ML112490143

From kanterella
Jump to navigation Jump to search
Midcycle Security Performance Review and Inspection Plan - Fort Calhoun Station
ML112490143
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/01/2011
From: Anton Vegel
Division of Reactor Safety IV
To: Bannister D
Omaha Public Power District
References
Download: ML112490143 (3)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION September 1, 2011 David J. Bannister, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

MIDCYCLE SECURITY PERFORMANCE REVIEW AND INSPECTION PLAN -

FORT CALHOUN STATION

Dear Mr. Bannister:

On August 18, 2011, the NRC staff completed its performance review of Fort Calhoun Station for the first half of the calendar year 2011 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your security performance during this period and our plans for future security inspections at your facility.

Security performance for the most recent quarter at Fort Calhoun Station was within the Regulatory Response column of the NRCs security action matrix based on one White finding identified in the 1st quarter of 2011. Additionally, the NRC plans to perform a Special Inspection at your facility the week of September 26, 2011, to follow up on a separate security-related issue.

The enclosed inspection plan lists the security inspections scheduled through December 31, 2012. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive onsite. The inspections in the last 9 months of the inspection plan are tentative and the plan may be revised at the end-of-cycle review. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.

UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Omaha Public Power District OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION If we change the inspection plan, we will contact you to discuss the change as soon as possible.

Please contact Michael Hay at (817) 276-6527 with any questions you may have regarding this letter or the inspection plan.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus, due to the security-related information contained in this correspondence and in accordance with NRC Policy for Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Sincerely,

/RA/

Anton Vegel, Director Division of Reactor Safety Docket: 50-285 License: DPR-40

Enclosure:

Fort Calhoun Station Security Inspection Plan cc w/o enclosure:

Jeffrey A. Reinhart Site Vice President Omaha Public Power District Fort Calhoun Station FC-2-4 Adm P.O. Box 550 Fort Calhoun, NE 68023-0550 Ms. Susan E. Baughn Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm P.O. Box 550 Fort Calhoun, NE 68023-0550

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Omaha Public Power District OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Distribution w/enclosure:

Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov)

Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov)

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)

Senior Resident Inspector (John.Kirkland@nrc.gov)

Distribution w/o enclosure:

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Jeff.Clark@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Tom.Blount@nrc.gov)

Resident Inspector (Jacob.Wingebach@nrc.gov)

Acting Branch Chief, DRP/E (James.Drake@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Project Engineer (Jim.Melfi@nrc.gov)

Project Engineer (Chris.Smith@nrc.gov)

FCS Administrative Assistant (Berni.Madison@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

Project Manager (Lynnea.Wilkins@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource ROPreports RIV/ETA: OEDO (John.McHale@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

Security Related Complete Letter - OUO:

SUNSI Review Completed: ___Y___

ADAMS: 7 Yes Initials: __MCH____

7 Non-Publicly Available 7 Sensitive C:PSB1 C:PBE D:DRP D:DRS MHay JDrake KKennedy AVegel

/RA/

/RA/

/RA/

/RA/

8/26/11 8/26/11 8/29/11 8/31/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax