ML11243A228

From kanterella
Jump to navigation Jump to search
Hearing File Transmittal Letter - Supplement 31
ML11243A228
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/31/2011
From: Harris B
NRC/OGC
To: Lathrop K, Lawrence Mcdade, Richard Wardwell
Atomic Safety and Licensing Board Panel
References
50-247-LR, 50-286-LR, RAS E-582
Download: ML11243A228 (17)


Text

RfGV(

UNITED STATES

'1~

NUCLEAR REGULATORY COMMISSION 0."....

(">

WASHINGTON, D.C. 20555-0001 o

~

~~

~O'

        • ~

August 31, 2011 OFFICE OF THE GENERAL COUNSEL Administrative Judge Administrative Judge Lawrence G. McDade, Chair Dr. Richard E. Wardwell Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Dr. Kaye D. Lathrop 190 Cedar Lane East Ridgeway, CO 81432 I n the Matter of ENTERGY NUCLEAR OPERATIONS, INC.

(Indian Point Nuclear Generating Station Units 2 and 3)

Docket Nos. 50-247-LR and 50-286-LR

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Board's December 18,2008, "Memorandum and Order (Addressing Requests that the Proceeding be Conducted Pursuant to Subpart G)," slip op. at 13, and the Licensing Board's "Order (Granting Consent Motion Regarding Mandatory Disclosures)," dated January 30, 2009, at 1, the staff of the U.S. Nuclear Regulatory Commission ("Staff") herein notifies the Licensing Board and the parties that the hearing file has been supplemented for this proceeding. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System ("ADAMS"). An index containing the ADAMS accession number, date, and title or description of each item in Hearing File Index, Supplement 31 is appended hereto as Attachment 1 On or about September 9, 2011, the newly identified documents in the hearing file will be made available via the Electronic Hearing Docket ("EHD"), which may be accessed at the following URL: http://ehd.nrc.gov/EHD Proceeding/home. asp. The hearing file will be contained in a sub folder entitled, "Indian PT Hearing File, Supplement 31" in the "lndian_PT_2&3_50-247&50-286 LR" folder of the EHD.

In addition, as required by 10 C.F.R. § 2.336(b)(5), the Staff is producing a privilege log, identifying documents withheld under the deliberative process privilege, which is appended hereto as Attachment 2. Also attached is the Declaration of Brian E. Holian formally invoking the deliberative process privilege with respect to the documents in Attachment 2. The Staff will preserve and maintain the privileged documents identified in the log during the pendency of this proceeding.

Judge McDade August 31, 2011 Judge Lathrop Judge Wardwell Further, pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Andrew L. Stuyvenberg, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by August 24,2011.

Finally, the NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the license renewal issues to be decided in this proceeding.

Sincerely,

.f~

Brian G. Harris Counsel for NRC Staff

Enclosures:

- Hearing File Index, Supplement 31 - Deliberative Process Privilege Log Declaration of Brian E. Holian Affidavit of Andrew L. Stuyvenberg cc w/Encis.:

Service List


- Indian Point License Renewal Hearing File Index Supplement 31 - August 31,2011 10.#

Accession Number ML11208C459 30-001 ML11210B457 30-002 30-003 ML11214A098 ML11214A139 30-004 30-005 ML11215A201 30-006 ML11215A203 30-007 ML11215A220 Document Date 07/27/2011 07/29/2011 08/02/2011 08/0212011 08/03/2011 08/03/2011 08/03/2011 Title 2011107/27 Indian Point LR Hearing - FW: NL-11-090 Clarification for RAI Aging Management Programs 2011/07/29 Indian Point LR Hearing - Entergy letter regarding Indian Point water quality waiver 201Jl08/02 Indian F'Qint LR Hearing -IPEC RIS 2011-007 Call 2011/08/02 Indian Point LR Hearing - RE: NL-11-090 Clarification for RAI Aging Management Programs 2011/08/03 Indian Point LR Hearing - Entergy Participants 2011108/03 Indian Point LR Hearing - RE: Enterg~ Partici~ants 201Y08/03 Indian Point LR Hearing - Enterg~ Particip~l'1!s30-008 30-009 30-010 30-011 30-012 30-013 30-014 ML11220A035 ML11222A139 ML11222A141 ML11234A470 ML11235A497 08/08/2011 08/09/2011 08/09/2011 08/22/2011 08/2212011 ML11236A220 ML11236A222 08/24/2011 08/24/2011 2011108/08 Indian Point LR Hearing - FW: Follow up to email from Fridav 2011108/09 Indian Point LR Hearing - RE: Follow up to email from Friday 2011/08/09 Indian Point LR Hearing - Clarification of Revised RAI Response IPEC Relicensing 20 11/08/22 h1Qi~Ul Point LR Hearing - Conve~ing the draft BO 2011/08/22 Indian Point LR Hearing - IPEC License Renewal-Commitment Reconciliation NL-11-101 2011108/24 Indian Point LR Hearing - RE: IPEC Requested Comments on Recent Enter!:tv/NRC Telecons 2011108/24 Indian Point LR Hearing - RE: IPEC - Requested Comments on Recent Entergy/NRC Telecons 1

