ML112371704
| ML112371704 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/25/2011 |
| From: | Michael Mahoney Plant Licensing Branch III |
| To: | Lashley P FirstEnergy Corp |
| mahoney, m NRR/DORL/LPLIII-2 415-3867 | |
| References | |
| TAC ME6805, TAC ME6806, TAC ME6807, TAC ME6808 | |
| Download: ML112371704 (2) | |
Text
From:
Mahoney, M Sent:
Thursday, Au To:
Wohl, Marily
Subject:
FW: Accepta Request - M Can you please add the below emai Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV From: Mahoney, Michael Sent: Thursday, August 25, 2011 12:46 To: 'phlashley@firstenergycorp.com' Cc: kjnevins@firstenergycorp.com; Szab
Subject:
Acceptance Review Results fo through ME6808 Phil Lashley Licensing Supervisor Davis-Besse Nuclear Power Plant, U FirstEnergy Nuclear Operating Com
Dear Mr. Lashley,
By letter L-11-236 dated July 26, 20 System Accession No. ML11215A13 licensee) submitted a notice regardi threshold determination under Title Specifically, FENOC requested the U threshold determination that the pro does not involve any direct or indirec NRC written consent pursuant to 10 The purpose of this e-mail is to prov application. The acceptance review information in scope and depth to al The acceptance review is also inten Michael ugust 25, 2011 2:09 PM yn ance Review Results for Davis-Besse Threshold Determ ME6805 through ME6808 il to ADAMS?
oject Manager, Licensing Branch III-2 g
6 PM bo, Aaron; Zimmerman, Jacob or Davis-Besse Threshold Determination Request - ME August 25, 2011 Unit 1 pany 11 (Agencywide Documents Access and Manage 31), FirstEnergy Nuclear Operating Company (FE ng limited liability conversion (LLC) and request f 10 of the Code of Federal Regulation (CFR), Sec U.S. Nuclear Regulatory Commission (NRC) mak posed conversion from a corporation to a LLC co ct transfer of control of any NRC license that requ CFR 50.80.
vide the results of the NRC staffs acceptance rev w was performed to determine if there is sufficient low the NRC staff to complete its detailed technic ded to identify whether the application has any re mination 6805 ement ENOC, the for ction 50.80.
ke a ompany uires prior view of this technical cal review.
eadily
apparent information insufficiencies licensing basis of the plant.
The NRC staff has reviewed your ap information in sufficient detail to ena review and make an independent as application in terms of regulatory req and the environment. If additional in technical review, you will be advised If you have any questions, please co available in ADAMS.
Docket No. 50-346 Sincerely, Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV in its characterization of the regulatory requireme pplication and concluded that it does provide tech able the NRC staff to proceed with its detailed tec ssessment regarding the acceptability of the prop quirements and the protection of public health an nformation is needed for the NRC staff to comple d by separate correspondence.
ontact me. A copy of this email will be made pub oject Manager, Licensing Branch III-2 g
ents or the hnical chnical posed d safety ete its blicly