ML11255A005

From kanterella
Jump to navigation Jump to search
Change to Nine Mile Point Nuclear Station Physical Security, Safeguards Contingency, and Security Training and Qualification Plan
ML11255A005
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 09/08/2011
From: Verno A
Constellation Energy Group, EDF Group, Nine Mile Point
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11255A005 (2)


Text

SAFEGUARDS INFORMATION CENGOs a joint venture of A

Constellation 6' eDF Energy

,D NINE MILE POINT NUCLEAR STATION P.O. Box 63 Lycoming, NY 13093 September 8, 2011 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:

SUBJECT:

Document Control Desk Nine Mile Point Nuclear Station Unit Nos. 1 & 2; Docket Nos. 50-220 & 50-410 Change to Nine Mile Point Nuclear Station Physical Security, Safeguards Contingency, and Security Training and Qualification Plan Pursuant to the requirements of 10 CFR 50.54(p), attached are changed pages for Issue 7, Revision 2, of the Nine Mile Point Nuclear Station Physical Security, Safeguards Contingency, and Security Training and Qualification Plan (the Plan). A detailed summary of change is provided in Attachment 1, and the revised pages are provided in Attachment 2. Both attachments are classified as Safeguards Information.

This revision of the Plan entails only one change, which involves an increase in the number of committed armed responders. Nine Mile Point Nuclear Station, LLC (NMPNS) has reviewed the change and determined that it does not decrease the effectiveness of the Plan or the overall Nuclear Security Program.

Should you have any questions regarding the information in this submittal, please contact John J. Dosa, Director Licensing at (315) 349-5219.

Very truly yours, Anthony Verno Director Security NOTE: THE ATTACHMENTS TO THIS LETTER CONTAIN SAFEGUARDS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON THEIR REMOVAL, THIS LETTER MAY BE DECONTROLLED.

SAFEGUARDS INFORMATION

ý5CDý 0 hL

Document Control Desk September 8, 2011 Page 2 AV/MHS Attachments:

(1) Summary of Change for Issue 7, Revision 2, of the NMPNS Physical Security, Safeguards Contingency, and Security Training and Qualification Plan (2) Changed Pages for Issue 7, Revision 2, of the NMPNS Physical Security, Safeguards Contingency, and Security Training and Qualification Plan cc:

NRC Regional Administrator, Region I NRC Project Manager (Without Attachments 1 and 2)

NRC Resident Inspector (Without Attachments 1 and 2)