ID. #

Accession Number Author Name

& Author Affiliation Title Document Date Document Type Addressee Name

& Addressee Affiliation Comment Estimated Page Count DPP

-31 001 ML11208B430 A.

Stuyvenberg, NRC/NRO 2011107/27 Indian Point LR Hearing FW: Indian Point:

Supplement to Revised Biological Assessment for License Renewal 07/2712011 E-Mail wi Attachment J. Crocker, M.

Murray Brown, J. Williams NOAA; D.

Logan, NRC/NRRlDLR Discussion regarding supplement biological assessment

Attachment:

14 of Indian Point Nuclear Generating Unit Nos. 2 and 3 July 2011 Supplemental Biological Assessment DPP

-31 002 ML11208B437 J. Poehler, NRC/NRR 2011/07/27 Indian Point LR Hearing RE: Indian Point 2 and 3 LRA Amendment 9 RVI Program 07/27/2011 E-Mail wi Attachment K. Green, A.

Hiser, J. Boska, R. Kuntz, NRC/NRRlDLR Discussion regarding the review of IP reactor vessel internals program 11

Attachment:

RIS 2011-07 DPP ML11208B775 R. Kuntz, 2011/07/27 Indian 07/27/2011 E-Mail B. Fu, Discussion 2

-31 NRC/NRR Point LR Hearing NRC/NRRlDLR regarding 003 IP Input reference related to socket welds -Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 31 - August 31,2011 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosures as predecisional, deliberative information. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.

1 I

-Indian Point License Renewal Hearing File Index

. Deliberative Process Privilege, Supplement 31 -August 31,2011 10.#

Accession Author Title Document Document Addressee Comment Estimated Number Name Date Type Name Page

& Author

& Addressee Count Affiliation Affiliation DPP ML11208C473 R. Kuntz, 2011107/27 Indian 07/2712011 E-Mail wI C. Doutt, W.

Discussion 27

-31 NRC/NRR Point LR Hearing Attachment Holston, R.

regarding 004 FW: NL-11-090 Vaucher, O.

Entergy's Clarification for Vee, A. Hiser, submittal NL RAI Aging M. Homiack,11-090 Management NRC/NRRlDLR Programs

Attachment:

Entergy's July 27,2011 submittal, NL DPP ML11209C095 M. Homiack, 2011/07/28 Indian 07/28/2011 E-Mail wI B. Pham,11-090 Discussion 5

-31 NRC/NRR Point LR Hearing Attachment NRC/NRRlDLR regarding draft 005 ACTION: Revised of I P SER Section supplemental 3.0.5 for Review SER and Approval

Attachment:

Draft Section 3.0.5 of the Supplemental SER 2

-- - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 31 - August 31, 2011

~~~~

~~~-~~~

Document Document Addressee Number Title Author Accession 10.#

Type Date Name Name

& Addressee Affiliation

& Author Affiliation E-Mail wI 07/2812011 2011107/28 Indian R Kuntz, R B. Pham, DPP ML11209C929 Attachment Vaucher, A.

Point LR Hearing NRC/NRR

-31

Hiser, FW: IP SER 006 NRC/NRRlDLR supplement inputs E-Mail wi 07/28/2011 D. Morey, R 2011/07/28 Indian ML11209C933 B. Pham, DPP Attachment Kuntz, B. Fu, O.

