Letter Sequence Withdrawal |
---|
|
|
MONTHYEARML1022406482010-08-12012 August 2010 Acceptance Review E-mail, LAR Regarding Revision to (1) TS LCO 2.15, Table 2-5, Item 1, (2) TS 3.1, Table 3-3, Items 1, 2, and 4 Control Element Assembly Position Indication and (3) TS LCO 2.10.2(7)c Project stage: Acceptance Review ML1035501882011-01-0707 January 2011 Request for Additional Information, License Amendment Request, Revise TS 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels and Correction to TS 2.10.2(7)c Project stage: RAI ML1103801272011-02-0404 February 2011 Response to NRC Request for Additional Information (RAI) Regarding Independence of CEA Full-in and Full-out Indication from Primary and Secondary Control Element Assembly (CEA) Position Indication Systems (Ceapis) Project stage: Response to RAI LIC-11-0087, Partial Withdrawal of Fort Calhoun Station, Unit 1, License Amendment Request Revision to Technical Specification 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1, 2, & 4 Control Element Assembly Position Indication & Correction of2011-08-19019 August 2011 Partial Withdrawal of Fort Calhoun Station, Unit 1, License Amendment Request Revision to Technical Specification 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1, 2, & 4 Control Element Assembly Position Indication & Correction of TS Project stage: Withdrawal ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c Project stage: Approval 2011-02-04
[Table View] |
|
---|
Category:Letter type:LIC
MONTHYEARLIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release LIC-18-0027, Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2018-10-0303 October 2018 Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update LIC-18-0003, License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool2018-09-28028 September 2018 License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool LIC-18-0025, Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 20192018-07-19019 July 2018 Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 2019 LIC-18-0023, Fort Calhoun Station, Unit 1 Request for Partial Site Release2018-06-29029 June 2018 Fort Calhoun Station, Unit 1 Request for Partial Site Release LIC-18-0021, Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan)2018-06-0606 June 2018 Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan) LIC-18-0017, Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy2018-04-26026 April 2018 Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy 2023-08-24
[Table view] |
Text
- - -
~~
0".-
Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247 L1C-11-0087 August 19, 2011 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington , DC 20555-0001
REFERENCES:
- 1. Docket No. 50-285
- 2. Letter from OPPD (Jeffrey A. Reinhart) to NRC (Document Control Desk), "Revision to Technical Specification (TS) 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1, 2 and 4 Control Element Assembly Position Indication and CorrectIon of TS 2.10.2(7)c," dated July 12, 2010 (LlC-10-0034)
(ML101930443)
- 3. Letter from NRC (Lynnea Wilkins) to OPPD (D. J. Bannister),
"Request For Additional Information Re: License Amendment Request To Revise Technical Specification (TS) 2.15, Table 2 5, Item 1 and TS 3.1, Table 3-3 , Items 1, 2, and 4, Control Element Assembly Position Indication and Correction of TS 2.10.2(7)c, (TAC No. ME4230)," dated January 11, 2011 (NRC 11-0001) (ML103550188)
- 4. Letter from OPPD (Jeffrey A. Reinhart) to NRC (Document Control Desk), "Response to NRC Request for Additional Information (RAI) Regarding Independence of CEA Full-in and Full-out Indication from Primary and Secondary Control Element Assembly (CEA) Position Indication Systems (CEAPIS)" dated February 4,2011 (L1C-11-0002) (ML110380127)
SUBJECT:
Partial Withdrawal of Fort Calhoun Station, Unit No.1, License Amendment Request (LAR) "Revision to Technical Specification (TS) 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1,2 and 4 Control Element Assembly (CEA) Position Indication and Correction of TS 2.10.2(7)c" The Omaha Pub'lic Power Distdct (OPPD) hereby requests a partial withdrawal of its License Amendment Request (LAR) of Reference 2. OPPD has elected not to change TS 3.1, Table 3-3, Item 2.a following discussions with the NRC that occurred since OPPD responded (Reference 4) to an NRC request for additional information Employment with Equal Opportunity
U. S. Nuclear Regulatory Commission LlC-11-0087 Page 2 (Reference 3). The NRC request pertained to the independence of the CEA position indication system channels.
The result of leaving TS 3.1, Table 3-3, !:tem 2.a unchanged is that the CHANNEL CHECK of the primary CEA position indication system channel can be accomplished through comparison of its data with either distributed control system (DCS) core mimic (if available) or the secondary CEA position indication system channel. However, surveillance of the secondary CEA position indication system channel can only be met by comparison with the primary CEA position indication system channel.
