ML11243A058
| ML11243A058 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 03/16/2010 |
| From: | Southern California Edison Co |
| To: | Office of Information Services |
| References | |
| FOIA/PA-2011-0157 | |
| Download: ML11243A058 (6) | |
Text
Uni t 2
System Status: AVC C'
User Status:
- CRPT, HRf
-- z
-p Notification:
NN 200836042 Ii IIIIIIIII III IIIIIIIII
==
Description:==
2B008 failed pilot cell voltage Created on: 03/16/12010 Reported By:L(b)(6)7 Responsible:
Priority: 4 Medium Required Start: 05'06/2010 12:57 End: 09,;02/2*)!0 12:57 Order No:
Code:
Task Exists?
[Y]
Func.Loc.: S2.DCPS.2B008 125V STATION BATTERY 2B008 Equipment:
Assembly:
Quality Class: II Location: CB Room:
Elevation:
Column:
Planner Group: Maint Electrical WorkCenter: ME Maint.
Electrical Plant: 1000 SONGS - Services Reliability Classification: CRITICAL-A ARC Review Status: C Completed Feedback Req'd? []
M Rule:
Sig Level: 4 Low Level Issue Breakdown (1 Malfunction Start:
Breakdown Duration:
H End:
==
Description:==
- 03/16/2010 2 1 : 1 6 : 2 1,(b)(6) ihoiie (b)(6)
S2.DCPS.2B008 battery pilot, cell #13 voltage was 2.1227 VDC and 2.1219 taken v--ith two u
-ifferent et!LS per the procedure.
Acceptance Criteria is equal to or greater than 2.1317.
So steps 6.4.1 and 6.4.1.1 are unsat and a failed surveillance. of S023-1-9.92 will be performed taking all cell voltages.
Notified operations and I(b)(6)
.1
- 04/01/2010 0 8 : 4 1 : 2 6(b)(6)
PhoneL This issue identified uinder this notification is identical to notification 200834923 Ref order 800480025...
ESRQ ze.,toved Print Date: 06/08/2010 Page 1 of 7
Trending Worksheet Notification; NN 200836042 Func.Loc.: S2.nCPS.2B008 125V STATION BATTERY 2E008 Parr:
Damage:
Cause:
Activity:
Part:
Damage:
Cause:
Activity:
Part:
Damage:
Cause:
Activitv:
Part:
Damage:
Cause:
Activity:
Print Date: 06/08/2010 Page 3 of 7
Task Details Notification:
NN 200836042 Func.Loc.: S2.DCPS.2B008 125V STATION BATTERY 2R008 Location:
CB Room:
Elevation:
Colum:
Sort No.:
0001 Code Group: N-TS-IOD Immediate Operability Determination Short Text: DNC - Redundant to NN 200834923 Task Code: N050 IOD-Canceled / Not Applicable/No DNC WorkCenter:
EM SYE Electrical/I&C Systems Responsible: l(b)(6)
Status:
TSCO Planned Start: 03/19/2010 16:31 Planned End: 03/19/2010 16:31 Complete: 03/19/2010 16:31 Task Long Text:
NOTES:
- 1) Parts 1 through 4 will be completed by the STA.
- 2) Part 5 may be completed by Operations (STA) or Engineering (Responsible Engineer) when the SSC has been restored to a fully qualltieo status.
IOD (lmmediate Operability Determination)
This is an Immediate Operability Determination (IOD).
- 1. Deficiency Identified and the Affected Functional Location:
S2.DCPS.2B008 Battery pilot cell #13 voltage was 2.1227 VDC and 2.1218 taken with two different meters.
- 2.
Identify the Specified Safety Function(s); include mission time (if applicable):
The DC electrical power system provides normal and emergency DC electrical power for the DGs, emergency auxiliaries, and control and switching during all MODES of operation.
3.