Point LR Hearing NRC/NRR

-31

Vee, FW:IP 007 NRC/NRRlDLR Supplemental SER Comment Estimated Page Count Discussion regarding draft section of supplemental SER related to SG divider plate 8

Attachment:

Draft of Supplemental SER regarding SG divider plate Discussion regarding draft section of supplemental SER related to lSI program and small bore pipes 7

Attachment:

Draft of Supplemental SER regarding lSI and small bore piping 3


-Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 31 - August 31, 2011 Document Title Document

10. #

Accession Author Addressee Comment Estimated Number Date Type Name Name Page

& Author

& Addressee Count Affiliation Affiliation 07/28/2011 E-Mail 2011/07/28 Indian ML11209C938 B. Pham, D. Morey, R.

Discussion DPP 6

Point LR Hearing NRC/NRR

-31 Kuntz, M.

regarding draft 008 FW: ACTION: RE:

Homiack, R.

section of IPSER

Kalikian, supplemental Supplement input NRC/NRRlDLR SER related to for this Friday!

lSI program and small bore pipes 07/28/2011 E-Mail wI B. Pham, 2011/07/28 Indian D. Morey, R.

DPP ML11209C943 Discussion 5

Point LR Hearing Attachment

-31 NRC/NRR Kuntz, M.

regarding draft 009 FW: ACTION:

Homiack, section of Revised IP SER NRC/NRR/DLR supplemental Section 3.0.5 for SER related to Review and lSI program Approval and small bore pipes

Attachment:

Draft of Supplemental SER regarding lSI and small bore piping DPP 08/03/2011 E-Mail ML11215A184 2011/08/03 Indian R. Vaucher, B.

R. Kuntz, Discussion 3

Point LR Hearing

-31 NRC/NRR Pham, D.

regarding draft 010 RE: revision to

Morey, section of SER NRC/NRRlDLR supplemental SER related to SG divider plate 4

-Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 31 -August 31.2011 Title Document Document Addressee Comment Estimated Date Type Name Page

& Addressee Count Affiliation ID. #

DPP Accession Number ML11215A185 Autho Name r

& Aut Affilia hor

ion B.Pha 11,

-31 NRC/NRR 011 ML11215A186 R Kun tz, DPP

-31 NRC/NRR 012 2011108/03 Indian 08/0312011 E-Mail R Kuntz, R Discussion 4

Point LR Hearing -

Vaucher, D.

regarding draft Re: revision to

Morey, section of SER NRC/NRRlDLR supplemental SER related to SG divider plate 2011/08/03 Indian Point LR Hearing RE: revision to SER 08/03/2011 E-Mail B. Pham, R Vaucher, D.
Morey, NRC/NRRlDLR Discussion regarding draft section of supplemental SER related to SG divider plate 4

5

116 - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 31 - August 31, 2011 Document Document Comment Author Title Addressee Estimated Number

10. #

Accession Type Date Name Page Name

& Addressee Count Affiliation

& Author Affiliation E-Mail wi Discussion

-31 2011/08/08 Indian 08/08/2011 D. Logan, DPP ML11220A362 A.

Attachment NRC/NRRlDLR regarding 013 Point LR Hearing -

Stuyvenberg, Entergy's email from Friday FW: Follow up to NRC/NRR submission of data to NMFS

Attachment:

Email from M.Mattson to J. Crocker, 8/5111, re:

follow-up to email from Friday, and Hydrothermal Modeling of the Cooling Water Discharge from the Indian Point Energy Center to the Hudson River ASA Project 09-167 Report 22 March 2010 6

--- - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 31 - August 31, 2011 Author Title Document Document Addressee Comment

10. #

Accession Estimated Number Type Name Date Name Page

& Author

& Addressee Count Affiliation Affiliation 08/10/2011 E-Mail wI Discussion 26

-31 2011/08/10 Indian C. Doutt, R.

DPP ML11222A143 R. Kuntz, Point LR Hearing Attachment Vaucher, R.

regarding 014 NRC/NRR Auluck, B.

