ML11256A291
ML11256A291 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 08/12/2010 |
From: | Richard Guzman Plant Licensing Branch 1 |
To: | Richard Chang NRC/RES/DSA/SPB |
References | |
FOIA/PA-2011-0083 | |
Download: ML11256A291 (2) | |
Similar Documents at Surry | |
---|---|
Category:E-Mail
MONTHYEARML24282A9732024-10-0808 October 2024
[Table view]Temporary SW Piping LAR Acceptance Email ML24116A2822024-04-25025 April 2024 Acceptance of Requested Licensing Action: Surry TS Change Section 3.8 Containment Temperature and Pressure Requirements and Surveillances ML24102A0682024-04-10010 April 2024 IST (z)(2) Hardship RR V-1 RCS Cold Leg, Lh Safety Injection Check Valves ML24075A1762024-03-15015 March 2024 Email, Acceptance of Requested Licensing Action: Surry TSTF-577, Rev. 1 ML24144A2432024-03-0808 March 2024 002 Radiation Safety Baseline Inspection Information Request ML24065A2532024-03-0505 March 2024 RAI Issuance Surry RR IST P-1 P-2 ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23312A2022023-11-0808 November 2023 Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps ML23312A2962023-11-0808 November 2023 Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps ML23283A3262023-10-10010 October 2023 Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi ML23255A2772023-09-12012 September 2023 Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22354A0352022-12-19019 December 2022 Acceptance Email TSC Relocations LAR ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML23058A1442022-12-0909 December 2022 Record of Surry Verbal Relief Request Authorization - V-01 Mechanical Agitation Vavle 1-SI-241 ML22342A1002022-12-0707 December 2022 Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22277A7252022-10-0303 October 2022 Additions to Turbine Bldg Wind Load Audit ML22256A3032022-09-13013 September 2022 Change in Completion Hours Estimate Amendment Turb Bldg. Loading Basis Change LAR ML22256A2312022-09-13013 September 2022 Acceptance Email TS Change for New Fuel Framatome Agora and SFP Criticality Review ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22224A1442022-08-11011 August 2022 Acceptance Email TS Change AFW Cross Connect AOT LAR ML22223A1182022-08-0404 August 2022 2022004 - Plant Surry RP Inspection - Document Request Letter E-mail ML22200A1032022-07-19019 July 2022 Acceptance of Requested Licensing Action: Surry Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML22193A0052022-07-11011 July 2022 Acceptance of Requested Licensing Action: Admin Changes to Technical Specifications ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22161B0052022-06-0909 June 2022 Acceptance Email TSTF 547 LAR ML22137A1622022-05-17017 May 2022 Acceptance of Requested Licensing Action Amendment Turb Bldg. Loading Basis Change License Amendment Request ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22077A0542022-03-18018 March 2022 Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21340A1642021-12-0606 December 2021 Acceptance of Requested Licensing Action Amendment ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21272A0622021-09-28028 September 2021 NRR E-mail Capture - (External_Sender) Surry Fuel Melt Safety Limit (SL) LAR Question ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21270A0232021-07-0707 July 2021 State of Virginia Notification of Pending Amendment Issuance Ref: Surry Power Station, Units 1 and 2 - Request to Revise Technical Specifications 2.1.A.1.b ML21144A2592021-05-0606 May 2021 003 Radiation Safety Baseline Inspection Information Request 2024-04-25 Category:Meeting Agenda MONTHYEARPMNS20241176, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses2024-09-23023 September 2024
[Table view]Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses PMNS20240863, Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 22024-06-27027 June 2024 Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 2 PMNS20240758, Notice of Meeting with Dominion Energy Inc. to Discuss Guidance in NUREG-0800 Standard Review Plan (SRP)2024-06-12012 June 2024 Notice of Meeting with Dominion Energy Inc. to Discuss Guidance in NUREG-0800 Standard Review Plan (SRP) PMNS20240556, Annual Assessment Meeting Surry Power Station Annual Assessment Meeting2024-04-18018 April 2024 Annual Assessment Meeting Surry Power Station Annual Assessment Meeting PMNS20231323, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-11-27027 November 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230615, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-05-11011 May 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230430, Assessment Meetingsurry Power Station Annual Assessment Meeting2023-04-13013 April 2023 Assessment Meetingsurry Power Station Annual Assessment Meeting ML22097A2262022-04-13013 April 2022 Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement PMNS20220349, Assessment Meetingsurry Power Station Annual Assessment Meeting2022-04-0404 April 2022 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220301, Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 22022-03-29029 March 2022 Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 2 PMNS20220318, Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station2022-03-29029 March 2022 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station PMNS20220113, Pre-submittal Meeting with Virginia Electric Power Company (VEPCO) to Discuss Future License Amendment for Surry Power Station, Units 1 and 22022-02-11011 February 2022 Pre-submittal Meeting with Virginia Electric Power Company (VEPCO) to Discuss Future License Amendment for Surry Power Station, Units 1 and 2 PMNS20210540, Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Revise the New and Spent Fuel Pool Criticality Analyses for Surry Power Station, Units 1 and 22021-05-11011 May 2021 Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Revise