Conclusion:
Determine OPERABLE/INOPERABLE XXXXX Operable Inoperable Basis (provide discussion): The measured voltage exceeds Tech Spec Surveillance 3.8.6 specification limit of >2.07 V.
The cell voltage will be trended by engineering in acrrd~nc-P with LCS 3.8.106 condhitie C.
Print Date: 0/08/2010 Page 4 of 7 J
Task Details Continued Notification:
NN 200836042
==
Description:==
2B008 failed pilot cell voltage The LCS checks che fuLl-flr)at op'eration of the battery charger serving to maintain the battery in a fully charged condition as well as to supply power to the normal loads.
This assists in maintaining a battery that is capable of satisfying its design requirements.
There was a failure to satisfy the Surveillance requirements for the LCS and thus the LCS requires additionally actions to accommodate this check.
- However, the battery remains fully qualified to perform its specified function.
A separate notification has been written tc.
facilitate the engineering trend action as required per the LCS condition C.
- 4.
Extent of Condition (Required for Inoperable)
EOC Created (YES or NNO)
? NO Describe "other train/other unit" findings (if performed):
- 5.
IOD Closure Information This issue idenriFipid under this notification is identical to notification 200834923.
This IOD is a duplicate of the IOD being monitoring on notification 200834923.
Notification 200834923 also contains the approved POD and thus this notification should be used as the primary means of tracking the 2B008 battery issues. On this basis this IOD can be cancelled.
Prepared By: [(b)(6)
/18/2010 T3ENl3 PQS Verified Valid in EQUIS Until 9/17/2010 R ev ewed By : _* 16!iii*................
.iii Reviewed By:[ý)6 T3ENI3 PQS Verified Valid until 3/25/2011 IOD cancelled and closed with tracking information contained in 1N 200834923.
(b)(6)
Print Date: 06/08/2010 Page S of 7 Print Date: 06/082010 Page 5 of 7
Task Details Notification:
NN 200836042 Func.Loc.: S2.DCPS.2B008 125V STATION BATTERY 2B008 Location:
CS Room:
Elevation:
Column:
Sort No.:
0002 Code Group: N-SPT General Support Record Short Text: Investigate & initiate corrective action Task Code: ST04 SPT Complete WorkCenter: EMEE Electrical Engrg Responsible:
i(b)(6)
Status:
TSCOI.
Planned Start: 04/02/2010 01:59 Planned End: 04/02/2010 01:59 Complete: 04/02/2010 01:59 Task Long Text:
SPT (General Support Record)
Describe the General support request; 200836042 task 2 03/16/2010 S2.DCPS.2B008 battery pilot cell #13 voltage was 2.1227 VDC and 2.1213 taken with two different meters per the procedure.
Acceptance Criteria is eqial to or greater than 2.1317.
So steps 6.4.1 and 6.4.1.1 ate unsat and a failed surveillance.
Attachment 3 of SO23-i-).92 wili te performed taking all cell voltages.
Battery 25008 Cell 413 needs to be replaced due to continued degradation after battery bank equalizing charge.
Several NMOs were generated to replace the degraded cell so that the battery can perform its specified safety function.
The NMOs are:
800480098 2B002/2BO04-Optimum Load Sharing-3/20 CPL 800480128 2B008-Swap jar 13/14 with spare 17/18-3/26 F/C (CSR, closed)
(b)(6) 3./20/2010 Peer Check: l(b)(6)
Update
~........
)......
Update byb-./21/10 at 3:45PM (PQS T3ENI3 expires 12/16/10) 2B008 was claced in service and hat-t-ry rhecks completed by Eleri)-i 3/21/2010.. 1741 IbM (6:.....................
Verified work compe.1...
/0,1-.......21/00 194 Print Date: 06/08,/2010 L Page 6 of 7
Task Details Continued Notification:
NN 200836042
==
Description:==
22008 failed piloL celL voLtaqe Print Date: 06/08/2010 Page 7 of 7