Text
August 15, 2011 Barry D. Leemann, Chairman Oswego County Legislature County Office Building 46 East Bridge Street Oswego, New York 13126
Dear Mr. Leemann:
On behalf of the Nuclear Regulatory Commission (NRC) Chairman, Gregory B. Jaczko, I am responding to your letter of July 12, 2011, regarding the planned strike by International Brotherhood of Electrical Workers Local 97 at the Nine Mile Point Nuclear Station (NMPNS) operated by Constellation Energy Nuclear Group (CENG). As you know, a strike commenced at 12:01 a.m. on July 9th.
In advance of the strike, the NRC completed an inspection of the facilitys strike contingency plan, in accordance with established inspection procedures, to evaluate the plans adequacy and to ensure that public health, safety, and security would be maintained during the strike.
This inspection verified that Constellation had properly trained operators and other personnel, including the emergency response organization (ERO), who would safely perform replacement functions during the strike. The inspectors also reviewed the plan to ensure site staffing would be sufficient and qualified to implement the site emergency plan by comparing the contingency ERO staffing plan to the normal ERO staffing plan.
On July 8th at 10:00 p.m., two hours prior to the strike commencing, the NRC resident inspectors, supplemented by regional inspectors, implemented 24-hour coverage at the site.
This around-the-clock coverage continued for two weeks, at which time it was determined that this degree of oversight was no longer warranted. The regional branch chief responsible for NMPNS also was on site for the initial days of the strike to manage resident and regional inspection resources, to interface with site senior management and union representatives to reinforce the importance of continued safe operation of the facility, and to assess NMPNSs contingency plan implementation to ensure that CENG met its regulatory requirements.
On July 26th, the members of International Brotherhood of Electrical Workers Local 97 voted to approve the new contract. The NRC continued to provide enhanced oversight and closely monitored the situation following the return of the workers to the site.
B. Leemann 2
During the period of the strike, the NRC inspectors observed that both plants were operated safely and in compliance with NRC regulations. No deficiencies were identified that were determined to be more than minor. If you have any questions, please contact me or Mr. Glenn Dentel, Branch Chief, at (610) 337-5233.
Sincerely,
/RA/ Original Signed by David C. Lew for William M. Dean Regional Administrator
B. Leemann 2
During the period of the strike, the NRC inspectors observed that both plants were operated safely and in compliance with NRC regulations. No deficiencies were identified that were determined to be more than minor. If you have any questions, please contact me or Mr. Glenn Dentel, Branch Chief, at (610) 337-5233.
Sincerely,
/RA/ Original Signed by David C. Lew for William M. Dean Regional Administrator Distribution: G20110547/LTR No:11-0423/EDATS:SECY-2011-0423 R. Borchardt, OEDO M. Virgilio, DEDR M. Weber, DEDMRT N. Mamish, AO S. Burns, OGC D. Ash, DEDCM E. Leeds, NRR J. Wiggins, NSIR R. Schmidt, OCA J. McHale, RI, OEDO W. Dean, RI D. Lew, RI R. Barkley, RI RIDSEDOMAILCENTER RESOURCE RIDSSECYMAILCENTER RESOURCE RIDSOGCMAILCENTER RESOURCE RIDSOCAMAILCENTER RESOURCE RIDSOCFOMAILCENTER RESOURCE RIDSNRROD RESOURCE RIDSRGN1MAILCENTER RESOURCE SUNSI Review Complete: RSB (Reviewer=s Initials)
Non-Public Designation Category: MD 3.4 Non-Public (A.3 - A.7 or B.1)
DOCUMENT NAME: G:\\ORA\\Barkley\\G20110547 B Leemann Response.docx ADAMS Package Accession No: ML112270451 After declaring this document AAn Official Agency Record@ it will be released to the Public. ADAMS Document Accession No.:ML112270461 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE sgm RI/DRP RI/TCA RI/DRP RI/RA NAME GTDentel/GTD*
RSBarkley/RSB*
DJRoberts WMDean/DCL for DATE 08/10/2011 08/10/2011 08/15/2011 08/15/2011
- See Previous Concurrence OFFICIAL RECORD COPY