Safety Evaluation Report Supplement 22 - Response to NRC Required Action Item 11
ML112440576
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/01/2011
From: Stinson D
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NUREG-0847, S22
Download: ML112440576 (3)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 September 1, 2011 10 CFR 50.4(b)(6) 10 CFR 50.34(b)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391

Subject:

Watts Bar Nuclear Plant (WBN) Unit 2 - Safety Evaluation Report Supplement 22 (SSER22) - Response to NRC Required Action Item 11 Appendix HH of NUREG-0847, Supplement 22, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2," contains 51 "required action items associated of all open items, confirmatory issues, and proposed license conditions that the staff has identified."

Enclosure 1 contains the response to Action Item 11.

There are no new commitments in this letter.

If you have any questions, please contact Bill Crouch at (423) 365-2004.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1§! day of September, 2011.

Respectfully,

~~~~c:::::=-_

David Stinson Watts Bar Unit 2 Vice President

Enclosure:

1. Response to Action Item 11 From Appendix HH of NUREG-0847, Supplement 22

U.S. Nuclear Regulatory Commission Page 2 September 1, 2011 cc (Enclosure):

U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

ENCLOSURE 1 Response to Action Item 11 From Appendix HH of NUREG-0847, Supplement 22 Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 The item number used below corresponds to the item numbers in SSER 22, Appendix HH.

SSER Open Item 11 The plant administrative procedures should clearly state that, when the Assistant Shift Engineer assumes his duties as Fire Brigade Leader, his control room duties are temporarily assumed by the Shift Supervisor (Shift Engineer), or by another SRO, if one is available. The plant administrative procedures should clearly describe this transfer of control room duties.

(Section 13.1.3)

TVA response:

TVA to NRC letter dated August 15, 2011, Watts Bar Nuclear Plant (WBN) Unit 2 - Transmittal of Revised Unit 1 / Unit 2 As-Designed Fire Protection Report (TAC No. ME3091), provided the latest version of the Unit 1 / Unit 2 As-Designed Fire Protection Report. 9.1 (Fire Brigade Staffing) of Part II of this document includes the following:

The fire brigade shall not include the Shift Manager or the other members of the minimum shift crew necessary for safe shutdown of the unit, nor any personnel required for other essential functions during a fire emergency.

Thus, there is no need to describe a transfer of control room duties as requested.