No commitments to the NRC are made in this letter.
If you should have any questions regarding this submittal or require additional information, please contact Mr. Bill R. Hansher at (402) 533-6894.
I dec'lare under penalty of perjury that the foregoing is true and correct. Executed on August 19, 2011.
effrey A. Reinhart Site Vice President Attachments 1. Technical Specification Page Markup
- 2. Retyped ("Clean") Technical Specification Page c: Director of Consumer Health Services, Department of Regulation and Licensure, Nebraska Health and Human Services, State of Nebraska
LlC-11-0087 Page 1 Technical Specification Page Markup 1 1 Deleted text shown in strikeout; added text in underline .
TECHNICAL SPECIFICATIONS TABLE 3-3 MINIMUM FREQUENCIES FOR CHECKS, CALIBRATIONS AND TESTING OF MISCELLANEOUS INSTRUMENTATION AND CONTROLS Surveillance Channel Description FunctiQ.!! Frequency Surveillance Method
- 1. Primary CEA Position a. Check S a. Comparison of output data with secondary CEAPIS.
Indication System CHANNEL CHECK
- b. Test M b. Test of power dependent insertion limits, deviation, and sequence monitoring systems.
- c. Calibrate R c. Physically measured CEDM position used to verify system accuracy. Calibrate CEA position interlocks.
- 2. Secondary CEA Position a. Check S a. Comparison of output data with primary CEAPIS.
Indication System
- b. Test M b. Test of power dependent insertion limit, deviation ,
out-of-sequence, and overlap monitoring systems.
- c. Calibrate R c. Calibrate secondary CEA position indication system and CEA interlock alarms.
- 3. Area and Post-Accident a. Check 0 a. CHANNEL CHECK Radiation Monitors(1)
- b. Test Q b. CHANNEL FUNCTIONAL TEST
- c. Calibrate R c. Secondary and Electronic calibration performed at refueling frequency. Primary calibration with exposure to radioactive sources only when required by the secondary and electronic calibration .
RM-091 AlB - Calibration by electronic signal substitution is acceptable for all range decades above 10 R/hr. Calibration for at least one decade below 1-R/hr. shall be by means of calibrated radiation source.
(1)Post Accident Radiation Monitors are : RM-063, RM-064, and RM-091 AlB . Area Radiation Monitors are: RM-070 thru RM-082, RM-084 thru RM -089, and RM-095 thru RM-098.
3.1 - Page 15 Amendment No. 8.81.86.93.137.152.164.171, 2.a7
LI C~ 11 -0087 1
Retyped ("Clean") Technical Specification Page
TECHNICAL SPECIFICATIONS TABLE 3-3 MINIMUM FREQUENCIES FOR CHECKS, CALIBRATIONS AND TESTING OF MISCELLANEOUS INSTRUMENTATION AND CONTROLS Surveillance Channel Description Function Frequency Surveillance Method
- 1. Primary CEA Position a. Check S a. CHANNEL CHECK Indication System
- b. Test M b. Test of power dependent insertion limits, deviation, and sequence monitoring systems.
- c. Calibrate R c. Physically measured CEDM position used to verify system accuracy. Calibrate CEA position interlocks.
- 2. Secondary CEA Position a. Check S a. Comparison of output data with primary CEAPIS.
Indication System
- b. Test M b. Test of power dependent insertion limit, deviation, out-of-sequence , and overlap monitoring systems.
- c. Calibrate R c. Calibrate secondary CEA position indication system and CEA interlock alarms .
- 3. Area and Post-Accident a. Check 0 a. CHANNEL CHECK Radiation Monitors(1)
- b. Test Q b. CHANNEL FUNCTIONAL TEST
- c. Calibrate R c. Secondary and Electronic calibration performed at refueling frequency. Primary calibration with exposure to radioactive sources only when required by the secondary and electronic calibration.
RM-091 AlB - Calibration by electronic signal substitution is acceptable for all range decades above 10 R/hr. Calibration for at least one decade below 1-R/hr. shall be by means of calibrated radiation source.
(1) Post Accident Radiation Monitors are: RM-063, RM-064 , and RM-091 AlB. Area Radiation Monitors are: RM-070 thru RM-082 ,
RM-084 thru RM-089, and RM-095 thru RM-098.
3.1 - Page 15 Amendment No. 8.81.86.93.137.152.164.171 , 2.§.7