERNAL COMPONENTS DOCKET NOS. 50-341 By letter dated July 28, 2011, Detroit Edison (the licensee) submitted Relief Request RR-A-39 for Fermi, Unit 2. The licensee proposed to use Boiling Water Reactor Vessel and Internals Project (BWRVIP) guidelines as an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) for in-service inspection (ISI) of reactor vessel internal (RVI) components. The staff has reviewed the information the licensee provided that supports the proposed relief request and has the following questions:
(1) In a letter dated October 1, 2003, Entergy Nuclear Operations Inc. (Entergy), the licensee of Vermont Yankee Nuclear Power Station (VYNPS), submitted a similar relief request in which the licensee proposed to implement the BWRVIP guidelines in lieu of ASME Section XI requirements for the VYNPS=s RVI components. In a supplemental letter dated January 22, 2004, (ADAMS-Accession Number ML040690734), Entergy submitted details of the inspections for the RVI components that are consistent with the BWRVIP inspection guidelines. The staff, in its safety evaluation (SE) dated September 19, 2005, approved VYNPS=s relief request.
The staff requests that the licensee provide inspection requirements and inspection frequencies applicable for the third ISI interval for Fermi, Unit 2 similar to those addressed in VYNPS=s supplemental letter (ADAMS-Accession Number ML040690734).
(2) The staff requests that the licensee make a commitment that it will implement the requirements specified in the BWRVIP-94 report, AProgram Implementation Guidelines,@ for Fermi, Unit 2. Specifically, the BWRVIP-94 report states that where guidance in existing BWRVIP documents has been supplemented or revised by subsequent correspondence approved by the BWRVIP Executive Committee, the most current approved guidance will be implemented. A similar commitment was made by Entergy for VYNPS in its relief request dated October 1, 2003 (ADAMS-Accession Number ML032810440).
(3) The staff requests that the licensee identify whether there are any furnace-sensitized stainless steel vessel attachment welds associated with the RVI components in Fermi, Unit 2. It is requested that the licensee provide an explanation regarding the type of inspection program and any additional augmented inspection program that are implemented for any existing furnace-sensitized stainless steel attachment welds in Fermi, Unit 2.
(4) The staff requests that the licensee include the following BWRVIP reports in Section 5.0 of the submittal dated July 28, 2011.
BWRVIP-138, ABWRVIP Updated Jet Pump Beam Inspection and Flaw Evaluation.@
BWRVIP-139, BWR Vessel Internals Project, Steam Dryer Inspection and Flaw Evaluation Guidelines.
BWRVIP-183, BWR Vessel Internals Project, Top Guide Grid Beam Inspection and Flaw Evaluation Guidelines.
(5) The staff requests that the licensee confirm whether NUREG-0619, ABWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking,@ will be used for the inspection of feedwater sparger tee welds and feedwater sparger piping brackets. If not, provide alternative methods for inspecting these components.
(6) In Table 1 of Enclosure 1 of the submittal dated July 28, 2011, the licensee did not provide inspection criteria for the shroud support leg weld (H12) which requires inspection per the requirements specified in the staff=s SE for the BWRVIP-38 report, ABWR Vessel Internal Project, BWR Shroud Support Inspection and Flaw Evaluation Guidelines.@ However, the staff=s final SE for the BWRVIP-38 report (ML #003735498) indicates that when inspection tooling and methodologies are developed that allow the welds in the lower plenum to be accessible, the guidelines will state that the licensee will inspect these welds with the appropriate NDE methods in order to establish a baseline for these welds. Consistent with these requirements, the staff, therefore, requests that the licensee revise Table 1 of Enclosure 1 of the submittal dated July 28, 2011, to include a commitment that the shroud support leg weld H12 will be inspected when the inspection tooling and methodologies permit such an inspection.
(7) The staff requests that the licensee shall include a reference to BWRVIP-25, "BWR Core Plate Inspection and Flaw Evaluation Guidelines, in the row designated as ASME item B13.10 in Table 1 of Enclosure 1 of the submittal dated July 28, 2011.
(8) On pages 11 and 12 of Enclosure 3 of the submittal dated July 28, 2011, the licensee stated that per the BWRVIP analyses performed in 2003 and 2006, no inspections were performed on core plate rim bolts since refueling outage (RF08). With regard to this issue, the staff requests that the licensee provide a brief summary of the justification that was used for not performing the inspections and explain how the deviation was dispositioned for these bolts as required by BWRVIP Letter 2010-243. .
(9) According to Section 2.0 of BWRVIP-76, "BWR Core Shroud Inspection and Flaw Evaluation Guidelines, core shroud welds shall be inspected every 6 years when the enhanced visual test (EVT-1) method is used for one-sided weld inspections, and shall be inspected every 10 years when the subject welds are examined with the ultrasonic test (UT) method. The inspection frequency for the core shroud welds (H1 through H7) as indicated in Table 1 of Enclosure 1 of the submittal dated July 28, 2011, is not consistent with the aforementioned requirement.
Therefore, the staff requests that the licensee revise the inspection frequency requirement for the subject welds in Table 1 of Enclosure 1 of the July 28, 2011 submittal. Inspection criteria for H8 and H9 welds should be specified in Table 1 of Enclosure 1 of the submittal dated July 28, 2011.
(10) Identify the welds that were made with Alloy182 weld electrode in Fermi, Unit 2 RVI components. Since Alloy 182 welds are prone to intergranular stress corrosion cracking, the licensee is requested to provide the history of inspections and the results of these inspections of these welds, and subsequent examination criteria if cracking was found in these welds.