QUALITY FIRST ORIGINAL UNIT 2 SONGS MAINTENANCE ORDER NO:
08030184000 gress 002002000 INTERVAL -
01 FREQUENCY -
W CATEGORY:
70 - Work In Pro REPETITIVE MAINT.
NO.
30 RESPONSIBLE ORG:ELECTRICAL TENANCE TYPE-SV UNIT 2 MAINJ EQUIPMENT ID: S21806EB007 RC:CB CONST.
CODE:N/A PRIO SU SYSTEM:
PKA ACCOUNTING DISTRIBUTION:0121 7221 QC WITNESS/HOLD R FUNC DESC:
125VDC STATION BATTERY 2D1 LOCATION.
AREA: CB ROOM:
306E ELEVATION:
050 COLUMN:
18.5NI IQUAL CLASS:2 RITY : DD
%EQD :
N I
I NOTE:
WORKLIST ATTACHED K
DESCRIPTION:
WEEKLY IE BATTERIES INSP.-
UNIT 2 RCM-CRITICAL/TS/RCM/PMO/AR040201281-97
=3- /I-c' R*EARKS:
New Add BOOX.
REQtESTOR DATA:
CREW CODE:
zW0 DCP:
ENVIRN QUAL:
N PROJECT CODE:
SEIS:
1 REQUESTING DEPT:
EL2 REQUESTOR NAME:
(b)(6)
PAX:
(b)(6)
REQUIREMENTS:
FIRE PROT.
ADMIN.
REQD?
Y WORK AUTH REQD?
N SECURITY REQD?
N WORK AUTH TYPE?
N SSR REQD?
ASME CODE WORK?
N NO.
N/A 00 POORM V.U1 DOCUM ENGINEERING REQD?
N MO TO DISP NCR?
N NO.
N/A BESTAVAILABLECQ FME REQUIREMENTS?
N TEMPORARY MOD.?
N NO.
N/A (b)(6)
R.E.P. EVAL.
REQD?
N
_jCREACUS BREA*CH?
N FCN REQD?
NO.
Si -D-UMENT(FITI",
ECP REQD?
NO.
SCHEDULING:
R.M.
DUE DATE 3/11/2008 00:00 RITTS:
DUE DATE 3/11/2008 07:00 VIOLATION DATE 3/13/2008 01:00 SCHEDULED START DATE 3/11/2008 00:30 (b(6)
SCHEDULED COMP DATE 3/12/2008 18:00 MO OBJECTIVE:
Perform weekly inspection of IE batterys.
08 03 01.84- 0 Page111aI Originator File Copy o8030184000 3)
MO: 08-030184000 ORIGINAL @ Category 70 (WORK PLAN DETAIL CONTINUED)
WITH THE EXCEPTION OF SECTION 6.9, ON ALL WORK LISTED COMPONENTS.
- 2.
VISUALLY INSPECT THE GENERAL APPEARANCE AND CLEANLINESS OF EACH BATTERY AND BATTERY AREA AS FOLLOWS:
A.
AS NECESSARY, WIPE THE CELL JARS, BATTERY RACKS, AND FLOOR WITH A SOLUTION OF BICARBONATE SODA AND COLD, DISTILLED OR DI WATER.
B.
WIPE AGAIN USING CLEAN DISTILLED OR DI WATER.
C. VERIFY NON-ESSENTIAL EQUIPMENT AND DEBRIS HAS BEEN REMOVED FROM EACH BATTERY ROOM.
PLANNING APPROVALS:
BY FIRE PROTECTION REVIEW WORK PLANNED WORK PLANNED REVIEW WORK SCHEDULED (b)(6)
DATE 02/12/96 02/12/96 02/12/96 03/05/08 TIME 14:14:00 14:13:59 14:26:45 05:32:05 PROCEDURE LIST:
PROCEDURE ID REV TCN 1 - S0123-I-2.2 007 002 Desc:
125 VDC PILOT CELL BATTERY INSPECTION CRAFT INFORMATION:
CRAFT CODE CRAFT DESCRIPTION QTY ESTIMATED HOURS ACTUAL HOURS 1 -
EL ELECTRICIAN 2.0 6.0 2 - SP FIRST LINE SUPERVISOR 1.0 2.0 WORK DONE:
Work Started:
Date -
/
I_/.
Time-00o TF
- -%14F XV~
II~
A-%J J' 2...?
~-~~i t~wgj~e'?q OF
$"I:
.I
,j 0808 0184-0 Page 5 030184000
NUCLEAR ORGANIZATION UNITS 1. 2 AND 3 MAINTENANCE PROCEDURE REVISION 7 SOl123-1-2.2 PAGE 2 OF 47 TCN 7-2 1.0 OBJECTIVES 1.1 This procedure provides guidance for performing the Weekly 125 volt Battery Bank and Charger operability verification checks.
1.2 This procedure satisfies the surveillance requirements specified in the Unit 2 and Unit 3 Technical Specifications, LCO - SR, Sections 3.8.4.1, 3.8.5.1, 3,8.6.1, and Table 3.8.6-1 Category "A" Limits.
1.3 This procedure performed at least monthly, satisfies the requirements stated in IEEE Std. 450-1980.
1.4 This procedure is applicable to the 125 VDC Station Battery Banks.
2.0 REFERENCES
2.1 Refer to Attachment 1 for the Procedure Resource List.
3.0 PREREQUISITES 3.1 Before starting work, the user SHALL verify this procedure is current by referring to NDMS or one of the other methods listed in S01 23-1-1.3.
3.2 Enter the following data:
Mo# IoZ3 01g 4 000 Unit EquipId: S14eO'ET3006 3.3 This procedure MAY be performed while Equalize Charging the Battery Bank unless one of the conditions listed in Section 3.4 is true.
0803 0184-'0
,o123-I-2.2 030184000
NUCLEAR ORGANIZATION UNITS 1, 2 AND 3 MAINTENANCE PROCEDURE REVISION 7 S0123-1-2.2 PAGE 7 OF 47 TCN 7-2 NOTE:
When taking Battery Bank Terminal Voltage, use a Fluke 187
( equivalent or better) set on the 500V range. ff necessary, reference Design Calc E4C-O 17.
6.2 Battery Bank Voltage TIS REQUIREMENT I 6.2.1 Measure Battery Bank Terminal voltage. Record readings below.
I ACCEPTANCE CRITERIA I All 125 VDC Battery Banks:
2:129.17 i
VDC 13ti sl,
,"VDC SAT Goto Step 6.2.2.
UNSAr Ac3 IProrms aColreowi.
Go1 I
Perform Corrective IA
%I IoSe JUST I L Actions as Follows.
.1 Immediately notify your Supervisor of the "UNSATr condition.
.2 This Supervisor SHALL report a failed Surveillance according to Procedure SO 123-1-1.3.
.3 Notify the Engineer, and generate an AR.
(b)(6)
WT:
0 CHK CPL 0oH ol OHK P 0803 0184-0 I
SETO COTNE N
ETPG s0123-I-2.2 030184000