OL - TVA Letter to NRC_2011-09-01 - Sser Open Item 11 Response
ML11257A283
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/01/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11257A283 (6)


Text

WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]

Sent: Thursday, September 01, 2011 1:26 PM To: Epperson, Dan; Poole, Justin; Raghavan, Rags; Milano, Patrick; Campbell, Stephen Cc: Crouch, William D; Hamill, Carol L; Boyd, Desiree L

Subject:

TVA letter to NRC_2011-09 SSER Open Item 11 Response Attachments: 2011-09 SSER Open Item 11 Response_Final.pdf Please see attached TVA letter that was sent to the NRC today.

Thank You,

~*~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 512 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF229946E1)

Subject:

TVA letter to NRC_2011-09 SSER Open Item 11 Response Sent Date: 9/1/2011 1:25:44 PM Received Date: 9/1/2011 1:26:00 PM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:

"Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Hamill, Carol L" <clhamill@tva.gov>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 307 9/1/2011 1:26:00 PM 2011-09 SSER Open Item 11 Response_Final.pdf 724775 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

U.S. Nuclear Regulatory Commission Page 2 September 1, 2011 cc (Enclosure):

U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

U.S. Nuclear Regulatory Commission Page 3 September 1, 2011 bcc (Enclosure):

Stephen Campbell U.S. Nuclear Regulatory Commission MS 08H4A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Charles Casto, Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257

ENCLOSURE 1 Response to Action Item 11 From Appendix HH of NUREG-0847, Supplement 22 Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 The item number used below corresponds to the item numbers in SSER 22, Appendix HH.

SSER Open Item 11 The plant administrative procedures should clearly state that, when the Assistant Shift Engineer assumes his duties as Fire Brigade Leader, his control room duties are temporarily assumed by the Shift Supervisor (Shift Engineer), or by another SRO, if one is available. The plant administrative procedures should clearly describe this transfer of control room duties.

(Section 13.1.3)

TVA response:

TVA to NRC letter dated August 15, 2011, Watts Bar Nuclear Plant (WBN) Unit 2 - Transmittal of Revised Unit 1 / Unit 2 As-Designed Fire Protection Report (TAC No. ME3091), provided the latest version of the Unit 1 / Unit 2 As-Designed Fire Protection Report. 9.1 (Fire Brigade Staffing) of Part II of this document includes the following:

The fire brigade shall not include the Shift Manager or the other members of the minimum shift crew necessary for safe shutdown of the unit, nor any personnel required for other essential functions during a fire emergency.

Thus, there is no need to describe a transfer of control room duties as requested.

E1-1