UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 22, 2011 Mr. Tom E. Tynan Vice President Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

VOGTLE, UNIT 2 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Tynan:

From September 26, 2011, to October 7, 2011, the NRC will perform a baseline inservice inspection (ISI) at the Vogtle Electric Generating Plant, Unit 2 (NRC Inspection Procedure 71111.08). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspector is adequately prepared. The second group (Section B of the enclosure) identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mark Hickox of your organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the lead inspector Robert Williams Jr. at (404) 997-4664 (robert.williams@nrc.gov).

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

SNC 2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Joel Rivera-Ortiz, Acting Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-425 License No.: NPF-81

Enclosure:

Inservice Inspection Document Request cc w/encl.: (See page 3)

___ML112340456_______ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII: DRS/EB3 RII: DRS/EB3 SIGNATURE Via email /RA/

NAME R. WILLIAMS J.RIVERA-ORTIZ DATE 08/19/2011 08/22/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

SNC 3 cc w/encl:

Division of Radiological Health N. J. Stringfellow TN Dept. of Environment & Conservation Licensing Manager 401 Church Street Southern Nuclear Operating Company, Inc.

Nashville, TN 37243-1532 Electronic Mail Distribution B. D. McKinney, Jr. R. L. Gladney Regulatory Response Manager Licensing Engineer Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution Hickox, T. Mark Paula Marino, Vice President Vogtle Electric Generating Plant Engineering Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution M. J. Ajluni Nuclear Licensing Director Bob Masse Southern Nuclear Operating Company, Inc. Resident Manager Electronic Mail Distribution Vogtle Electric Generating Plant Oglethorpe Power Corporation Sandra Threatt, Manager Electronic Mail Distribution Nuclear Response and Emergency Environmental Surveillance J. L. Pemberton Bureau of Land and Waste Management SVP & General Counsel-Ops & SNC Department of Health and Environmental Southern Nuclear Operating Company, Inc.

Control Electronic Mail Distribution Electronic Mail Distribution S. C. Swanson T. D. Honeycutt Site Support Manager Regulatory Response Supervisor Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Chris Clark Jeffrey T. Gasser Commissioner Chief Nuclear Officer Georgia Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Lee Foley L. Mike Stinson Manager of Contracts Generation Vice President Oglethorpe Power Corporation Joseph M. Farley Nuclear Plant Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution F. Allen Barnes Director L. P. Hill Environmental Protection Division Licensing Supervisor Georgia Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution cc w/encl (continued on page 4)

SNC 4 cc w/encl (continued)

Cynthia A. Sanders Mr. Reece McAlister Radioactive Materials Program Manager Executive Secretary Environmental Protection Division Georgia Public Service Commission Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution Office of the Attorney General James A. Sommerville 40 Capitol Square, SW Program Coordination Branch Chief Atlanta, GA 30334 Environmental Protection Division Georgia Department of Natural Resources L. L. Crumpton Electronic Mail Distribution Administrative Assistant, Sr.

Southern Nuclear Operating Company, Inc.

James C. Hardeman Electronic Mail Distribution Environmental Radiation Program Manager Environmental Protection Division Office of the County Commissioner Georgia Department of Natural Resources Burke County Commission Electronic Mail Distribution Electronic Mail Distribution Ted V. Jackson Arthur H. Domby, Esq.

Emergency Response and Radiation Troutman Sanders Program Manager Electronic Mail Distribution Environmental Protection Division Georgia Department of Natural Resources Director Electronic Mail Distribution Consumers' Utility Counsel Division Governors Office of Consumer Affairs Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution

INSERVICE INSPECTION DOCUMENT REQUEST Inspection Dates: September 26, 2011, to October 7, 2011 Inspection Procedures: IP 71111.08, Inservice Inspection (ISI) Activities Inspectors: Robert Williams Jr., Reactor Inspector (Lead Inspector, ISI)

Brendan Collins, Reactor Inspector (SGISI)

A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (CD preferred), in care of Robert Williams Jr. by September 16, 2011, to facilitate the selection of specific items that will be reviewed during the onsite inspection week.

The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.

A.1 ISI / Welding Programs and Schedule Information a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs during the upcoming outage.

Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400. (Do not provide separately if other documentation requested contains this information).

ii) Reactor pressure vessel head (RPVH) examinations planned for the upcoming outage.

iii) Examinations planned for Alloy 82/182/600 components that are not included in the Section XI scope. (If applicable).

iv) Examinations planned as part of your Boric Acid Corrosion Control Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).

Enclosure

2 v) Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs)).

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.

c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual VT-1, VT-2, and VT-3), which have identified surface or volumetric indications that were analytically evaluated and accepted for continued service on Code Class 1 & 2 systems since the beginning of the last refueling outage.

This should include the previousSection XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests.

Also, include in the list the NDE reports with identified surface or volumetric indications that were analytically evaluated and accepted for continued service in the RPVH penetration nozzles. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 systems , which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code or 10 CFR 50.55a are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.

g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h) Please provide copies of the most recent self-assessments for the ISI, Welding, and Alloy 600 Programs.

A.2 Reactor Pressure Vessel Head (RPVH) a) Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the vessel head to meet the augmented inspection requirements of 50.55a(g)(6)(ii)(D). Also, include examination scope expansion criteria and planned expansion sample sizes if relevant indications are identified. (If applicable).

b) A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific Enclosure

3 industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).

