Review of 30-Day Notification Report Regarding Changes to an Emergency Core Cooling System Evaluation Resulting in a Peak Cladding Temperature Difference in Excess of 50 Degrees Fahrenheit
ML112570232
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/20/2011
From: Peter Bamford
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear
Bamford, Peter J., NRR/DORL 415-2833
References
TAC ME4666
Download: ML112570232 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 September 20, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1-REVIEW OF 30-DAY NOTIFICATION REPORT REGARDING CHANGES TO AN EMERGENCY CORE COOLING SYSTEM EVALUATION RESULTING IN A PEAK CLADDING TEMPERATURE DIFFERENCE IN EXCESS OF 50 DEGREES FAHRENHEIT (TAC NO. ME4666)

Dear Mr. Pacilio:

By letter dated September 7,2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102500300), as supplemented by letter dated November 29, 2010 (ADAMS Accession No. ML103420099), Exelon Generation Company, LLC (Exelon, the licensee) reported an error correction discovered in the Emergency Core Cooling System (ECCS) evaluation model, or in the application of such a model, that affects the peak cladding temperature (PCT) calculation at Three Mile Island Nuclear Station, Unit 1 (TMI-1). The letter dated September 7, 2010, was submitted to satisfy the requirements of Title 10 of the Code of Federal Regulations (10 CFR), Paragraph 50.46(a)(3)(ii), which requires reporting of a calculated PCT change in excess of 50 degrees Fahrenheit (OF). The reported error was an estimated 225 of increase in PCT for a postulated small break loss-of-coolant-accident.

The intent of the 10 CFR 50.46(a)(3}(ii) reporting requirement is to enable the U.S. Nuclear Regulatory Commission (NRC) to determine the safety significance of errors and changes identified in ECCS evaluation models, and to take action if the staff determines that the ECCS evaluation models do not meet applicable regulatory requirements.

Based on the letter dated September 7,2010, the NRC staff was made aware of a significant error (i.e. greater than 50 OF) in the AREVA ECCS evaluation model that is applied to Babcock and Wilcox (B&W) nuclear steam supply systems (NSSSs), and is applicable to TMI-1. After accounting for the error, the corrected PCT for TMI-1 was calculated to be 1669 OF. This temperature is compared against the acceptance criterion specified at 10 CFR 50.46 (b}(1),

which requires the predicted PCT to remain below 2200 OF.

The letter dated September 7,2010, did not contain sufficient information to enable a determination of the safety significance of the error, as described above. Based on the NRC staffs concerns regarding the safety significance of the error and the adequacy of the overall evaluation model, a request for additional information was sent to the licensee.

The response, dated November 29, 2010, provided additional detail regarding the axial power shapes assumed in the acceptable evaluation model, and how the error impact was estimated using analyses that assumed a more limiting power shape. The error impact was estimated

M. Pacilio

- 2 using a conservative, first-principles based spreadsheet calculation, confirmed by explicit ECCS performance evaluation cases for a B&W-designed NSSS. The NRC's Office of Nuclear Regulatory Research performed confirmatory calculations, and the results were found to be consistent with the licensee's estimate of the error impact.

In summary, the NRC review of the September 7,2010, and November 29,2010, letters established the following:

1.

The error-adjusted PCTs at both plants remain considerably below the 10 CFR 50.46(b) acceptance criterion.

2.

The licensee provided additional information regarding the nature of the error impact evaluation, which indicated that the estimate of the errors magnitude was supported by explicit analyses.

3.

The licensee's evaluation is consistent with NRC staff confirmatory calculations.

Based on these considerations, the NRC staff has concluded that the error report is not indicative of an immediate, or significant, safety concern, and the overall evaluation model, when corrected for this error, appears to remain adequate. The NRC staff review also concludes that the licensee has appropriately submitted a 30-day report pursuant to 10 CFR 50.46(a)(3)(ii), and the analysis results are acceptable. Therefore, the NRC review of the 30-day report is complete, and TAC No. ME4666 will be closed.

Please contact me at 301-415-2833, if you have any questions.

Sincerely, f~~

Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 cc: Distribution via Listserv

M. Pacifio

-2 using a conservative, first-principles based spreadsheet calculation, confirmed by explicit ECCS performance evaluation cases for a B&W-designed NSSS. The NRC's Office of Nuclear Regulatory Research performed confirmatory calculations, and the results were found to be consistent with the licensee's estimate of the error impact.

In summary, the NRC review of the September 7,2010, and November 29,2010, letters established the following:

1.

The error-adjusted PCTs at both plants remain considerably below the 10 CFR S0.46{b) acceptance criterion.

2.

The licensee provided additional information regarding the nature of the error impact evaluation, which indicated that the estimate of the error's magnitude was supported by explicit analyses.

3.

The licensee's evaluation is consistent with NRC staff confirmatory calculations.

Based on these considerations, the NRC staff has concluded that the error report is not indicative of an immediate, or significant, safety concern, and the overall evaluation model, when corrected for this error, appears to remain adequate. The NRC staff review also concludes that the licensee has appropriately submitted a 30-day report pursuant to 10 CFR S0.46{a)(3)(ii), and the analysis results are acceptable. Therefore, the NRC review of the 30-day report is complete, and TAC No. ME4666 will be closed.

Please contact me at 301-41S-2833, if you have any questions.

Sincerely, Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. SO-289 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsOgcRp Resource LPLI-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrSrxb Resource AGuzzetta. NRR RidsRgn1 MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resouce RidsNrrPMThreeMilelsland Resource RidsNrrLAABaxter Resource BParks, NRR ADAMS Accession Number" ML112570232 OFFICE LPLI-21PM LPLI-21LA SRXB/BC LPL1-2/BC NAME PBamford ABaxter SUttle for AUlses SMiranda for HChemoff DATE 09119/2011 09/19/2011 09/20/2011 09/20/2011 OFFICIAL RECORD COpy