05000331/LER-1980-036-03, During Power Ascension Following Shutdown,Rod Block Monitor B Failed.Caused by Improperly Seated Pin Connector at Rod Select Matrix Panel. Protective Panel Installed Over Pins.Pin Connectors Seated
| ML112410941 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 04/28/1981 |
| From: | Rager M IES Utilities, (Formerly Iowa Electric Light & Power Co) |
| To: | NRC/OI/RGN-III/FO |
| Shared Package | |
| ML112410942 | List: |
| References | |
| LER-80-036-03X, LER-80-36-3X, NUDOCS 8105040435 | |
| Download: ML112410941 (3) | |
| Event date: | |
|---|---|
| Report date: | |
| 3311980036R03 - NRC Website | |
text
REGULATOR#
FORMATION DISTRIBUTION 8
EM (RIDS)
ACCESSION NBR:8105040435 DUC.DATE: 81/04/28 NOTARIZED: NO DOCKET #
FACIL:50-331 Duane Arnold Energy Center, Iowa Electric Light & Pow 05000331 AUTHNAME AUTHOR AFFILIATION RAGERMS.
Iowa Electric Light & Power Co, RECIP.NAMEi RECIPIENT AFFILIATION Region 3, Chicago, Office of the Director SUBJECT: Updated LER 80-036/03X-1:on 800718,during power ascension following shutdownerod block monitor B failed.Caused by improperly seated pin connector at rod select matrix panel.
Protective panel installed over pins.Pin connectors seated.
DISTRIBUTION CODE: A002S TITLE: Incident Reports COPIES RECEIVED:LTR ENCL... SIZE:+/-
V,..
NOTES:
RECIPIENT ID CODE/NAME, ACTION:
IPPOLITOT. 04 INTERNAL: A/D COMP&STRU06 A/D MATL & QUO8 A/D PLANT SYS1O A/D SFTY ASSE42 AEOD ASLBP/J.HARD CHEM ENG BR 16 CORE PERF BR 18 DIRHUM FAC $21, EFF TR SYS BR23 GEOSCIENCES 26 I&E 05 LIC GUID BR 30 MECH ENG BR
- 33.
OR ASSESS BR 35.
RAD ASSESS BR39 0i Y PROGEVA42 EXTERNAL: ACRS NSIC 46 05 COPIES LTTR ENCL 3
3 RECIPIENT ID CODE/NAME COPIES LTTR ENCL A/D ENV TECH 07 A/D OP REACT009 A/D RAD PROT 11 ACC EVAL BR 14 AEOD/DMU AUX SYS BR 15 CONT SYS BR.17 DIRENGINEERI20 DIRSYS INTEG22 EQUIP QUAL BR25 I&C SYS BR 29 JORDANE./IE MATL ENG BR 32 NRC PDR 02 POWER SYS BR 36 REACT SYS BR 40 REL & RISK A 41 STRUCT ENG BR44 16 1
16 1
LPDR 03 1
1
,MAY 0 5 1981 TOTAL NUMBER OF COPIES REQUIRED: LTTR 61 ENCL 61
Iowa Electric Light and Ibwer Company April 28, 1981 DAEC-81-270 Mr. James G. Keppler, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission -
Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Licensee Event Report No.80-036 UPDATE REPORT:
(30 day)
Previous Report Date 8-15-80 File:
A-118a
Dear Mr. Keppler:
In accordance with Appendix A to Operating License DPR-49, Technical Specifications and Bases for Duane Arnold Energy Center and Regulatory Guide 10.1, please find attached a copy of the subject Licensee Event Report.
(Total of 3 copies transmitted).
Very truly yours, Daniel L. Mineck Chief Engineer Duane Arnold Energy Center DLM/MSR/pl Docket 50-331 attachment cc:
Director, Office of Inspection and Enforcement (30)
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Director, Management Information and Program Control (3)
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D. C.
20555 NRC Resident Inspector -
DAEC4 Dunne Arnold Enemv Center
- PO. Box 351
- Cedar Rapids, Iowa s406 319/851-5611
NRC FORM 366 U. S. NUCLEAR REGULATORY COMMISSION
- LICENSEE EVENT REPORT DATE REPORT: Previous L
N eport Date: 8-15-80 CONTROL SLOCK:
(PLEASE PRINT OR TY d ALL REQUIRED INFORMATION)
S]
A ID A IC 1.1 120 0 10 -10 0 1 0 0 1-10W 0D 4 1 11 111111 1 (
1 7 8 9 LICENSEE CODE 14 is UCIENSE NUMBER 2S 26 LICENSE TYPE 0
57 CAT 58 CONT SOCE LLO1(0 15 10 10 0 13 3 1 hI 0 1 711 18 18 I10
- 0. 14 12 1 8 1 110 8
60 61 0OCKET NUMSER 68 69 EVENT DATE 74 7S REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES 2
IDuring power ascension following a reactor shutdown, the "B" Rod Block M 03 jonitor (RBM) failed "inop" causing a control rod block. Channel A RBM wa o4 is proved operable before continuing rod withdrawal with the "B" RBM bypa T] Issed for maintenance. Tech Spec 3.2.C.2, Table 3.2.C specifies that one 6
I instrument channel must be operable per trip system when plant is in "R I
un" mode, The "B" RBM was returned to service approx. one hour later. 0 0778 I ne previous similar occurrence has been recorded. See RO 79-28.
7 89 80 SYSTEM
CAUSE
CAUSE COmP.
VALVE CODE CODE SUBCO0E COMPONENT COOS SUBCO0E SUSCODE 7
LJi B
]3 W
I Il NI SITI RI U i EJ LZ@
7 8
9 10 11 12 13 i8s 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION L.A/RO rEVENT YEAR REPORT NO.
coO0 TYPE NO.
UMORT 1- -
LO 3I1 6 0-3 6 0 1 31 X--
NU 2 1 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRO-4 PRIME COMP.
COMPONENT TAKEN ACTION ON PLANT METHOO MOURS @
SU6MITTED FORM S8.
SUPPLIER MANUFACTURER 1.i.Js J L
.J@
LzJ1 1Lo ol o1 I LNJ@
L.J IG101 801 k.LLJYS W1 wo 0___
33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 1
Cause was an improperly seated pin connector at Rod Select Matrix Panel.
I IConnector apparently worked loose over period of time due to inadvertent 12" Iphysical contact by personnel. Protective panel has been installed over T3 I pins, Pin connectors seated and panel tested. GE components.ILocking co 1 L nnectors have been installed to preclude recurrence.
FACILITY STATUS SPOWER OTHER STATUS DISCOVERY DISCOVERY OUSCRIPTON ID L.EJ@ 1012 1_91 NA IIA L
Operator Observation 7
8 9 10 12 11 4
ACTIVITY CONTENT L
O RELEASFO OF RELEASE AMOUNT OF ACTIVITY EID Lzf @ LZJ 1
NA NA 7
a 9
10 11 4
PERSONNEL EXPOSURES NUMBER TYPE
DESCRIPTION
1 Inol oQ 01 7 11 NA 7
8 9
.I 12 13 so PERSONNEL INJURIES NUMBER DESCRIPTION 8 0A0l.0OperNA a
7 8
9 11 12 90 LOSS OF OR DAMAGE TO FACILITY TYPE CESCRIPTION ST17 1 7 jai NA 7
8 9 10 PUBLICITY ISSUED NRC USE ONLY 2IIIILJ@1 NA 7
8 9 10 so NAME OF PREPARERO Matthew S.ORager A319-851-5611 80E