Entergy's RAI of Revised RAI FW: Clarification

Pham, response NL-Response IPEC NRC/NRRlDLR 11-096 Relicensing

Attachment:

Entergy's August 9, 2011, RAI response number NL-11 096 DPP E-Mail wi 08/1012011 V. Cullinan, Discussion ML11222A220 D. Logan, 2011108/10 Indian 14

-31 Point LR Hearing Attachment NRC/NRRlDLR regarding 015 NRC/NRR supplement Supplement to FW: Indian Point:

biological Revised Biological assessment Assessment for License Renewal

Attachment:

of Indian Point Email from A Nuclear Stuyvenberg to Generating Unit J. Crocker and Nos. 2 and 3 M. Murray-

Brown, 7/27/11, forwarding July 2011 Supplemental Biological Assessment 7

--- - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 31 - August 31,2011 ID. #

Accession Number DPP ML11222A250

-31 016 DPP ML11236A321

-31 017 Author Name

& Author Affiliation

~-

R Kuntz, NRC/NRR R Kuntz, NRC Title 2011/08/10 Indian Point LR Hearing RE: Clarification of Revised RAI Response IPEC Relicensing 2011/08/24 Indian Point LR Hearing Document Date 08/10/2011 08/24/2011 Document Type E-Mail E-Mail wI Attachment Addressee Name

& Addressee Affiliation R Vaucher, B.

Pham, A. Hiser, NRC/NRRlDLR B. Pham, NRC/NRRlDLR Comment Discussion on the need for an update to RAI response for SG divider plates Discussion regarding the draft of the supplemental SER Attachment Draft of the Supplemental SER Estimated Page Count 2

75 8

August 30,2011 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

ENTERGY NUCLEAR OPERATIONS, INC.

)

Docket Nos. 50-247 & 50-286-LR

)

)

(Indian Point Nuclear Generating Units 2 and 3)

)

DECLARATION OF BRIAN E. HOLIAN I, Brian E. Holian, do hereby state as follows:

1.

I am employed as the Director of the Division of License Renewal ("DLR") in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation ("NRR").

My supervisory responsibilities include oversight of the NRC Staff's review and evaluation of the Indian Point Nuclear Generating Station Units 2 and 3 license renewal application.

2.

As part of their responsibilities in updating the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified documents as privileged because they contained information concerning the Staff's pre-decisional deliberative process. The documents are listed in Attachment 2 to the submission of the Staff's Hearing File Index Supplement 31.

3.

I have personally reviewed the documents identified as privileged in Attachment 2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that it contains pre-decisional information concerning the Staff's review of the license renewal application. The documents contain either the Staff's analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect

- 2 to the matters discussed therein. The documents comprise part of the deliberative process necessary for the Staff's review of the pending license renewal application.

4.

Further, I have determined that disclosure of the documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill aI/

future deliberations and would interfere with the Staff's ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.

5.

Accordingly, I formally invoke the deliberative process privilege with respect to the documents listed in Attachment 2 to the submission of the Staff's Hearing File Index Supplement 31.

6.

I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

~~\\L~

Brian E. Holian Executed in Rockville, Maryland this 30 th day of August, 2011

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

ENTERGY NUCLEAR OPERATIONS, INC.

)

Docket Nos. 50-247 &50-286-LR

)

)

(Indian Point Nuclear Generating Station,

)

Units 2 and 3)

)

AFFIDAVIT OF ANDREW L. STUYVENBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Andrew L. Stuyvenberg, do hereby state as follows:

1.

I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Indian Point Nuclear Generating Station, Units 2 and 3 license renewal application ("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.

2.

I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed in the attached Hearing File Supplement 31 and that the disclosures are accurate and complete for documents identified as of August 24, 2011.

3.