the New and Spent Fuel Pool Criticality Analyses for Surry Power Station, Units 1 and 2 PMNS20210612, Pre-Submittal Meeting - Proposed License Amendment (LAR) Request to Revise the Licensing Basis for the Turbine Building and the Fuel Building Trolley Support Structures Relative to Tornado Effects for Surry Power Station, Units 1 and 22021-05-10010 May 2021 Pre-Submittal Meeting - Proposed License Amendment (LAR) Request to Revise the Licensing Basis for the Turbine Building and the Fuel Building Trolley Support Structures Relative to Tornado Effects for Surry Power Station, Units 1 and 2 PMNS20210382, the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 20202021-04-12012 April 2021 the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 2020 PMNS20201174, Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc)2020-10-0101 October 2020 Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc) PMNS20201170, Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc)2020-09-30030 September 2020 Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc) ML18121A0342018-03-29029 March 2018 Possible Topics for the April 17, 2018 Public Meeting with Dominion on Its Surry SLRA ML14076A1112014-03-17017 March 2014 Notice of Public Meeting to Provide an Open Forum to Discuss the Annual Assessment of Surry Power, Units 1 and 2 ML14066A1252014-03-0707 March 2014 March 18, 2014, Notice of Category 3 Public Meeting/Open House Regarding Surry, Units 1 & 2, Annual Assessment ML14065A4942014-03-0606 March 2014 Notice of Category 3 Public Meeting/Open House with Virginia Electric and Power Company to Discuss Surry Power Station Units 1 and 2 Annual Assessment ML14065A5302014-03-0606 March 2014 Notice of Category 3 Public Meeting/Open House with Virginia Electric and Power Company to Discuss Surry Power Station Units 1 and 2 Annual Assessment ML11256A2912010-08-12012 August 2010 Email from R. Guzman, NRR/DORL/LPL1-1 to R. Chang, Res/Dsa/Spb, Soarca Weekly Team Meeting ML0931002542009-11-0909 November 2009 Notice of Conference Call with Virginia Electric and Power Company to Discuss Issues Relating to Surry Power Station ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0726900152007-09-26026 September 2007 Notice of Forthcoming Meeting with Dominion Nuclear to Discuss Proposed Chemical Testing Methods Related to GSI-191, Assessment of Debris Accumulation on PWR Sump Performance, as Proposed by Its Vendor ML0632605122006-11-22022 November 2006 Forthcoming Meeting with Virginia Electric and Power Company. Regarding Main Control Room and Emergency Switchgear Room for Surry Nuclear Station Units 1 and 2 ML0626203902006-09-19019 September 2006 Notice of Meeting with Virginia Electric Power Company (VEPCO) to Discuss Organizational Changes at VEPCO, Etc ML0525606282005-09-13013 September 2005 Notice of Category 1 Meeting W/ VEPCO Surry and ISFSI Related Criticality Analysis Between Part 50 and 72 ML0513100022005-05-10010 May 2005 Notice of Meeting Regarding the plant-specific Implementation of VIPRE-D Topical Report for Dominion, VEPCO, (Surry, North Anna & Millstone) ML0420301852004-07-21021 July 2004 Notice of Meeting with Virginia Electric & Power Company (VEPCO) to Discuss Vepco'S Proposed plant-specific Topical Report That Implements VIPRE-D Code ML0411806032004-04-21021 April 2004 Meeting Summary with Virginia Electric and Power Company to Discuss Risk Significance of Concerns Associated with NRC Response to Potential Fire in Emergency Switchgear ML0325500192003-09-12012 September 2003 Notice of Meeting with Dominion Regarding Proposed Consolidation of the Quality Assurance Programs for Surry, Units 1 and 2, North Anna, Units 1 and 2, Millstone, Units 2 and 3, Nuclear Plants ML0305902342003-02-28028 February 2003 Forthcoming Meeting with Virginia Electric Power Co. to Discuss Control Room Habitability Testing ML0205303982002-01-0808 January 2002 Attachment to the 01/08/2002 Mtg with NEI, Southern Nuclear Operating Company (Snc), Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), and Exelon Generation Company (Exelon) 2024-09-23 |
Text
From: Guzman, Richard To: Chana. Richard
Subject:
RE: SOARCA Weekly Team Meeting Date: Wednesday, November 17, 2010 3:48:00 PM Richard - I see on your agenda that the NRR Briefing is scheduled for 12/15. Is this a firm date or still tentative? I plan to be doing an audit the early part of that week up at Pilgrim, so I'll have to catch up wlyou later on take-aways and outcomes from the briefing.
Thanks, Rich From: Chang, Richard Sent: Wednesday, November 17, 2010 3:37 PM To: Barr, Jonathan; Navarro, Carlos; Nosek, Andrew; Ake, ]on; Guzman, Richard; Pires, Jose; Ali, Syed; Sullivan, Randy; Dube, Donald; Yerokun, Jimi; Schaperow, Jason; Burnell, Scott; Stutzke, Martin; Tinkler, Charles; Vail, James; Candra, Hernando Cc: Santiago, Patricia
Subject:
RE: SOARCA Weekly Team Meeting All, Here is the information for tomorrow's team meeting. Please let me know if I need to add/modify anything.
Location: Church St. 3C19 Time: 2-3pm Phone: 888-950-7565 Passcode:
Agenda: 1) SOARCA NUREG rev3 - made available to agency in nonpublic ADAMS: ML1Q03010444
- 2) SOARCA updated website now live:
http://www.nrc.gov/about-nrc/regulatory/research/soar.html
- 3) Regional briefings:
- a. Canceled, per Jennifer. A webinar will be held instead. Date TBD
- 4) Schedule
- a. Staff comments (320 unresolved in Appendices A & B)
- b. Surry Fact Check response received ihi Pds moft was d~ If aootdnc wlth1he Freedom of ,n*mXdOS*A FOWPA 2./, 006 *
- c. Sandia estimates most Appendix A issues will be addressed by late December.
- d. Updated direction from Jennifer
- 5) Updates on uncertainty analysis
- a. ACRS meeting postponed
- 6) Other Briefings
- a. RIC
- b. DEDO briefing 11/29
- c. NRR management briefing 12/15
- 7) Other
- Thanks, Richard Chang Program Manager RES/DSA/SPB 301-251-7980