Letter Sequence Other |
---|
|
|
MONTHYEARML11208C4532011-07-21021 July 2011 Units, 1 and 2 - Exemption Request for Nuhoms Dry Shielded Canisters Loaded to Incorrect Heat Load Limits Project stage: Request ML1124300772011-08-25025 August 2011 Ltr. to L.N. Hartz Request for Exemptions from Certain Requirements in 10 CFR Part 72 for the North Anna Power Station Independent Spent Fuel Storage Installation - Supplemental Information Needed Project stage: Other ML11286A1432011-09-28028 September 2011 Exemption Request for Nuhoms Hd Dry Shielded Canisters Loaded to Incorrect Heat Load Limits Supplemental Information Project stage: Supplement ML11300A1692011-10-26026 October 2011 Ltr. to L.N. Hartz Request for Exemption from 10 CFR 72.212(b)(3) and (b)(11) for Dry Fuel Storage at the North Anna Power Station - Accepted for Review Project stage: Approval ML1208704282012-03-26026 March 2012 Memo C Bladey, Adm, Notice of EA and Fonsi - VEPCO, North Anna Power Station (72-1030, 50-338, 50-339, 72-56) Project stage: Other ML1208704052012-03-26026 March 2012 Ltr L N Hartz, VEPCO, North Anna Power Station Units 1 and 2 - EA and Fonsi Related to Issuance of Exemption to Allow Continued Storage of the Nuhoms Hd Systems Loaded to the Incorrect Heat Load Limits (72-1030, 72-56, 50-338, 50-339, TAC L Project stage: Approval ML12104A0822012-04-12012 April 2012 Enclosuexemption L. N. Hartz Letter Exemption from Parts of 10 CFR 72.212 - Storage of the Nuhoms Hd Dry Shielded Canisters at North Anna Power Station Independent Spent Fuel Storage Installation (TAC No. L24551) Project stage: Approval ML12104A0332012-04-12012 April 2012 Letter Exemption from Parts of 10 CFR 72.212 - Storage of the Nuhoms Hd Dry Shielded Canisters at North Anna Power Station Independent Spent Fuel Storage Installation (TAC No. L24551) Project stage: Approval 2011-08-25
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] |
Text
August 25, 2011 Mr. L. N. Hartz Vice President, Nuclear Support Services Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060
SUBJECT:
REQUEST FOR EXEMPTIONS FROM CERTAIN REQUIREMENTS IN 10 CFR PART 72 FOR THE NORTH ANNA POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION - SUPPLEMENTAL INFORMATION NEEDED
Dear Mr. Hartz:
By letter dated July 21, 2011, Virginia Electric and Power Company (Dominion) requested exemptions from the requirements of 10 CFR 72.212(b)(3) and (b)(11). The exemptions were requested for NUHOMS HD Dry Shielded Canisters (DSC), Model Number HD-32PTH, with serial numbers DOM-32PTH-004-C, -005-C, -007-C, -010-C, -013-C, -019-C and GBC-32PTH-011-C due to non-compliance with the terms and conditions of the Transnuclear, Inc., Certificate of Compliance (CoC) 72-1030, Amendment No. 0. At the time of loading, the decay heat limit was exceeded for twelve fuel assemblies. The twelve fuel assemblies are distributed over the seven identified DSCs.
U.S. Nuclear Regulatory Commission staff performed an acceptance review of the exemption request, to determine if the request contains sufficient information to allow the staff to complete the detailed technical review. This letter is to advise you that based on our acceptance review, the request does not contain sufficient information. The information needed to continue our review is described in the enclosure to this letter as a Request for Supplemental Information. In order to schedule our technical review, this supplemental information should be provided by September 14, 2011. If the supplemental information is not received by this date, the review of this request may be delayed. The supplemental information requested and associated timeframe for the Dominion response were discussed with Mr. Thomas Szymanski of your staff on August 25, 2011.
L. Hartz If you have any questions regarding this matter, please contact me at 301-492-3268.
Sincerely,
/RA/
Jennie Rankin, Project Manager Licensing Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-338, 50-339, 72-56, 72-1030 TAC No.: L24551
Enclosure:
Request for Supplemental Information cc w/encl: Distribution via Listserv
ML112430077 G:\SFST\Rankin\Surry and North Anna Exemptions\NorthAnna RSI letter.docx OFC SFST SFST SFST SFST SFST NAME JRankin JBorowsky MSampson WWheatley MWaters DATE 8/22/11 8/22/11 8/22/11 8/22/11 8/25/11 VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NOS. 50-338, 50-339, 72-56, AND 72-1030 REQUEST FOR SUPPLEMENTAL INFORMATION RELATED TO THE REQUEST FOR EXEMPTIONS FROM CERTAIN REQUIREMENTS IN 10 CFR PART 72 FOR THE NORTH ANNA POWER STATION UNITS 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION Request for Supplemental Information General Information Provide an environmental report.
The July 21, 2011, exemption request does not include an environmental report. To aid the staff in performing an environmental assessment, an environmental report should be submitted pursuant 10 CFR 51.60 which discusses the considerations of 10 CFR 51.45.
This information is needed for staff to complete an environmental assessment pursuant 10 CFR 51.30.
Thermal Evaluation Provide the ANSYS files required to run the thermal analyses presented in Transnuclear, Inc.
Calculation No. 10494-174, including the files listed in Section 6.0 of the calculation.
The staff needs the files to run the ANSYS thermal analyses, including those listed in Section 6.0, to verify the models presented in Transnuclear, Inc. Calculation No. 10494-174.
This information is needed to determine compliance with 10 CFR 72.122(h).
Enclosure