I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

c::::./&

Andrew L. Stuyvenberg Executed in Rockville, Maryland this 30th day of August. 2011

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

ENTERGY NUCLEAR OPERATIONS, INC. )

Docket Nos. 50-247/286-LR

)

(Indian Point Nuclear Generating

)

Units 2 and 3)

)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Indian Point Hearing File, including: Attachment 1 - Indian Point License Renewal Hearing File Index Supplement 31, Affidavit of Andrew L. Stuyvenberg, dated August 30,2011, -Indian Point License Renewal Hearing File Index Supplement 31 - Deliberative Process Privilege, and Declaration of Brian E. Holian, dated August 30, 2011, have been served upon the following through deposit in the NRC's internal mail system, with copies by electronic mail, or, as indicated by an asterisk, by deposit in the U.S. Postal Service, with copies by electronic mail this 31 st day of August, 2011:

Lawrence G. McDade, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 E-mail: Lawrence.McDade@nrc.gov Dr. Richard E. Wardwell Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 E-mail: Richard.Wardwell@nrc.gov Dr. Kaye D. Lathrop Atomic Safety and Licensing Board Panel 190 Cedar Lane E.

Ridgway, CO 81432 E-mail: Kaye. Lathrop@nrc.gov Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop: 0-16G4 Washington, DC 20555-0001 E-mail: OCAAMAI L. resource@nrc.gov Office of the Secretary Attn: Rulemaking and Adjudications Staff Mail Stop: 0-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: Hearing. Docket@nrc.gov Josh Kirstein, Esq.

Atomic Safety and licensing Board Panel Mail Stop - T-3 F23 U. S, Nuclear Regulatory Commission Washington, D.C. 20555-0001 E-Mail: Josh. Kirstein@nrc.gov

Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T -3 F23 Washington, DC 20555-0001 (Via Internal Mail Only)

Kathryn M. Sutton, Esq.

  • Paul M. Bessette, Esq.

Jonathan Rund, Esq.

Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Washington, D.C. 20004 E-mail: ksutton@morganlewis.com E-mail: pbessette@morganlewis.com E-mail: jrund@morganlewis.com Martin J. O'Neill, Esq.*

Morgan, Lewis & Bockius, LLP 1000 Louisiana Street, Suite 4000 Houston, TX 77002 E-mail: martin.o.neill@morganlewis.com Elise N. Zoli, Esq.*

Goodwin Procter, LLP Exchange Place 53 State Street Boston, MA 021 09 E-mail: e.?:oli@goodwinprocter.com William C. Dennis, Esq.*

Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 E-mail: wdennis@entergy.com

- 2 Melissa-Jean Rotini, Esq.

Assistant County Attorney Office of Robert F. Meehan, Esq.

Westchester County Attorney 148 Martine Avenue, 6th Floor White Plains, NY 10601 E-Mail: MJR1@westchestergov.com John J. Sipos, Esq.*

Charlie Donaldson, Esq.

Assistants Attorney General New York State Department of Law Environmental Protection Bureau The Capitol Albany, NY 12224 E-mail: John.Sipos@ag.ny.gov Janice A. Dean, Esq.*

Assistant Attorney General, Office of the Attorney General of the State of New York 120 Broadway, 25th Floor New York, NY 10271 E-mail: Janice.Dean@ag.ny.gov Joan Leary Matthews, Esq.

Danie.1 E. O'Neill, Mayor*

James Seirmarco, M.S.

Village of Buchanan Municipal Building Buchanan, NY 10511-1298 E-mail: vOb@bestweb.net E-mail: smurray@villageofbuchanan.com Robert Snook, Esq.

  • Office of the Attorney General State of Connecticut 55 Elm Street P.O. Box 120 Hartford, CT 06141-0120 E-mail: robert.snook@ct.gov Phillip Musegaas, Esq.
  • Deborah Brancato, Esq.

Riverkeeper, Inc.

20 Secor Road Ossining, NY 10562 E-mail: phillip@riverkeeper.org dbrancato@riverkeeper.org

- 3 Manna Jo Greene*

Stephen Filler Hudson River Sloop Clearwater, Inc.

724 Wolcott Avenue Beacon, NY 12508 E-mail: mannajo@clearwater.org E-mail: stephenfiller@gmail.com Daniel Riesel, Esq.*

Thomas F. Wood, Esq.

Victoria Shiah, Esq.

Sive, Paget & Riesel, P.C.

460 Park Avenue New York, NY 10022 E-mail: driesel@sprlaw.com vshiah@sprlaw.com Michael J. Delaney, Esq.*

Director, Energy Regulatory Affairs New York City Department of Environmental Protection 59-17 Junction Boulevard Flushing, NY 11373 E-mail: mdelaney@dep.nyc.gov

~