ML11237A045

From kanterella
Jump to navigation Jump to search
Closure of OI Investigation 4-2010-061.pdf
ML11237A045
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/25/2011
From: Heather Gepford
NRC Region 4
To: Peter Dietrich
Southern California Edison Co
References
4-2010-061
Download: ML11237A045 (1)


Text

\\~.

~l.Il.. ~

UNITED STATES

/\\.I" ~

NUCLEAR REGU L AT ORY COMMISS I ON REGION IV 612 EAST lAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011.4125 Mr. Peter Dietrich Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 AUG 2 5

SUBJECT:

CLOSURE OF INVESTIGATION (014-2010-061)

Dear Mr. Dietrich:

This refers to an investigation conducted by the NRC's Office of Investigations regarding activities at San Onofre Nuclear Generating Station. The Office of Investigations initiated the investigation to determine whether two former contract electricians willfully violated procedures in the wiring of a terminal board at the San Onofre Nuclear Generating Station.

Based on the evidence developed during the investigation, testimony, and document reviews, the allegation was not determined to be willful. The NRC plans no further action related to the willful aspects of this allegation and considers this investigation closed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Dockets: 50-361; 50-362 Licenses NPF-10; NPF-15 Sincerely,

~;jarrU/Y Heather J. Gepford, Chief Allegations Coordination and Enforcement Branch