08/25/2011 Issues #1
ML11257A039
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/25/2011
From: Horn K
Omaha Public Power District
To:
Office of Nuclear Reactor Regulation
References
Download: ML11257A039 (2)


Text

PASSPORT DOCUMENT To CHIEF PROJECT BRANCH E Facility FC Department : TRANSMITTAL Address USNRC CHIEF PROJECT BRANCH E From Address 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON TX 76011-8064 DOCCON FC-2-3 Attention: Doc Management Distribution lII Hl Page 1111M 1011 City Fort Calhoun State: Postal Code:

Country UNITED STATES Email Contact Kristi Horn 402-533-6714 6714 Date/Time 08/25/2011 08:11 Transmittal Group Id: 082511-1 Trans No. 000130521

Title:

08-25-11 ISSUE #1 Total Items: 00001 item Facility Type Sub Document Number Sheet Doc Status Revision Doc Date Copy # Media Cpys 0001 FC MANL TEC TECHNICAL SPECIFICATION CHANGE 266 16 P 01 If a document was not received or is no longer required check the response below and return to sender.

I Documents noted above not received (identify those not received).

I no longer require distribution of these documents (identify those no longer required).

Date: Signature:

ýýo-

(4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility.

3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

A. Maximum Power Level Omaha Public Power District is authorized to operate the Fort Calhoun Station, Unit 1, at steady state reactor core power levels not in excess of 1500 megawatts thermal (rate power).

B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 266, are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications.

C. Security and Safeguards Contingency Plans The Omaha Public Power District shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Fort Calhoun Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan," submitted by letter dated May 19, 2006.

OPPD shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The OPPD CSP was approved by License Amendment No. 266.

Renewed Operating License No. DPR-40 Amendment No. 266