A.3 Boric Acid Corrosion Control Program (BACCP) a) Copy of the procedures that govern the scope, equipment, and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle the unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the BACCP.

c) Please provide a copy of the most recent self-assessment performed for the BACCP.

A.4 Steam Generator (SG) Inspections a) A schedule of:

i) SG tube inspection, data analyses, and repair activities for the upcoming outage.

ii) SG secondary side inspection activities for the upcoming outage.

b) A copy of your SG ISI Inspection Program and Plan.

c) A copy of the last Condition Monitoring and Operational Assessment, and the Degradation Assessment for the upcoming outage.

d) Description of deviations from TSTF-449 that you have.

e) A copy of SG Eddy Current Data Analyst Guidelines, f) A copy of your Site Validated Eddy Current Technique Sheets (acquisition and analysis), along with the supporting EPRI ETSSs.

g) A copy of your EPRI Appendix H Eddy Current Technique Qualification Records.

h) Identify and quantify any SG tube leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition (If applicable).

i) Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube sheet condition, crud removal amounts, etc.).

Enclosure

4 j) Copies of your most recent self-assessments of the SG monitoring, loose parts monitoring, and secondary side water chemistry control programs.

k) Please indicate where the primary, secondary, and resolution analyses are scheduled to take place.

l) Indicate any Alternate Repair Criteria (ARC) (temporary or permanent) that is applicable to the upcoming outage.

A.5 Additional Information Related to All ISI Activities a) A list with a brief description of ISI, BACCP, and SG ISI-related issues (e.g.,

condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 2). For example, a list based upon data base searches using key words related to piping or SG tube degradation such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SG tube examinations.

b) Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams RPVH Exams Snubbers and Supports Repair and Replacement Program Manager Licensing Contact Site Welding Engineer Boric Acid Corrosion Control Program SG Inspection Activities (site lead and vendor contact)

B. Information to be provided on-site to the inspectors at the entrance meeting (September 26, 2011):

B.1 ISI / Welding Programs and Schedule Information a) Updated schedules for ISI/NDE activities, including SG ISI, planned welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Class 1 and 2 welds selected by the inspector from the lists provided from Section A of this enclosure, please provide copies of the following documentation for each subject weld:

i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment iv) Applicable Code Edition and Addenda for welding procedures v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above Enclosure

5 viii) Copies of the nonconformance reports for the selected welds. (If applicable.)

ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs. (If RT was performed.)

x) Copies of the preservice examination records for the selected welds.

xi) Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (at least six months prior to date subject work).

xii) Copies of NDE personnel qualifications (VT, PT, UT, RT) As applicable c) For the ISI-related corrective action issues selected by the inspector from Section A of this enclosure, provide a copy of the corrective actions and supporting documentation.

d) For the NDE reports with recordable indications on Code Class 1 & 2 systems selected by the inspector from Section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.

e) A copy of (or ready access to) the most current revision of the ISI Program Manual and Plan for the current Interval.

f) For the NDEs selected by the inspector from Section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code,Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit; cables; and transducers, including serial numbers) and NDE personnel qualification records.

B.2 Reactor Pressure Vessel Head (RPVH) a) Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH.

b) Provide drawings showing the following: (If a visual examination is planned for the upcoming refueling outage.)

i) RPVH and CRDM nozzle configurations ii) RPVH insulation configuration The drawings listed above should include fabrication drawings for the nozzle attachment welds as applicable.

c) Copy of NDE reports from the last RPVH examination.

d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95% minimum coverage required by Enclosure

6 Code Case N-729-1. (If a visual examination is planned for the upcoming refueling outage.)

e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH. If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations.

f) Provide a copy of the updated calculation of effective degradation years (EDYs) for the RPVH susceptibility ranking.

g) Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations. Also, identify any changes in equipment configurations used for the RPVH examinations which differ from that used in the vendor qualification report(s).

B.3 Boric Acid Corrosion Control Program (BACCP) a) Please provide boric acid walk down inspection results, an updated list of boric acid leaks identified to date for this outage, associated corrective action documentation, and overall status of planned boric acid inspections.

b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage. Please include a status of corrective actions to repair and/or clean these boric acid leaks. Please specify which known leaks, if any, have remained in service or will remain in service as active leaks.

c) In accordance with NRC inspection procedure 71111.08, the inspector would like to conduct an independent boric acid walk down of the Reactor Building early in the inspection week. Please have knowledgeable BACCP staff available to accompany the inspector during the walk down.

B.4 Steam Generator (SG) Inspections a) List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities.

b) Training and certification records for all Qualified Data Analysts.

c) Certificates of Compliance (or Authenticity) for all Eddy Current equipment.

d) Specifications (e.g., drawings) for Eddy Current Calibration Standards.

Enclosure

7 B.5 Codes and Standards a) Ready access to: (i.e. copies provided to the inspector to use for the duration of the inspection at the on-site inspection location, or room number and location where available) i) Applicable editions of the ASME Code (Sections V, IX, and XI) for the inservice inspection program and the repair/replacement program.

ii) EPRI and industry standards referenced in the procedures used to perform the SG tube eddy current examination.

Inspector Contact Information:

Robert Williams Jr. Mailing Address:

Reactor Inspector US NRC Region 2 404-997-4664 Attn: Robert Williams Jr.

robert.williams@nrc.gov 245 Peachtree Center Avenue NE, #1200 Atlanta, GA 30303 Brendan Collins Reactor Inspector 404-997-4420 brendan.collins@nrc.gov Enclosure